Juan L Subrastas
Juan L Subrastas
A1.1(8) Construction of Field Office for the Engineer (Rental Basis) Mo. 2.00 4,701.57 9,403.14
Total in words:
Two Hundred Ninety Four Thousand Seven Hundred Seventy One Pesos and 9/100 Only
Prepared by:
ENGR. FERNANDO D. GALAROZA Date: September 20, 2022
President
REYROSE CONST. & SUPPLY DEV'T. CORP.
Name of Bidder
Republic of the Philippines
Department of Public Works and Highways
AGUSAN DEL NORTE
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
J.ROSALES AVENUE, BUTUAN CITY
Contract Name :
Construction/Rehabilitation of Water Supply/Septage and Sewerage/Rainwater Collector System, Juan L. Subrastas
Elementary School, Jabonga, Agusan del Norte
Location of the Contract : Agusan del Norte
BILL OF QUANTITIES
Part No. Part Description
Item Description Unit Quantity Unit Price Amount
No. (Pesos) (Pesos)
(1) (2) (3) (4) (5) (6)
PART I FACILITIES FOR THE ENGINEER
Construction of Field
Four Thousand Seven Hundred One Nine Thousand Four Hundred Three Pesos
A1.1(8) Office for the Engineer Mo. 2.00
Pesos and 57/100 Only and 14/100 Only
(Rental Basis)
Project Billboard/ Three Thousand Six Hundred Eighty Seven Thousand Three Hundred Sixty Three
B.5 Each 2.00
Signboard One Pesos and 93/100 Only Pesos and 86/100 Only
Occupational Safety Fifteen Thousand Fifty Seven Pesos Fifteen Thousand Fifty Seven Pesos and
B.7 (2) L.S. 1.00
and Health Program and 54/100 Only 54/100 Only
Mobilization / Two Thousand Two Hundred One Two Thousand Two Hundred One Pesos and
B.9 L.S 1.00
Demobilization Pesos and 59/100 Only 59/100 Only
PART A. EARTHWORKS
Structure Excavation Two Hundred Sixty Six Pesos and Eight Hundred Eighty Seven Pesos and
803(1)a Cu.m. 3.33
(Common Soil) 41/100 Only 15/100 Only
Embankment from Two Hundred Seventy Two Pesos Eight Hundred Twenty Eight Pesos and
804(1)a Cu.m. 3.04
Structure Excavation and 69/100 Only 98/100 Only
One Thousand Nine Hundred Sixty One Thousand Twenty One Pesos and
804(4) Gravel Fill Cu.m. 0.52
Three Pesos and 77/100 Only 16/100 Only
In Words (Pesos)
Structural Concrete
Seven Thousand Five Hundred Fifty Five Thousand Eight Hundred Twenty
900(1)c2 (Footings and Slab on Cu.m. 0.77
Nine Pesos and 13/100 Only Pesos and 53/100 Only
Fill)
Structural Concrete Eight Thousand Three Hundred Fifty One Thousand Six Hundred Seventy Pesos
900(1)c4 Cu.m. 0.2
(Columns) Three Pesos and 75/100 Only and 75/100 Only
Reinforcing Steel One Hundred Forty Six Pesos and Sixteen Thousand Two Hundred Ninety
902(1)a kg. 111
(Deformed, Grade 40) 84/100 Only Nine Pesos and 24/100 Only
Formworks and Four Thousand Eight Hundred Thirty Four Thousand Eight Hundred Thirty Pesos
903(1) L.S. 1
Falseworks Pesos and 70/100 Only and 70/100 Only
In Words (Pesos)
Four Hundred Nine Pesos and Three Thousand Four Hundred Sixty Pesos
1032(1)c Painting Works (Steel) Sq.m. 8.45
55/100 Only and 70/100 Only
In Words (Pesos)
One Hundred Fifty One Thousand One Hundred Fifty One Thousand One
1002(27) Plumbing Works L.S. 1
One Pesos and 65/100 Only Pesos and 65/100 Only
Two Hundred Ninety Four Thousand Seven Hundred Seventy One Pesos and 9/100 Only
Prepared by:
PART A. EARTHWORKS
803(1)a Structure Excavation (Common Soil) 887.15
804(1)a Embankment from Structure Excavation 828.98
804(4) Gravel Fill 1,021.16
PART B PLAIN AND REINFORCED CONCRETE WORKS
900(1)c2 Structural Concrete (Footings and Slab on Fill) 5,820.53
900(1)c4 Structural Concrete (Columns) 1,670.75
902(1)a Reinforcing Steel (Deformed, Grade 40) 16,299.24
903(1) Formworks and Falseworks 4,830.70
PART C FINISHING AND OTHER CIVIL WORKS
Two Hundred Ninety Four Thousand Seven Hundred Seventy One Pesos and 9/100 Only
Submitted by:
DPWH-INFR-19-2016 1 of 1
SUMMARY OF COST ESTIMATES
Contract ID : 22ND0038 (Cluster)
I. LABOR RATE
Foreman @ 600.00 / day
Skilled @ 450.00 / day
Labor @ 328.00 / day
Prepared by:
ENGR. FERNANDO D. GALAROZA
President
DETAILED ESTIMATES
Contract ID : 22ND0038 (Cluster)
B. MATERIAL COST
C. MATERIAL COST
4x8 Tarpaulin unit 2.00 1,600.00 3,200.00
2x2x8 Lumber or 10 pcs bdft 26.67 35.00 933.45
Nails kgs 0.50 68.00 34.00
Php 4,167.45
C. MATERIAL COST
First Aid Kit L.s 1 1,000.00 1,000.00
Safety Shoes pcs 5 500.00 2,500.00
Safety Helmet pcs 5 350.00 1,750.00
Safety Gloves pcs 5 192.00 960.00
Saftey Vest pcs 5 80.00 400.00
PPE Signages (4'x8') set 1 1,150.00 1,150.00
Safety First (4'x4') set 2 250.00 500.00
Warning Signs (2'x3') set 5 160.00 800.00
Caution Tape, 100 ft. roll 2 350.00 700.00
Php 9,760.00
C. MATERIAL COST
Mobilization / Demobilization L.S 1.00 500.00 500.00
Php 500.00
No. of
Name and Capacity No. of Units Hourly Rate Amount
Hours
B. EQUIPMENT
Backhoe 1 0.05 12,296.00 614.80
Php 614.80
C. MATERIAL COST
No. of
Name and Capacity No. of Units Daily Rate Amount
Hours
B. EQUIPMENT
Backhoe 1.00 0.05 12,296.00 614.80
Php 614.80
C. MATERIAL COST
No. of
Name and Capacity No. of Units Daily Rate Amount
Hours
B. EQUIPMENT
Backhoe 1.00 0.02 12,296.00 245.92
Php 245.92
C. MATERIAL COST
Gravel Fill Cu.m. 0.55 1,000.00 550.00
Php 550.00
Name and
No. of Units No. of Days Daily Rate Amount
Capacity
B. EQUIPMENT
Single Bagger 1.00 0.30 2,000.00 600.00
Concrete Vibrator 1.00 0.30 1,000.00 300.00
Fuel (Gasoline/Diesel) 100.00
Php 1,000.00
C. MATERIAL COST
Portland Cement Bags 6.93 290.00 2,009.70
Screened Sand cu.m. 0.39 900.00 351.00
3/4" Gravel cu.m. 0.77 1,000.00 770.00
Php 3,130.70
Name and
No. of Units No. of Days Daily Rate Amount
Capacity
B. EQUIPMENT
Single Bagger 1.00 0.10 2,000.00 200.00
Concrete Vibrator 1.00 0.10 1,000.00 100.00
Fuel (Gasoline/Diesel) 50.00
Php 350.00
C. MATERIAL COST
Portland Cement Bags 1.80 290.00 522.00
Screened Sand cu.m. 0.10 900.00 90.00
3/4" Gravel cu.m. 0.20 1,000.00 200.00
Php 812.00
Name and Capacity No. of Units No. of Days Daily Rate Amount
B. EQUIPMENT
Bar cutter 1.00 1.05 1,758.00 1,845.90
Bar Bender 1.00 1.05 2,812.00 2,952.60
Php 4,798.50
C. MATERIAL COST
Reinforcing Steel Bar G-40 kg 116.55 55.00 6,410.25
Php 6,410.25
No. of
Name and Capacity No. of Units Daily Rate Amount
Days
B. EQUIPMENT
C. MATERIAL COST
Formworks and Falseworks L.S. 1.00 3,000.00 3,000.00
Php 3,000.00
No. of
Name and Capacity No. of Units Daily Rate Amount
Days
B. EQUIPMENT
C. MATERIAL COST
Latex, Semi Gloss gals 1.00 650.00 650.00
Epoxy Primer gal 0.85 1,200.00 1,020.00
Paint Reducer liter 1.00 75.00 75.00
Consumables 87.25
Php 1,832.25
No. of
Name and Capacity No. of Units Daily Rate Amount
Days
B. EQUIPMENT
Welding Machine 1.00 4.00 3,128.00 12,512.00
Php 12,512.00
C. MATERIAL COST
Structural Steel L.S. 1.00 36,000.00 36,000.00
Php 36,000.00
No. of
Name and Capacity No. of Units Daily Rate Amount
Days
B. EQUIPMENT
C. MATERIAL COST
Plumbing Works L.S. 1.00 100,850.00 100,850.00
Php 100,850.00