Revision History

1 30.01.201 FOR COMMISSIONING LDI SKN SSV


0 08.01.201 FOR COMMISSIONING LDI SKN SSV
A 20.11.201 FOR APPROVAL SGA SKN SSV
4
REV DATE DESCRIPTION PREPARED CHECKED APPROVED

DOCUMENT TITLE/SUBJECT:

TESTING AND COMMISSIONING PROCEDURE FOR 6.3kV SWITCHGEAR BUS BAR

PROJECT DOCUMENT NO:


Size A-4
Detailed Information

Proje Syste Serial


Type
Doc.
Disc

Unit Orig. Lang. Eng.


ct m No

GAC 12 VX RMH LAH 003 No. of 03


Sheet
TESTING AND
Doc. No. : GAC-12-VX-RMH-LAH-003
COMMISSIOING PROCEDURE
Page : 2 OF 3
FOR Revision :1
6.3kV SWITCHGEAR BUSBAR

Rev.
1
No:

TABLE OF CONTENTS

1.0 Objective : 03

2.0 Methodology : 03

3.0 Acceptance Criteria : 03

4.0 Attachments : 03

This document is the property of ÇALIK Enerji Sanayi ve Ticaret A.Ş and may not be copied, used, reprinted or distributed by others
TESTING AND
Doc. No. : GAC-12-VX-RMH-LAH-003
COMMISSIOING PROCEDURE
Page : 3 OF 3
FOR Revision :1
6.3kV SWITCHGEAR BUSBAR

1.0 Objective:

Objective of this document is to have a written down procedure for the commissioning
related activities for 6.3 kV Switchgear Bus bar including bus VT.

2.0 Methodology:

Broadly the methodology of the commissioning is as below:

 Checking the completeness of the erection of the equipment and accessories.


 Checking the completeness of terminations of the power and control cables as
per the engineering drawings and ensuring its continuity checks.
 Conducting the pre-commissioning checks of the switchgear bus bar and
associated equipment and checklists (attached) are signed off.

3.0 Acceptance Criteria.

 6.3 kV Switchgear Bus bar has been commissioned in compliance with checks
and tests mentioned in the above attachments.
 6.3 kV Switchgear Bus bar operating parameters are within the acceptable
range.

4.0 Attachments:

Following documents, attached with this document, may be referred for conducting the
pre-commissioning and commissioning activities for 6.3kV Switchgear bus bar:

 Attachment 1: Pre-commissioning check: 6.3kV Switchgear Busbar


 Attachment 2: Pre Commissioning Tests: Insulation Resistance (IR) Test of 6.3kV
Switchgear Bus Bar
 Attachment 3: Pre Commissioning Tests: Voltage Transformer of Bus Section 1
 Attachment 4: Pre Commissioning Tests: Voltage Transformer of Bus Section 2
 Attachment 5: Commissioning Checks: 6.3kV Switchgear Busbar

This document is the property of ÇALIK Enerji Sanayi ve Ticaret A.Ş and may not be copied, used, reprinted or distributed by others

You might also like