STRUKTUR ORGANISASI

ENGINEER/KOORDINATOR SITE

ENGINEERING PIT OPERATION

GEOLOGY MINE PLAN SUPERVISOR 1 SUPERVISOR 2

WELL SITE SURVEYOR FOREMAN FOREMAN


OPERATOR ASS SURVEY FOREMAN FOREMAN
KRU KRU
KRU KRU
KRU KRU
KRU KRU

KOMPONEN GAJI

1 KOORDINATOR SITE = Rp 10,000,000


2 MINEPLAN = Rp 7,500,000
3 GEOLOGIST = Rp 6,000,000
4 SUPERVISOR = Rp 7,500,000
5 FOREMAN = Rp 5,000,000