SOMEWHERE RESTAURANT

UN/T GL 9,10& 11 @ MARINA MALL, ABU DHABI,UAE


MAIN CONSTRUCTION WORKS - TENDER
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


BILL NO. 1
PRELIMINARIES & GENERAL REQUIREMENTS

Description of the Works

The scope of works consists of the MEP works including supply,


1 Item 0 0.00
installation, testing and commissioning of the retail space.

Location of the Site

The site upon which the Works are to be constructed is located in


2 Item 0 0.00
Abu Dhabi, U.A.E.

Maintenance of Existing Services On, Under or Over the Site

Establish the positions of, divert, protect, uphold and maintain all
3 pipes, ducts, sewers, service mains, overhead cables, etc, during the Item 0 0.00
execution of the Works.

Contractor's Administrative Arrangements

Site Administration & Staff Cost

MEP Contractor to Provide for all on and off-site administration costs


4 Item 0 0.00
including staff cost.
Supervision Cost
The MEP Contractor shall provide all necessary supervision for the
5
execution of the works

Records, As Built Drawings, Operation & Maintenance Manuals

The MEP Contractors shall submit to the Engineer all Records, As


Built Drawings and Operation and Maintenance Manuals for the
6 Item 0 0.00
Works; all in accordance with the relevant clauses in the
Specification.

Safeguarding the Works, Materials & Plant against Damage &


Theft

The MEP Contractor shall provide all requirements for safeguarding


7 the Works, materials and plant, including that being the responsibility Item 0 0.00
of Sub-Contractors, against damage from any cause.

Safety, Health and Welfare of Workpeople

Provide for all costs complying with HSE standards with all safety,
8 health and welfare regulations appertaining to all workpeople Item 0 0.00
employed on the Site.

Transport for Work people

The MEP Contractor shall include the transportation cost to and from
9 Item 0 0.00
the Site.
SOMEWHERE RESTAURANT
UN/T GL 9,10& 11 @ MARINA MALL, ABU DHABI,UAE
MAIN CONSTRUCTION WORKS - TENDER
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

Constructional Plant

Small Plant and Tools

Provide all small plant, implements, tools, etc, with all consumable
and equipment necessary for the proper execution of the Works and
10 Item 0 0.00
include for maintaining, adapting, moving and removing as necessary
throughout the completion.

Scaffolding

The MEP Contractor shall allow for providing, altering, and adapting
all scaffolding, guard rails, walkways, toe boards, ladders, etc,
11 Item 0 0.00
necessary for the proper execution of the Works by himself and all
Sub-Contractors.

Plant & Machinery

The MEP Contractor shall Provide all cranes, hoists, transport


facilities, lifting equipment and all other necessary plant and
12 Item 0 0.00
machinery with all consumable for the proper execution of the MEP
Works.
Contractor's Facilities
Allow temporary buildings and work areas such as site offices,
13 workshops, stores, shall be constructed in positions approved by the Item 0 0.00
Engineer representative within the proposed site boundary.

Temporary Hoardings

14 The Contractor to provide perimeter site hoardings Item 0 0.00

Temporary Power & Water for the Works

The Contractor shall provide Temporary power & water for the
15 Item 0 0.00
execution of the Works

Materials and Workmanship

The MEP Contractor shall furnish for approval, with reasonable


16 promptness, all samples of materials and workmanship required by Item 0 0.00
the Engineer.

Protection of the Works

The MEP Contractor shall carefully cover up, and protect the Works
17 Item 0 0.00
from inclement or damaging weather conditions.

Control of Noise and Pollution

The Contractor shall ensure that excessive noise and pollution does
18 Item 0 0.00
not occur during the execution of the Works.
SOMEWHERE RESTAURANT
UN/T GL 9,10& 11 @ MARINA MALL, ABU DHABI,UAE
MAIN CONSTRUCTION WORKS - TENDER
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


Removing Rubbish and Cleaning the Works

The Contractor shall provide constantly available labour, transport


19 and materials to maintain the cleanliness and tidiness of the site on a Item 0 0.00
daily basis.

All Statutory Obligations

The Contractor's attention is drawn to Laws of the United Arab


Emirates, and in particular the Laws governing employment. No
20 Item 0 0.00
foreign labour shall be employed without the necessary approval of
the U.A.E Government.

Site Meetings

The MEP Contractor shall attend site meetings as and when required
21 Item 0 0.00
by the Engineer.

Requirements for Programme and Progress Charts

Baseline programmes inline with main contractor programmes shall


22 Item 0 0.00
be prepared by the Contractor and submitted.

Taking Over Existing Works

The MEP Contractor shall take over of the existing works as shown
23 Item 0 0.00
on the drawing(s) and as specified by the Engineer

Performance Security / Insurances

The Contractor is to list hereunder all costs to comply with the


24 necessary security and insurance levels required by the
Conditions of Contract.

i (i) Advance Payment Security Item 0 0.00

ii (ii) Performance Security Item 0 0.00

25 Insurances

i (i) Contractors All Risk Item 0 0.00

ii (ii) Third Party Item 0 0.00

iii (iii) Workmen's Compensation Item 0 0.00


SOMEWHERE RESTAURANT
UN/T GL 9,10& 11 @ MARINA MALL, ABU DHABI,UAE
MAIN CONSTRUCTION WORKS - TENDER
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


BILL NO. 3.A
MECHANICAL ENGINEERING INSTALLATIONS
Supply,Installation T&C as per detailed in the
Specifications and on the Drawings and to the complete
satisfaction and approval of the Engineer and all concerned
Statutory Authorities and under the following sections
3.A.1 DRAINAGE INSTALLATIONS
Supply,Installation T&C of Pipe work of any kind such as waste,
condensate, including all the necessary fittings ,Support , etc. all as
specified and as shown on drawings and complying the specification
HDPE Pipes

A 40 mm diameter m 26

B 50 mm diameter m 16

C 80 mm diameter m 18

D 110 mm diameter m 24

E Connection to the exisitng Stubout line Item

uPVC Class E Pipe

A 25 mm diameter m 32

B 32 mm diameter m 8

C 50 mm diameter m 16

Supply,Installation T&C of Elastomeric rubber for condensate drain pipe


Insulation including all adhesive and coatings as per the specification.
Elastomeric rubber insulation

A 25 mm diameter m 32

B 32 mm diameter m 8

C 50 mm diameter m 16

Supply,Installation T&C ofFloor Clean Outs,Floor Traps & Grease Trap


including all adhesive and coatings as per the specification.
Floor Clean Outs,Floor Traps & Grease Trap

A 110mm diameter FCO No 7

B Floor Trap No 15

C Grease Trap No 2

Additional Items

The contractor shall list here and price any items shown on the drawings,
mentioned in the specification and schedules or required for the
satisfactory completion of this section, but not mentioned in here generally

Page 3.A/1
SOMEWHERE RESTAURANT
UN/T GL 9,10& 11 @ MARINA MALL, ABU DHABI,UAE
MAIN CONSTRUCTION WORKS - TENDER
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


3.A.2 WATER SUPPLY INSTALLATIONS
Supply,Installation T&C of Pipe work for water supply works including all
the necessary fittings ,Support , etc. all as specified and as shown on
drawings and complying the specification
PPR Pipe

A 20 mm diameter m 106

B 25 mm diameter m 12

C 32 mm diameter m 11

D 40 mm diameter m 7

E Connection to the exisitng line Item

Supply,Installation T&C of Elastomeric rubber Insulation hot water pipes


including all adhesive and coatings as per the specification.
Elastomeric rubber insulation

A 20 mm diameter m 18

B 25 mm diameter m 2

C 32 mm diameter m 18
Supply,Installation T&C of Vales & accessories is as per the drawing and
specification.
Gate Valves

A 25 mm dia Gate Valve Nos 4

B 32 mm dia Gate Valve Nos 2

C 40 mm dia Gate Valve Nos 2

Supply,Installation T&C of Water Hammer Arrestor as per the drawing


and specification.
Water Hammer Arrestor

A 12" Water Hammer Arrestor Nos 7

Supply,Installation,T&C of Horizontal electric water heater including


drain pipe, connections, accessories, etc. as specified and as shown on
drawings and specification
Water Heater

A 100 Ltrs Water Heater Nos 1

Additional Items

The contractor shall list here and price any items shown on the drawings,
mentioned in the specification and schedules or required for the
satisfactory completion of this section, but not mentioned in here generally

Page 3.A/2
SOMEWHERE RESTAURANT
UN/T GL 9,10& 11 @ MARINA MALL, ABU DHABI,UAE
MAIN CONSTRUCTION WORKS - TENDER
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


3.A.3 FIRE FIGHTING SYSTEM INSTALLATION Item 0.00
Supply,Installation T&C of GI Pipe work of sprinkler system including all
the necessary fittings ,Support , etc. all as specified and as shown on
drawings and complying the specification

ERW Sch 40 GI Pipe

A 25 mm diameter m 60

B 32 mm diameter m 8

C 40 mm diameter m 12

D 50 mm diameter m 16

E Connection to the existing line Item 1

Supply,Installation T&C of Extinguishers & Blankets including all the


necessary fittings ,Support , etc. all as specified and as shown on drawings
and complying the specification
Fire Extinguishers & Blanket

A 5 KG CO2 Fire Extinguisher Nos 1

B 2 KG CO2 Fire Extinguisher Nos 3

C 4 KG DCP Fire Extinguisher Nos 3

D 6 LTR Wet Chemical Fire Extinguisher Nos 2

E Fire Blanket Nos 2

Supply,Installation T&C of Sprinklers including all the necessary


fittings ,Support , etc. all as specified and as shown on drawings and
complying the specification
Sprinklers

A 1/2" Recessed type Pendent Sprinkler Nos 27

Supply,Installation,T&C of Wet Chemical Fire Suppression System


including all necessary interface as specified and shown on drawings and
complying the specification
Wet Chemical Fire Suppression System

A Wet Chemical Fire Suppression System for Kitchen Hood Item 1

Additional Items

The contractor shall list here and price any items shown on the drawings,
mentioned in the specification and schedules or required for the
satisfactory completion of this section, but not mentioned in here generally

Page 3.A/3
AIR-CONDITIONING AND VENTILATION INSTALLATIONS
SOMEWHERE RESTAURANT
UN/T GL 9,10& 11 @ MARINA MALL, ABU DHABI,UAE
MAIN CONSTRUCTION WORKS - TENDER
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


Supply,Installation T&C of CHW FCU's including all the necessary
fittings ,Support , etc. all as specified and as shown on drawings and
complying the specification
Chilled Water Fan Coil Units
A CHW FCU 9.56 kW Nos 2

B CHW FCU 10.14 kW Nos 1

C CHW FCU 17.54 kW Nos 3

D Thermostat Nos 6

Supply,Installation T&C of FAHU including all the necessary


fittings ,Support , etc. all as specified and as shown on drawings and
complying the specification
Chilled Water Fresh Air Handling Unit

A CHW FAHU 67.1 kW Nos 1

Supply,Installation T&C of Ecology Unit including all necessary


filters,extract fans the necessary fittings ,Support , etc. all as specified and
as shown on drawings and complying the specification
Ecology Unit

A ESP Nos 1

B CF Nos 1

C Extract Air Fan 5360 CFM Nos 1

Supply,Installation T&C of Duct work inlding all necessary necessary


fittings ,Supports,Insulation ,Accoustic lining , cladding worksetc. all as
specified and as shown on drawings and complying the specification
Duct Work

A Supply Air Duct GI SQM 78

B Make up Air Duct GI SQM 62

C Extract Air Duct Fire Rated MS SQM 74

D Aluminium Cladding SQM 60

Supply,Installation T&C of Chilled water pipe work including bends,


valves, fittings, fixing accessories, insulation, cladding,as specified and as
shown on drawings and complying the specification
CHW Pipes Seamless Black Steel
A 25 mm diameter m 34

B 32 mm diameter m 25

C 40 mm diameter m 11

D Connection to the existing CHW Tap in point Item 1


Page 3.A/4
SOMEWHERE RESTAURANT
UN/T GL 9,10& 11 @ MARINA MALL, ABU DHABI,UAE
MAIN CONSTRUCTION WORKS - TENDER
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


AIR-CONDITIONING AND VENTILATION INSTALLATIONS
Supply,Installation T&C of Valve packages for FCU's including
union,Flexible Connections,PICV's Gate Valves,Strainers,Drain Valves as
specified and as shown on drawings and complying the specification
Valve package
FCU Valve Packages Items 6

Supply,Installation,T&C of Air Outlets including GI rings etc as specified


and as shown on drawings and complying the specification
Air Outlets
A SLG-1 Slot x 8000 Nos 1

B SLG-1 Slot x 2500 Nos 1

C SLG-1 Slot x 3800 Nos 1

D SLG-1 Slot x 4300 Nos 1

E SLG-1 Slot x 6800 Nos 1

F RLG-1 Slot x 1000 Nos 1

G RLG-1 Slot x 1100 Nos 1

H RLG-1 Slot x 7600 Nos 1

I RLG-1 Slot x 4300 Nos 1

J RLG-1 Slot x 3800 Nos 1

K RLG-1 Slot x 7400 Nos 1

L SAD 600x600 Nos 10

M SAD 300x300 Nos 2

N RAD 600x600 Nos 10

O RAD 300x300 Nos 2

Supply,Installation,T&C of Dampers including all accessories as specified


and as shown on drawings and complying the specification
Volume Control Dampers
A VCD 200 mm dia Nos 24

B VCD 450x200 Nos 8

C VCD 350x200 Nos 1

D VCD 150x150 Nos 1

E VCD 600x450 Nos 2

F VCD 400x250 Nos 1

G VCD 300x200 Nos 1


Page 3.A/5
SOMEWHERE RESTAURANT
UN/T GL 9,10& 11 @ MARINA MALL, ABU DHABI,UAE
MAIN CONSTRUCTION WORKS - TENDER
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


AIR-CONDITIONING AND VENTILATION INSTALLATIONS
Supply,Installation,T&C of Flexible Duct connectors including all
accessories as specified and as shown on drawings and complying the
specification
Flexible Duct Connector

A Flexible Duct Connector Item 1

Additional Items

The contractor shall list here and price any items shown on the drawings,
mentioned in the specification and schedules or required for the
satisfactory completion of this section, but not mentioned in here generally

Page 3.A/6
SOMEWHERE RESTAURANT
UN/T GL 9,10& 11 @ MARINA MALL, ABU DHABI,UAE
MAIN CONSTRUCTION WORKS - TENDER
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


MECHANICAL ENGINEERING INSTALLATIONS

A Drawings, manuals, approvals & instruction books Item

B Testing and commissioning Item

C Training Item

D Labels, special tools, etc. Item

E Protective and decorative painting Item

F Liaison and co-ordination with Local Authorities Item

Page 3.A/7
SOMEWHERE RESTAURANT
UN/T GL 9,10& 11 @ MARINA MALL, ABU DHABI,UAE
MAIN CONSTRUCTION WORKS - TENDER
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


BILL No 3A-MECHANICAL ENGINEERING INSTALLATIONS
COLLECTION

Page 3.A/1

Page 3.A/2

Page 3.A/3

Page 3.A/4

Page 3.A/5

Page 3.A/6

Page 3.A/7