You are on page 1of 3

Republic of the Philippines

B A T A N G A S S T A T E U N I V E R S I T Y BALAYAN
Caloocan, Balayan, Batangas

ON-THE-JOB TRAINING
TECHNICAL NARRATIVE REPORT
Month/Year: August/ 2021
Webinar No. 1
Title of Webinar : 2021 MIMAROPA WEBINAR SPECIAL
Date : August 28, 2021
Time/No. of Hours : 7 am- 5 pm/ 10 Hours
Online Platform : Zoom
Sponsoring Agency : Institute of Integrated Electrical Engineers of the Philippines
Participants : Students, Practitioners, Reviewees
Webinar link : 991 3395 9384/ 373786

PHOTO OF INVITATION /E-TARP (Photo)

SHORT NARRATIVE (Minimum of Five hundred (500) words.) Must focus on the acquired
knowledge or skill in the webinar attended. Must also include the name of the speaker and his/her
position company affiliation and the highlight s of his/her talk. Also, try to answer the following
questions below.

1. Is it connected to my field of specialization?


2. Was it helpful for me as a student in the field of my specialization?

NARRATIVE REPORT

To begin with, the first webinar topic presentation presented is the Power Capacity
Evaluation and Augmentation Technique for Wind and Solar; this section of the talk only focuses
on ways for how wind and solar energy may be used over time. Augmentation is described as the
act of lengthening and expanding anything; also, wind and solar power are considered renewable
sources of energy. Renewable energy, by definition, is energy that can be recovered and is
necessary for the planet's sustainability.
Furthermore, the next topic that is being presented concerns Fire Pump Power Supplies:
Code and Intent. The topic primarily focuses on giving particular code requirements for fire pumps
as well as their aim. The goal of these code standards is to ensure safety and to keep people's lives
safe. Various code standards must be met when designing the power supply for a facility fire pump.
NFPA 20: Standard for the Installation of Stationary Pumps for Fire Protection Chapter 9 and
NFPA 70: National Electric Code (NEC) Article 695 are the two primary code sections for
powering fire pumps. Although there is considerable overlap between the two codes, the scopes of
the two articles differ, as they both mention right upfront. Article 695 specifies the criteria for
electrical installations.
In addition, Building Engineering Facility Management is the third subject of
discussion, this area of discussion briefly discusses what facility management's role is inside an
engineering building. According to the debate, facility management is primarily concerned with the
administration of various facilities that are part of a constructed environment. It is carried out in a
planned and regular manner. It meets day-to-day operational objectives to keep the environment
safe and efficient. Its primary goal is to provide a safe and seamless flow within the management.
Finally, Diesel Power Plant Design, Operation, and Maintenance for Island Electrification.
This issue is primarily concerned with the concept of performing maintenance and operation with
diesel power plants for island electricity. Proper maintenance of power plants to prevent accidents
and malfunctions during operation; the topic's goal is to guarantee that power plants can work at
their peak to deliver exceptional performance for customers. Furthermore, the topic depicted
several types of diesel power plants and their locations.

Therefore, I conclude, the majority of the presenters are qualified and professional electrical
engineers, all of the subjects are susceptible to interference. As expected, before attending
numerous webinars, we must always take into consideration the respect and right etiquette in
attending and participating in this sort of activity to guarantee the smooth flow of the presentation
and a productive webinar. First and foremost, because we had limited time to examine all of the
issues, significant information such as definitions, characteristics, and kinds are highlighted in the
topics.

CERTIFICATE OF ATTENDANCE (Photo)


PROBLEMS MET (Discuss problems met before and during the webinar)

 Unstable Internet Connection


 Noise
 Time

ACTIONS TAKEN. (Actions made to solve the problems encountered)

 Since that the discussion took too much longer, the organization provided handouts and
recorded videos of the discussion for the participants to be able to view the discussion
anytime.

Prepared by:

ARTHEMUS S. PEDRAZA
BIT-ELT 4A
College of Industrial Technology, Electrical Technology

On-the-Job Training Office


GPB Main 1, Rizal Avenue, Batangas City 4200
Telefax No.: (043) 980-0385 loc. 105 / 1147

You might also like