AMA-CN-FRM-0020
Policy Construction Revision 00
The Contractor certifies that this submittal has been verified and coordinated by all related disciplines and related disciplines
and relevant subcontractors.
Contractor Certification
Engineer’s - Comments
Comments:
7/02/23
Name Signature Date
Status Code
Contractor Acknowledgement
Name Signature Date
Page 1 of 1
Comments :
consultant. If vibration transfer to slab it shall be verified accordingly. CONCRETE PLINTH SIZE
(5450 x 4200 x 100)
CT-1.4
CT-2.1
2.88
2.88
1.22
1.22
370
430
1,515
1,575
What is this lines Stamp Signature
CONTRACTOR :
NOTE:
1). DELIVERY WEIGHT LOADINGS NOTED SHOULD BE EXPECTED TO BE USED ON ALL
ANIMAL RESCUE INDOOR CORAL RACEWAY OUTDOOR CORAL RACEWAY HASAN AL-HARBI COP.
DIBA
DELIVERY PATHS. DELIVERY PATHS & REQUIRED OPENINGS TO BE CONFIRMED BY
CONTRACTOR & CO-ORDINATED WITH THE PROJECT TEAM
(I.D 1400 x 1000) TANK (I.D 2400 x 1200 x 500) TANK (I.D 2400 x 1200 x 500) P.O. Box 109, DIB 71911
UP Phone No:- 966 14 432 0555
2). CRANE LOCATIONS AND DELIVERY METHODS WITH ASSOCIATED LOADINGS STILL TO BE 1.370m3 x 3 1.144m3 x 4 1.144m3 x 4 Fax No:- 966 14 432 0044
CONFIRMED BY PROJECT TEAM Compressor Room, Seated on blinding Stamp Signature
3). ALL LSS EQUIPMENT REQUIRED 100MM CONCRETE PLINTH FROM FFL UNLESS NOTIFIED
OTHERWISE.
Dive Gear & Cylinder concrete ? or what
4). THE REQUIRED ACCESS FOR LSS EQUIPMENT IS 3m(w) x 3m (ht). (MINIMUM Storage EXH CT-2.1 EXH CT-2.2 EXH CT-1.1 clarify.
OPENING). 1.220 m³
EXH AR-3.1 1.220 m³ 1.220 m³
8.5m2 1.390 m³ Sheet Status
Key Plan
Site Location
Makkah
EXH CT-1.2
EXH AR-3.2 1.220 m³
1.390 m³ N
8.5m2
Office Space
8.5m2
EXH CT-1.4
1.220 m³ C0 Issue For Approval 04/02/2023
Rev. Reason For Issue Date
Project
Building Name
SHEET :
PROJECTED FLOOR LOADING
Drawing Title