Project HIGHWAY PROJECTS IN INDIA (4 laning of Hubli-Hospet section of Nh-63)

Subject Design of Box type Structure With PQC of 300 m above box top

Configuration of Box
loading on deck clear span (a) 2.500
VC (b) 1.700
top slab thick 0.325
bottom slab th 0.325
side wall th 0.325
loading on bottom slab eff. Span 2.825
width of deck 12.00
ll sur p epr epr ll sur pr b/lo 4.2478
k 2.600

Step-1 Estimation of Loading on Top slab Applicable for Cast in situ construction

Applicable for edge panel of 1 m (i.e near crash barrier or kerb + parapet zone)
Due to crash barrier Err:511 1.24 t/sqm effective from end to 0.890 m
Due to wearing coat (PQC =300 mm ) 0.75 t/sqm effective for c/w width
Due to live load on c/w

C-1 Class 70 T vehicle with minimum clearance from kerb/crash barrier


beff = kx(1-x/lo)+bw Err:511 3.29 m
Beff for design Err:511 5.34 m
length of dispersion Err:511 2.83 tm
Impact factor Err:511 1.25
Load intensity Err:511 3.59 t/sqm

C-2 Class 70 bogie vehicle with minimum clearance from kerb/crash barrier
x1 Err:511 1.413 m x2 Err:511 0.193
beff 1 Err:511 3.30 m beff. 2 Err:511 1.926
beff. For design Err:511 5.256 m beff. For design Err:511 3.886
length of dispersion Err:511 1.513 m dispersion leng. Err:511 1.513
IF Err:511 1.250 IF Err:511 1.25
Load intensity Err:511 3.144 t/sqm Load intensity Err:511 4.2516

effective from 0.656 to 2.169 effective from 0 to 0.949

C-2 Class 70 bogie vehicle with minimum clearance from kerb/crash barrier
x1 Err:511 0.132 m x2 Err:511 1.352
beff 1 Err:511 1.79 m beff. 2 Err:511 3.293
beff. For design Err:511 3.746 m beff. For design Err:511 5.253
length of dispersion Err:511 0.888 m dispersion leng. Err:511 1.513
IF Err:511 1.250 IF Err:511 1.25
Load intensity Err:511 7.516 t/sqm Load intensity Err:511 3.1456

effective from 0 to 0.888 effective from 0.595 to 2.108


m
m
m
m
m
m
m

m
m
m
m

t/sqm

m
m
m
m

t/sqm
Project HIGHWAY PROJECTS IN INDIA (4 laning of Hubli-Hospet section of Nh-63)
Subject Design of Box type Structure With PQC of 300 m above box top

Configuration of Box
loading on deck clear span (a) 5.000
VC (b) 2.700
top slab thick 0.450
bottom slab th 0.450
side wall th 0.450
loading on bottom slab eff. Span 5.450
width of deck 12.00
ll sur p epr epr ll sur pr b/lo 2.2018
k 2.600

Step-1 Estimation of Loading on Top slab Applicable for Cast in situ construction

Applicable for edge panel of 1 m (i.e near crash barrier or kerb + parapet zone)
Due to crash barrier Err:511 1.08 t/sqm effective from end to 1.015 m
Due to wearing coat (PQC =300 mm ) 0.75 t/sqm effective for c/w width
Due to live load on c/w

C-1 Class 70 T vehicle with minimum clearance from kerb/crash barrier


beff = kx(1-x/lo)+bw Err:511 4.99 m
Beff for design Err:511 6.67 m
length of dispersion Err:511 5.45 tm
Impact factor Err:511 1.25
Load intensity Err:511 2.41 t/sqm

C-2 Class 70 bogie vehicle with minimum clearance from kerb/crash barrier
x1 Err:511 2.725 m x2 Err:511 1.505
beff 1 Err:511 5.00 m beff. 2 Err:511 4.292
beff. For design Err:511 6.561 m beff. For design Err:511 6.206
length of dispersion Err:511 1.763 m dispersion leng. Err:511 1.763
IF Err:511 1.250 IF Err:511 1.250
Load intensity Err:511 2.161 t/sqm Load intensity Err:511 2.2849

effective from 1.8435 to 3.607 effective from 0.6235 to 2.387

C-2 Class 70 bogie vehicle with minimum clearance from kerb/crash barrier
x1 Err:511 0.132 m x2 Err:511 1.352
beff 1 Err:511 1.79 m beff. 2 Err:511 4.103
beff. For design Err:511 3.754 m beff. For design Err:511 6.063
length of dispersion Err:511 1.013 m dispersion leng. Err:511 1.763
IF Err:511 1.250 IF Err:511 1.25
Load intensity Err:511 6.575 t/sqm Load intensity Err:511 2.339

effective from 0 to 1.013 effective from 0.47 to 2.233


m
m
m
m
m
m
m

m
m
m
m

t/sqm

m
m
m
m

t/sqm
Project HIGHWAY PROJECTS IN INDIA (4 laning of Hubli-Hospet section of Nh-63)
Subject Design of Box type Structure With PQC of 300 m above box top

Configuration of Box
loading on deck clear span (a) 4.000
VC (b) 1.700
top slab thick 0.400
bottom slab th 0.400
side wall th 0.400
loading on bottom slab eff. Span 4.400
width of deck 12.00
ll sur p epr epr ll sur pr b/lo 2.7273
k 2.600

Step-1 Estimation of Loading on Top slab Applicable for Cast in situ construction

Applicable for edge panel of 1 m (i.e near crash barrier or kerb + parapet zone)
Due to crash barrier Err:511 1.14 t/sqm effective from end to 0.965 m
Due to wearing coat (PQC =300 mm ) 0.75 t/sqm effective for c/w width
Due to live load on c/w

C-1 Class 70 T vehicle with minimum clearance from kerb/crash barrier


beff = kx(1-x/lo)+bw Err:511 4.31 m
Beff for design Err:511 6.33 m
length of dispersion Err:511 4.40 tm
Impact factor Err:511 1.25
Load intensity Err:511 3.02 t/sqm

C-2 Class 70 bogie vehicle with minimum clearance from kerb/crash barrier
x1 Err:511 2.200 m x2 Err:511 0.980
beff 1 Err:511 4.32 m beff. 2 Err:511 3.440
beff. For design Err:511 6.220 m beff. For design Err:511 5.400
length of dispersion Err:511 1.663 m dispersion leng. Err:511 1.663
IF Err:511 1.250 IF Err:511 1.250
Load intensity Err:511 2.417 t/sqm Load intensity Err:511 2.7836

effective from 1.3685 to 3.032 effective from 0.1485 to 1.812

C-2 Class 70 bogie vehicle with minimum clearance from kerb/crash barrier
x1 Err:511 0.132 m x2 Err:511 1.352
beff 1 Err:511 1.79 m beff. 2 Err:511 3.895
beff. For design Err:511 3.752 m beff. For design Err:511 5.855
length of dispersion Err:511 0.963 m dispersion leng. Err:511 1.663
IF Err:511 1.250 IF Err:511 1.25
Load intensity Err:511 6.920 t/sqm Load intensity Err:511 2.568

effective from 0 to 0.963 effective from 0.52 to 2.183


m
m
m
m
m
m
m

m
m
m
m

t/sqm

m
m
m
m

t/sqm
Project HIGHWAY PROJECTS IN INDIA (4 laning of Hubli-Hospet section of Nh-63)
Subject Design of Box type Structure Precast box culvert 2.5x3

Configuration of Box precast box (2 m wide standard)


loading on deck clear span (a) 3.500
VC (b) 4.000
top slab thick 0.400
bottom slab th 0.475
side wall th 0.425
loading on bottom slab eff. Span 3.925
width of deck 1.00
ll sur p epr epr ll sur pr b/lo 0.2548
k 0.997

Step-1 Estimation of Loading on Top slab (for 2 m wide precast Box)

Due to wearing coat (Mid =100 mm & END=75mm 0.200 t/sqm effective for c/w width
avg 0.0875
Due to live load on c/w

C-1 Class 70 T vehicle one wheel on edge of the Precast box


beff = kx(1-x/lo)+bw Err:511 2.00 m
Beff for design Err:511 1.00 m
length of dispersion Err:511 3.93 tm
Impact factor Err:511 1.25
Load intensity Err:511 9.57 t/sqm

C-2 Class 70 bogie vehicle with one wheel on edge of the precast box
x1 Err:511 1.963 m
beff 1 Err:511 2.01 m
beff. For design Err:511 1.000 m
length of dispersion Err:511 1.238 m
IF Err:511 1.250
Load intensity Err:511 10.097 t/sqm

effective from 1.3435 to 2.582

C-2 Class 70 bogie vehicle with one wheel on edge of the precast box
x1 Err:511 0.132 m x2 Err:511 1.352
beff 1 Err:511 1.16 m beff. 2 Err:511 1.918
beff. For design Err:511 1.000 m beff. For design Err:511 1.000
length of dispersion Err:511 0.751 m dispersion leng. Err:511 1.238
IF Err:511 1.250 IF Err:511 1.25
Load intensity Err:511 16.656 t/sqm Load intensity Err:511 10.097

effective from 0 to 0.751 effective from 0.733 to 1.971

12.687 t/sqm
ulvert 2.5x3

m
m
m
m
m
m
m

m
m
m
m

t/sqm
Project HIGHWAY PROJECTS IN INDIA (4 laning of Hubli-Hospet section of Nh-63)
Subject Design of Box type Structure Precast box culvert 2.5x3

Configuration of Box precast box (2 m wide standard)


loading on deck clear span (a) 3.000
VC (b) 3.000
top slab thick 0.350
bottom slab th 0.425
side wall th 0.375
loading on bottom slab eff. Span 3.375
width of deck 1.00
ll sur p epr epr ll sur pr b/lo 0.2963
k 1.147

Step-1 Estimation of Loading on Top slab (for 2 m wide precast Box)

Due to wearing coat (Mid =100 mm & END=75mm 0.200 t/sqm effective for c/w width
avg 0.0875
Due to live load on c/w

C-1 Class 70 T vehicle one wheel on edge of the Precast box


beff = kx(1-x/lo)+bw Err:511 1.99 m
Beff for design Err:511 1.00 m
length of dispersion Err:511 3.38 tm
Impact factor Err:511 1.25
Load intensity Err:511 9.57 t/sqm

C-2 Class 70 bogie vehicle with one wheel on edge of the precast box
x1 Err:511 1.688 m
beff 1 Err:511 2.00 m
beff. For design Err:511 1.000 m
length of dispersion Err:511 1.138 m
IF Err:511 1.250
Load intensity Err:511 10.984 t/sqm

effective from 1.1185 to 2.257

C-2 Class 70 bogie vehicle with one wheel on edge of the precast box
x1 Err:511 0.132 m x2 Err:511 1.352
beff 1 Err:511 1.18 m beff. 2 Err:511 1.964
beff. For design Err:511 1.000 m beff. For design Err:511 1.000
length of dispersion Err:511 0.701 m dispersion leng. Err:511 1.138
IF Err:511 1.250 IF Err:511 1.25
Load intensity Err:511 17.844 t/sqm Load intensity Err:511 10.984

effective from 0 to 0.701 effective from 0.783 to 1.921


ulvert 2.5x3

m
m
m
m
m
m
m

m
m
m
m

t/sqm
Project HIGHWAY PROJECTS IN INDIA (4 laning of Hubli-Hospet section of Nh-63)
Subject Design of Box type Structure Precast box culvert 2.5x3

Configuration of Box precast box (2 m wide standard)


loading on deck clear span (a) 2.500
VC (b) 3.000
top slab thick 0.300
bottom slab th 0.400
side wall th 0.350
loading on bottom slab eff. Span 2.850
width of deck 1.00
ll sur p epr epr ll sur pr b/lo 0.3509
k 1.286

Step-1 Estimation of Loading on Top slab (for 2 m wide precast Box)

Due to wearing coat (Mid =100 mm & END=75mm 0.200 t/sqm effective for c/w width
avg 0.0875
Due to live load on c/w

C-1 Class 70 T vehicle one wheel on edge of the Precast box


beff = kx(1-x/lo)+bw Err:511 1.94 m
Beff for design Err:511 1.00 m
length of dispersion Err:511 2.85 tm
Impact factor Err:511 1.25
Load intensity Err:511 9.57 t/sqm

C-2 Class 70 bogie vehicle with one wheel on edge of the precast box
x1 Err:511 1.425 m
beff 1 Err:511 1.95 m
beff. For design Err:511 1.000 m
length of dispersion Err:511 1.038 m
IF Err:511 1.250
Load intensity Err:511 12.042 t/sqm

effective from 0.906 to 1.944

C-2 Class 70 bogie vehicle with one wheel on edge of the precast box
x1 Err:511 0.132 m x2 Err:511 1.352
beff 1 Err:511 1.20 m beff. 2 Err:511 1.949
beff. For design Err:511 1.000 m beff. For design Err:511 1.000
length of dispersion Err:511 0.651 m dispersion leng. Err:511 1.038
IF Err:511 1.250 IF Err:511 1.25
Load intensity Err:511 19.216 t/sqm Load intensity Err:511 12.042

effective from 0 to 0.651 effective from 0.833 to 1.871


ulvert 2.5x3

m
m
m
m
m
m
m

m
m
m
m

t/sqm