For C2:

Total Dead load from 1st to Roof deck: 1005.84 KPa


Total Live load from 1st to Roof deck: 572 KPa

Wu=1.2 DL+1.6≪¿Wu=1.2 ( 1005.84 kPa ) +1.6 ( 572 kPa )Wu=212.2208 kPa


Pu=WuxAf Pu=( 212.2208 kPa ) ( 10 m2 ) Pu=2122.208 kN
*Ast = 0.025Ag
*fc=27
*Fy=414
Pu=Ø ‫ ( ے‬Pconcrete+ Psteel ) Pu=0.65 ( 0.8 ) ( 0.85 f c ' ( Ag− Ast ) + AstFy )
2122.208 x 103 =0.65 ( 0.8 ) ¿ Ag=124706.2902 mm2 Ag=s2 s= √ Ag s= √124706.2902 mm 2
s=353.1378mmsay : 400 mm
Number of bars in C2:

Pu=( 0.65 )( 0.8 ) ( 0.85 f c' ( Ag−Ast ) + AstFy )


2122.208 x 10 =( 0.65 )( 0.8 ) ( 0.85 ( 27 )( 400 x 400−Ast ) +414 Ast ) Ast =1046.334818m m2
3

Ast 1046.334818 m m2
n= n=
π π n=5.2040say 6 bars
( db )2 ( 16 )
2
4 4

Diameter of ties: 10 mm
Spacing of Ties (Lowest)
16 db 48 dties Minimum dimension
16 x 16 48 x 10 400
256 say 250 mm 480 mm 400 mm

FOR C2, use 400x400 mm column with 6-18mm bars and ties of 10 mm spaced at 250 mm!