Zuoquan Power plant Accident cement plate form in the middle of the ash silo ( with a vertical drop of

Outsourced person responsible for cleaning and sanitation was approximately 6.4 m )
performing cleaning on 2nd floor of T2 transfer station. Upon receiving the report , project manager Mr. Zhu arrived at the
He violated safety regulation by crossing the lifting port guard rail scene at 11:42 AM. He along with Mr. Sun and the driver, managed to
causing him to fall a height of 6.8m. 63 years old man suffered from remove Mr. Lin from the platform location at 11:50AM .the project
internal injuries and was declared dead. manager failed to promptly the incident to the power plant. Instead he
Direct Causes: used his own vehicle to transport Mr. Lin to the Yangluo Branch Of
Crossing of guard rail was safety violation and Minor collapse of lifting Zhongshan Hospital in hubei province for the emergency treatment.
port guardrail led to his fall and death Sadly, on march 19,2023 at 10:03 AM , Mr. Lin passed away despite the
Indirect Causes: efforts made to save him.
1) Inadequate hazard inspection: Company previously performed Direct causes:
hazardous inspection but missed blind spots 1) steel structural platform had corroded
2) inadequate safety training: 2) indicating insufficient strength
Personnel did not receive proper safety education 3) Mr. Lin had weak awareness of safety
Fuzhou power plant 4) inadequate understanding of the danger associated
Accident: unauthorized entry in ESP by outsourced personal fell into the Indirect causes:
hopper and died. There was no work ticket and safety measures, no 1) inadequate risk identification
supervisor for confined space. 2) hidden danger of rust and even breakage in several areas
Direct causes: 3) some stairs and platform railings lacked kickboards.
*Less awareness of safety 4) plant did not take temporary preventive measures.
*Unauthorized entry in confined space 5) weak work organization, personal entered the work without work
*Less knowledge to use safety belt permit
*Safety control by company was not implemented 6) in charge of the work was not present at the work site.
*Unaware of risk identification, safety awareness and control Prevention measures:
capabilities 1) organize safety learning sessions
Problem exposed and precautions 2) enforcement of the two permit system
*Loopholes in management 3) in this lesson to strengthen safety awareness for departmental staff
*Not implemented safety standards given by company 4) immediately rectify safety hazards such as corroded platforms
*Didn't use 2 tickets 5) implement temporary preventive measures.
Yimin power plant 6) installed physical barriers and provided clear warning signs
Grounding wire not properly installed 7) organize inspection for the corrosion status platforms, including steel
Han removed wire without knowledge of induction and method of structures.
removing grounding wire Power Plant name : Huaneng Huajialing Wind Yard
Direct cause Accident Process: There was a task of measurement of dimensions &
Han touched grounding terminal of grounding wire the Yimin fengtun installation verification of “Inverter control transformer” in #21 Wind
line B got induced current through line A which is on same tower at turbine yard.
some point and han died. Two persons,Mr. Zhang and Shang(who were responsible for the annual
Indirect causes maintenance of #21 wind turbine) took all the safety measures of
No PPEs used Transformer isolation, opened all the breakers and confirmed the
No knowledge of operation of grounding wire absence of voltage at the front door of inverter grid cabinet. As they
Unqualified grounding wire came out of the yard, they heard an explosion, upon returning they
Single point grounding found out that Mr. Chen died.
Zhengning Power Plant of Gansu Company Direct Causes: 1- Inverter main Circuit Breaker still had voltage even
Accident: though the breaker was opened.
Excavation work for waste water pipeline, failure to follow company 2- Internal inspection of control cabinet had blind spots and
guidelines on more than 3m of excavation depth, sides of trench energisation was not identified. The reluctance of low voltage side was
collapsed, person buried under soil. not investigated.
Direct Causes: 3- The inverter was at a height of 1.7m , hydraulic station was 40 cm in
• Excavation project was not included in the management of hazardous height and there was unstable stable standing position to inspect
sub projects inverter transformer
• Inadequate identification of risks Exposed Problems:
1- Employees entered the tower base without obtaining work permits
• Supervision of operations not in place
and with inadequate on-site safety supervision.
• Insufficient safety measures
2- Inadequate Management of Outside Suppliers: Outside personnel
Indirect Causes:
were allowed on site with just a phone call contact and he was not
• Insufficient on-site daily safety Supervision management
accompanied by maintenance personnel of wind turbine
• Incapable safety supervisors 3- Incomplete Hazard Inspection: There were blind spots in the internal
• Insufficient implementation of two ticket systems inspection of inverter control cabinet and live parts were not thoroughly
• Insufficient safety training of workers investigated.
Death accident in Yangluo Power Plant Preventive measures:
Accident process: 1- Organize Safety Learning from Accident: Strength employees safety
On march 18, 2023 at 08:05 AM, two members of the work team Mr. Lin awareness, enhance management of “two permits”
and Mr. Sun, entered the construction site without notice to the power 2- Enhance outdoor management: Prohibit external personnel from
plant maintenance department. This occurred despite the power plant entering the maintenance site alone. External personnel can work under
requirement to suspend work on rainy days which was the case on the supervision & guardianship of power plant personnel
March 17.they engaged in rust removal work on the separator of the 3- 3- Enhance Hazard Identification: Provide additional safety awareness
4-3 fly ash silo in phase III of the power plant. training to improve on-site operational risk identification
At 11:25 AM, Mr Lin voluntarily removed his safety protections 4- Strengthen Hazard Inspection & Control: Conduct comprehensive
( including on safety harness) and jumped from the work pipe. inspection of low voltage switches and potential reluctance issues.
Unfortunately the plate form patterned steel plate ruptured and
perforated ( 800mm × 580m ) as a result Mr. Lin fell down to the