{OJECT + GFO-THCHNICAL-INVESTIGATION FOR COSTRUCTION OF SURAT METRO PROJECTsuing wonnquasg 2s appa
a ¥ npn sy a et Yen a
Ta Beg OEZES en SRI
ATT SOIANAS ADNVLTASNOD HidPTH CONSULTANCY SERVICS LLP
LUNCONSOLIDATED UNDRAINED TRIAXIAL SHEAR TEST
(45:2720 Par-X11993,RA- 2016)
Project: Gotechnical vestigation fe Design, Construction and Conpetion of Underground Stations and Tunnel ined fnishs fom Kapodea Rar
‘Sort Ra vay Station om Chainage 3700 07160, comping win bred underground tans tween Norther Ramp and Sut Metro Staton all ct
‘and coer ponion incloing 3 underground sions viz Kapa, Labeshvar Chowk and Cental Warchouse wih eny/exts& connecting subway by box
ishing method and a pon of NATM and Launching and Resivng Chambers of TBM for Surat Neto Ral Poet, Plas
eT oe Stress tin Cune
[Bocehole No, [DI-ABHOF = a ea an
Jemocnim fm
sme lis i
ns ee
sample Type lundisurbed 0 -_
leva cinecion fs | no tetnt
fnitialFicight yer) 76. . . * i Strin, % - “ *
own coves cincte
faundeninconcey fia
oda ceninr _fise
frst Rete z
F
[owns sass
o | | 2
laser
JRate of Strain (men’min) | 1.25 128 125 . 1 z ’ 5 .
meee
|= a eld 2925 aims | 3.543 ‘Stress C (Failure Envelog
Batre . oceanic tn)
con ner, ss | t
e-em) E
tester
ee" 9® ere)PTH CONSULTANCY SERVICS LLP
DIRECT SHEAR TEST
S720 Poet XI).1986, RA-2016)
Project : Gace nvesgaton fr Design, Construction and Completion of Underround Staton and Tunel including finishes rm Kapodra Ramp to Surat,
Railay tion fom Chine 3700m 07160 sm, comping twin bred underground tunnel between Norham Ramp and Surat Meo Sin, ll su and cover
‘potion including 3 underground stations vie Kapaa, abexivay Chowk nd Cetrsl Warchouse with enryents & connecting subway by bos pushing mead
‘ka potion of NATM and Launching and Receiving harers of TBM for Sul Meto Ral Projet, Phase
Kaneda frst
ounene Dieaiios ——fonmt res ent 0s 1 2
ao on én a inom as as bs
— ws jess otierzens | 1s one one
freconcimin fiw ah sc win iter Deeet ati [55g on on
bare Unie
coin ert me
(sem)
at as ene) -
oo secon uw
ocr
fico alos
Shear rome
ox
ow
oas
é
‘Sear Stress (Kpom2)
ois
010
005
0 os ' Ls 2 as
Normal Stress (Kglem2)PTH CONSULTANCY SERVICS LLP
UNCONFINED COMPRESSION TEST
(19:2720 (Part-X)-1991, RA 2020)
Projet = Gcotechnicalinvestgatio for Design, Construction and Completion of Underground Stations and Tunnel nding Wishes for
apodra Ramp to Surat Railway Station from Chainage 3700m to 7160.6, comorsng tn Dred underground tunnel between Northen
amp and Surat Metro Staton, al cut and cover portion induting 3 underground stations vi Kopdra, abeshwar Chowk and Central
‘orehouse with entry/exit & connecting subway by bx pushing method ana portion of NATM and Launching and Recelving Chambers of
"TEM for Surat Metro Ral reed, Phase
{Sample Details
lBorhote No. DI-ABH-O9 Bulk ensity cence) 22
[sample Det 9m [Dey density (ames) ea
[sampie No. ps3 Moisture Coment 2437
Brown Medium Pasic Cay with [Unconfined compresive
Isampie Desrigton 5
imple Desens sit strength qu (oem) in
cohesion intercept,
ample Type Undisturbed ; 0373
Cem’
Stress- Strain Curve
140
120
1.00
a0
020
000
090 = on10, 00% = 0030 nays] KTR
StrainPTH CONSULTANCY SERVICS LLP
LUNCONSOLIDATED UNDRAINED TRIAXIAL SHEAR TEST
(4S:2720(PartXD 1983, RA- 2016)
Project: Gatechnical investigation fe Design, Consraction an Capleton of Underground Stations and Tunnel including nshes om Kapodra Ramp o
‘Surat Ravay Station om Change 3700 07160, comprising win bred undearond tunne! betwee Norte Ramp and Strat Metro Son al cat
‘cover oon inching 3 underground stains iz Kapa, Labeshvar Chow and Cental Warehouse wth eyes & comeing subway by box
sing mth anc a ponon of NAFM and Launching and Receiving Chamber f TEM fr Sut Metro Rall Project Phase
sample Detts . Stress Strain Curve
Boreole No, longo» _
[sample Dethimy fm ws
[sample to luos-+
laconn Medium Pate Cay with
fieDesenrtion | Sicand Fine Sand ow
same Type nisunbea oa
frit Diameercom) [3.8 ens
MOIR COLUMN CIRCLE
Bu density (gees J224 =e
De densiycemicer 8s
soir Cone
(Test Rens "
[cooing Presure 5 :
kisien’s : 0
Irazorssincmmniny | 2s fas | ias Ws 1 2 ‘
sak Devitr see at
ais ogeae ron | 137 | 1681 oe Sess Cure (Faure Envelope)
|cabcson ners,
‘i os
rer Ggiem's
Ange o ternal
Isction 9” (degre)
sven (nism
elon (119PTH CONSULTANCY SERVICS LLP
Consolidation Test
(4S:2720 (Part-XV)
role: Geotechnical Investigation for Osgn Construction and Completion of Underground Satins and Tunnel ncuting fishes fom Kapodra Rar 9
‘Surat Rata Station from Chainage 3700 to 7260.6, compen twin bored underground tunnel between Northern Ramp and Surat Metro Staton,
cut and cover portion incusing 3 underground stations ve Kapaa, Labeshwar Chowk and Central Warehouse wth entry/exit & connecting subway by box
‘pushing method anda portion of NATMand Launching and Receving Chambers of TAM for Surt Matra al Pojct. Phase
Log (Pressure) kgm
Sample Details
orehoe No. DI-ABH-O [ut easy ere) i
samp Deh 3m brs demi tes) 146
sare No. ups. Moisture Content 6 19029
[Sample Description Brown High Plastic Cay with Sit |p Consolidation Pressure (Pe) 2.65
far
sane Type Unciscubes Compression dex (Co) an
e-log P curve of Consolidation Test
0550 ~
0500
0430 N
2
400
|
0350
{| |
Ll |
0.300
a0 1.00 10.00