The document outlines 20 proposed civil works projects for an organization, providing descriptions of each work and noting their current status. Many projects are pending due to estimates and materials being prepared or awaited. Some projects like canteen and forest area fencing renovations are in progress. The civil works include renovations of labs, workshops, buildings, gates, walls, drains and other infrastructure facilities.
The document outlines 20 proposed civil works projects for an organization, providing descriptions of each work and noting their current status. Many projects are pending due to estimates and materials being prepared or awaited. Some projects like canteen and forest area fencing renovations are in progress. The civil works include renovations of labs, workshops, buildings, gates, walls, drains and other infrastructure facilities.
The document outlines 20 proposed civil works projects for an organization, providing descriptions of each work and noting their current status. Many projects are pending due to estimates and materials being prepared or awaited. Some projects like canteen and forest area fencing renovations are in progress. The civil works include renovations of labs, workshops, buildings, gates, walls, drains and other infrastructure facilities.
1 Sample preparation lab renovation Pending Estimate preparing 2 Canteen renovation In progress 3 Workshop renovation Pending Material awaited 4 Old workshop renovation for security residence Pending Material awaited Extension of office building from survey room to 5 Pending Drawing preparing account hall 6 Saparate toilet for conference room & VIP room Pending Drawing preparing 7 Required shed behind canteen Roof covering (sheeting work) for office area 8 Pending Estimate preparing building 9 Weigh bridge renovation work Pending Drawing & Estimate preparing 10 Proper drain system near weigh bridge. 11 Gate no.3 repair Height of boundary wall to be increases from gate 12 Pending Material awaited no.2 to barrier no.2 13 Forest area barbed wire fencing In progress 14 Pitching of settling tank 15 5T & 14T magazine renovation In progress 16 MS gate fixing between boundaary wall for former Pending Estimate preparing 17 Camp Repair work In progress by Rathi brothers Bottom gap of precast boundary wall to be filled by 18 In progress soil Height of precast boundary wall to be increases by 19 barbed wire fencing behind weigh bridge no.1 pending village side. 20 Precast boundary wall at panchvati In progress