1 Spray truck 1 8 13
2 Roller 1 8 14
3 Chip spreader truck 2 8 15
4 Grader 1 8 16
5 Service truck 1 8 17
6 18
7 19
8 20
9 21
10 22
2 Damaged asphalt surface of 35m length with full lane width was excavated and
levelled.
3 Crushed aggregates were spreaded by a chip spreader for a road section of 50m3 100
Length 400m and width 7.5m.
STATUS OF APPROVAL
RF no. Location of work Activity Remark
From To At
1
2
3
ACCIDENT RECORD VISITORS ON SITE
1. No Accident occurred during the reporting date 1.
2. 2.
COMMENTS OR REMARKS ON SITE ACTIVITIES/ SPECIAL PROBLEMS / ATTENTION
Page 1 of 1 /conversion/tmp/activity_task_scratch/698893794.docx