CONTRACT BILLING
INVOICE #1
JULY, 2023
ITEM# DESCRIPTION DATE UNIT QTY. UNIT PRICE ITEM PERCENTAGE AMOUNT NOTES
Excavation and earthwork
Clean site completely of any waste, refuse, and garbage,
29-May-2023 NO. 9 500.00 100% 4,500.00
and remove all debris outside the site and land leveling
1 work as drawings.
30-May-2023 NO. 4 500.00 100% 2,000.00
18-Jun-2023 NO. 5 500.00 100% 2,500.00
Demolish
Demolish floors, gypsumand/ or block partition on walls
2 and any materials attached to them, such as tiles…etc.
بالمقطوعية تكسير االرضيات والحوائط وكل ما يلزم العاده التطوير
بداخل الفيال.
Purchasing
Providing the essential materials needed to construct,
4 plaster and carry out the proposed designs.
توريد المواد األساسية الالزمة لإلنشاءات والمحارة و كل ما يلزم لتنفيذ
التصاميم المقترحة.
Plumbing
Take apart all the flush tanks located on the site and
5 29-May-2023 LUM. 1 2,000.00 100% 2,000.00
place them in safe storage.
فك جميع خزانات الدفن و تخزينها فى المخزن
TOTAL 40,750.00