Hazard Identification Risk Assessment Control (HIRARC)

Company: Adamson Construction Corp. Conducted by: Kristine Florante (Supervisor)


Location: 110 Doña soledad avenue, Barangay Don Bosco, Voltaire Sangalang &
Parañaque city Date: Nikolai Tungpalan (Plasterer)

October 26, 2023


Approved by: Paolo Miguel Beriso (Site Manager) Safety Officer: Kenneth Soriano
Date October 26, 2023

Hazard Identification Risk Analysis Risk Control


No. Work Hazard Work can Existing Risk Severity Risk Recommended Control Measures PIC (Due
Activity cause/effect (if any) (1-5) (Likelihood Date/Statu
x Severity) s)
(Medium)
1 Erect Unguarded Head injury / Fatal Safety helmet, 5 4 x 5 = 20 1.) Fence upper floor exposed edges 1.) 28 Sept.
2023,
working floor house keeping (High) completed
platform 2.) 30 Sept.
2.) Establish Safe Work Procedure 2023,
completed
2 Loading Uneven Fall of person / Housekeeping, 4 4 x 3 = 12 Put plank on floor, anti-slip mat 1.) 26 Sept.
Concrete floor Broken leg Safety shoes (Medium) 2023,
completed
onto Platform 2.) 26 Sept.
Heavy Load Muscular strain / Manual lifting 1 1x3=3 Use small container 2023,
Back pain procedure (Low) completed
3 Plastering Defective Fall from height / Safety belt 5 4 x 5 = 20 1.) Install handrail 1.) 26 Sept.
platform Fatal (High) 2.) Use new plank as platform 2023,
completed
2.) 26 Sept.
Hot weather Dehydrate Mineral water 1 3x1=3 Provide drinking facilities 2023,
supplty (Low) complete