You are on page 1of 1

STANDARD OPERATING PROCEDURE

PROCESS : TITTLE : Doc. No : XXX-SOP-C2.2-2017


C2 C 2.2 Issued Date : 01 April 2017
PERENCANAAN Rev. : 02
PERENCANAAN DAN PENGENDALIAN MATERIAL
PRODUKSI Page : 2 of 4

FLOW CHART NO DOCUMENT PIC

1 SPK Marketing.Dept.
(XXX-F-C1.1-2014-03/REV.00)
SO ( Sales Order )
(XXX-F-C1.1-2014-02/REV.00)

2 MPC

3 Schedule perencanaan assy PPC


produksi.
(XXX-F-C2.1-2014-01/Rev.03)
Perhitungan bahan baku MPC
produksi.
(XXX-F-C2.2-2014-01/Rev.01)
Laporan Stock Gudang

4 MPC

5 PR MPC
(XXX-F-S5.2-2014-01/Rev.00) Purchasing Dept.

6 MPC
Produksi Dept.

7 Drawing Engineering Dept


(XXX-F-S1.1-2014-03/Rev.00)

8 Head PPIC

9 Permohonan Pembuatan/ MPC


Revise Bill Of Material Head PPIC
(XXX-F-C2.2-2014-02/REV.01)
Permintaan Item Code
(XXX-F-C2.2-2014-03/REV.01)

You might also like