Development of Hari Nagar Colony at New Delhi for DTC on Design, Engineering, Procurement &

Construction (EPC)

“Scope of Work”

NBCC (INDIA) LIMITED

Development of Residential Colony for DTC at Hari Nagar, New


Delhi – SH: Construction of Residential Towers, EWS Quarters,
Club Building and Allied Infrastructure on Design, Engineering,
Procurement and Construction (EPC) Basis including Operation &
Maintenance

SCOPE OF WORK
(VOL. II A)

NBCC (INDIA) LTD.


NBCC BHAWAN
LODHI ROAD
NEW DELHI – 110003
Website:www.nbccindia.com

Digitally signed by ANUJ


NAVNEET CHACHA
Date: 2023.04.11 16:20:50 IST
Development of Hari Nagar Colony at New Delhi for DTC on Design, Engineering, Procurement &
Construction (EPC)

“Scope of Work”

SCOPE OF WORK

1.0 BRIEF SCOPE

NBCC (India) Ltd. has been entrusted with the Development of Residential Colony at
Hari Nagar, New Delhi into Residential Group Housing on behalf of the Delhi Transport
Corporation, New Delhi.

The development of the group housing has been planned in a single phase.

The tender has been invited for construction of 396 numbers of 3 BHK Qtrs and 103
numbers of 2 BHK quarters in 4 towers, 242 numbers of EWS Quarters in 1 tower, Club
building (S+3) with two levels of basements and one stilt level on the first plot of land
and 46 numbers of 3 BHK + SQ Qtrs in 1 tower along with 42 numbers of EWS quarters
in 1 tower (S+7) with two levels of basements on the second plot of land with a total land
area of approx. 11.11 Acres. The scope shall also include 2 Nos. Basements (meant for
Parking & Services), ramps for entry/exit, all developments, external services within the
specified area, as per drawings and details. The layout of DUs to be constructed is
attached in Tender Drawings.

The major item of work covered under the scope are as under:-

1) Demolition of existing buildings at site (as per site conditions)


2) Transplantation of existing trees and plantation of new trees at site as per the
requirement of the Forest Department
3) Structure Design and Construction of 4 Nos. Type-A Towers with 2 BHK and 3
BHK Quarters of configuration 2B+S+26
4) Structure Design & Construction of 1 Nos. Tower of EWS Quarters of
configuration 2B+S+22
5) Structure Design & Construction of 1 Nos. Club Building of configuration S+3
(above podium)
6) Structure Design & Construction of 1 Nos. Type – B Towers with 3 BHK +
Servant Qtr Quarters of configuration 2B+G+22
7) Structure Design & Construction of 1 Nos. EWS Block of configuration 2B+S+7
8) Two level basements and one level podium in one portion of the land
9) Two level basements in the other portion of the land
10) Structure Design & Construction of 1 No. NBCC Site office of configuration
(G+1) and 1 Nos. 3 BHK and 1 Nos. 2 BHK sample flat with complete interiors
and furniture
11) Architectural & Civil Finishing for all works under scope
12) Green Building Certification of required rating i.e. minimum 3 Star GRIHA
13) Miscellaneous & Allied Works i/c Design/ construction/ installation and
commissioning and Handing Over complete.
a. Plumbing &Sanitary
b. External Water Supply & Sewerage, Storm Water Drainage System,
Drainage System, Rain Water Harvesting including Recharge Wells
c. Addressable type Fire detection and fire fighting & Sprinkler system
d. Internal & External Electrification, LT distribution system, Power Back
Page 2 of 29

Signature of Contractor NBCC

Digitally signed by ANUJ


NAVNEET CHACHA
Date: 2023.04.11 16:20:50 IST
Development of Hari Nagar Colony at New Delhi for DTC on Design, Engineering, Procurement &
Construction (EPC)

“Scope of Work”

up through Dual fuel type DG sets, rising mains, UPS, aviation


obstruction lights.
e. Occupancy Sensors for all Common Area Lightings like
Basement/Parking area, staircase, Ramps, Stilt Area, service rooms
etc.
f. CCTV, Fibre To The Home (FTTH) for LAN/DATA/WIFI/TEL/TV.
g. External service connections
h. Mechanical Ventilation, provision for A.C. in houses with disposal of
water.
i. Pumps
j. Solar Power Generation System, solar water heating system for Club.
k. Lifts/Elevators
l. Site Development & Landscape including Roads, Pathways,
horticulture, Solar Street Lights etc.
m. STP / WTP
n. Swimming Pool as per the Layout/Design.
o. Gym, Squash Court and other amenities as per the drawings
p. Miscellaneous other Services – Public Address System related to Fire
Fighting, Waste Composter for recycling of wet waste & Compactor
bins for dry waste, Outdoor & Landscape Lighting, Facade lighting,
EPABX/Intercom Communication System, Cable Tray, Signage System
for Towers, CCTV Surveillance system.
q. External Services, Services Distribution & other miscellaneous works
required to make the buildings fully functional.
r. Demolition of existing structures and shifting of Malba/ debris at
authorized locations
s. Shifting of existing services (if required)

1.1 DETAILED SCOPE OFWORK


1.1.1 Structural Design & Construction
1.1.1.1 Structural Works with Monolithic Technology with Aluminum Formwork/Prefab
Technology (including Diaphragm Wall, as required, excavation of earth work for
Basement, retaining wall, Basement raft, including removal/dismantling of existing/old
underground services as required)
Structures on the land parcel on the South of Shahid Major Rajiv Lal Marg :

Type-A towers(4 Nos. towers) of configuration upto 2B+S+26; Total 499 DUs, with 2
basements and stilt/podium level, including a fire check floor.

EWS tower (1 Nos. tower) of configuration upto 2B+S+22; Total 242 DUs

Extended basement (2 levels) and non-tower portion of the stilt floor

Structures on the land parcel on the North of Shahid Major Rajiv Lal Marg :

Type-B tower (1 Nos. tower) of configuration upto 2B+G+22; Total 46 DUs, along with
adjoining non tower area with 2 basements

Page 3 of 29

Signature of Contractor NBCC

Digitally signed by ANUJ


NAVNEET CHACHA
Date: 2023.04.11 16:20:50 IST
Development of Hari Nagar Colony at New Delhi for DTC on Design, Engineering, Procurement &
Construction (EPC)

“Scope of Work”

EWS Tower (1 Nos. Tower) of configuration upto 2B+S+7; Total 42 DUs

All residential towers shall be designed with Monolithic Technology with Aluminium
Formwork whereas basement under towers can be of conventional RCC framed
structure.

1.1.1.2 Structural Works with Steel Special Moment Resisting Frames (SMRFs) (including
Diaphragm Wall, as required, excavation of earth work for Basement, retaining wall,
Basement raft, including removal/dismantling of existing/old underground services as
required)

Club Building (1 nos.) of configuration G+2 (above stilt)

1.1.1.3 I) Design Work shall include:-

a) Detail design/preparation of drawings based on DBR;

b) Shop drawings and its approval from NBCC & from Proof Checking Agency.

c) Supply, fabrication, Construction, Installation and Commissioning.

d) Obtaining all interim and completion Approvals from NDMC and other local
statutory authorities.

II)Further, details (in brief) are as under: -

The detailed RCC/Structural Design, preparation of drawings for the buildings,


basements and spaces are within the scope of the contractor. The scope of work of
design and drawings of RCC/ structural expressly (but not limited to) includes the
following:
i) Foundation drawings/details & schedule, whether pile / raft or strip footing and /or
combination of footings.
ii) Basements
iii) Columns, pillars, piers, abutments, posts and struts.
iv) Shear walls

v) Retaining walls
vi) Diaphragm walls
vii) Suspended floors, roofs, landings, balconies and excess platforms
viii) Shelves (cast in situ/pre-cast)
ix) Lintels, beams, plinth beams, girders and cantilevers.
x) Stairs (including landing)
Page 4 of 29

Signature of Contractor NBCC

Digitally signed by ANUJ


NAVNEET CHACHA
Date: 2023.04.11 16:20:50 IST
Development of Hari Nagar Colony at New Delhi for DTC on Design, Engineering, Procurement &
Construction (EPC)

“Scope of Work”

xi) Arches, domes, vaults, curved floor plates in plan.


xii) Shafts, Lift wells.
xiii) Vertical and horizontal fins individually or forming box louvers band ,fascia’s and
eaves boards.
xiv) All steel structures in landscape/building such as projection, pergolas, trellis, porch
etc.
xv) Concrete Roads, Storm Water Drains and culverts.
xvi) All other structural works.
The detailed structural design and RCC shall be designed (suitable) for monolithic
aluminium form work system for residential towers.

However, the design for the basement others than residential tower shall be designed
as normal/ conventional RCC framed structure.
The scope of work of structural design of contractor shall also include the designing of
diaphragm walls, to be constructed, for the safety of the existing structures as well as
for the safety of the proposed structures to be constructed under this contract and also
for the safety of the proposed structures to be constructed in next phases as per the
directions of Engineer-in-charge, NBCC, which shall be final and binding on the
contractor.
The contractor shall also give the presentations on the design schemes to be prepared
by him to the NBCC/DTC/the Project Consultant, appointed by NBCC in the kick off
meeting before taking up the actual design work. The kick off meeting shall take place
within 15 days from the date of issue of letter of award.
The brief Design Basis Report (DBR) is the part of the tender document. Based on
DBR and architectural concept drawings, the detail design and drawings shall be
prepared by the contractor.
Material and construction system has been selected to be consistence with the
requirements of a “life of the building” as defined in table 1 of IS 875 : “Code of Practice
for Design Loads of Building and Construction”. This category relates to “Important
buildings and structures and recommends a specified design life of 100 years”.
The detailed design with calculations and related drawings so submitted by contractor
shall be checked and verified by the Consultant/Consultants associated structural
consultant, appointed by NBCC.
Further, the structural design along with RCC design shall also be got proof
checked/vetted by contractor from the reputed institute such as IIT, NIT or any other
institute including NBCC’s - NBCC Engineering & Consultancy Limited (NECL), as per
the decision taken by the NBCC.
The fees / charges to be paid to the reputed institutions or NECL for proof
checking/vetting of designs shall also be borne by the Contractor.

Page 5 of 29

Signature of Contractor NBCC

Digitally signed by ANUJ


NAVNEET CHACHA
Date: 2023.04.11 16:20:50 IST
Development of Hari Nagar Colony at New Delhi for DTC on Design, Engineering, Procurement &
Construction (EPC)

“Scope of Work”

The contractor has the obligation to make as many required modification(s) in the
design incorporating the observation(s), if so ordered by NBCC/Local Statutory
Authorities and resubmit the design and drawings. The contractor shall also be
responsible for obtaining the approvals from local authority(ies), if any.
The contractor shall also provide, the structural stability certificate in the format as
decided by NBCC.
However, the checking and vetting of design/drawings shall not absolve the contractor
from the responsibilities of any failure in the structural design and RCC design during
construction as well as during the specified life period of the structures.
The contractor shall submit all the submittals like designs, drawings, documents,
reports, schedules etc. in minimum six number of hard and six number of soft
(CD/DVD) copies.
The contractor shall also submit minimum six number of hard and six number of soft
copies of drawings and designs, after vetting of designs, for issue of good for
construction (GFC) drawings.
The contractor shall complete all the above-mentioned works including modification(s),
if any, within the two months from the 10th day of the date of the issue of letter of award.
The rates quoted by the bidder is deemed to be inclusive of all the expenditure to be
incurred in all the activities to be executed for detailed designing of structural design
and RCC as mentioned in this clause or otherwise to be incurred for this purpose. No
extra payment, whatsoever, on this account shall be payable to the contractor.
In addition to the documents prescribed in NIT for submission / uploading of tender,
the following certificate is also to be submitted as part of the technical bid submission
by the bidders:
a) Certified that we have an in-house structural consultancy services facilities with
minimum of 10 years of experience in the field of structural designing having completed
at least two structural design work of a multi-storied residential / non- residential
buildings with minimum ten storey’s with at least one number of basement or we shall
engage engineering firm of having similar experience of structural designing of
completion of at least of one multi storied residential /non-Residential building with
minimum 15 storey’s with at least minimum one number of basement.
NBCC shall provide the topographic survey drawing(s) and soil investigation report to
the bidder. However, it shall be the responsibility of bidder to carry out additionally the
soil investigation at his own cost. Further, the bidder/the appointed contractor is not
absolved of his responsibilities of accuracy of his design on account of the topographic
survey/soil investigation report provided by NBCC.
The contractor is also responsible for collection of any and all data’s/information, which
he may need for his design from any relevant source including (but not limited to) to
statutory bodies etc.
All these design and drawings will become the property of NBCC. The design and
drawings cannot be issued to any other person, firm or authority or used by the
Page 6 of 29

Signature of Contractor NBCC

Digitally signed by ANUJ


NAVNEET CHACHA
Date: 2023.04.11 16:20:50 IST
Development of Hari Nagar Colony at New Delhi for DTC on Design, Engineering, Procurement &
Construction (EPC)

“Scope of Work”

contractor for any other project. No copies of any design, drawing or document shall
be issued to anyone except the authorized representative of NBCC.
It shall be deemed all the expenditures to be incurred in structural design and RCC
design works in the activities as mentioned in clause 1.1 above and all other activities
required to do complete structure, RCC and MEP design works are inclusive in the
rates quoted by the contractor. No extra payment whatsoever on this account will be
payable to contractor.
It shall be deemed that contractor has satisfied himself as to the nature and location of
work, general and local condition and particularly, those pertaining to transport,
handling, availability and storage of materials, availability of labour/workforce, weather
conditions at site, general grounds/sub-soil conditions and all other conditions required
to execute and complete the work. The contractor shall have to quote his rates / offer,
accordingly.
NBCC will bear no responsibility for the lapse of such knowledge and also the
consequences thereof to the contractor. The information and site data shown in the
drawings mentioned in the tender documents are furnished for general information and
guidance only. NBCC in no case shall be held responsible for the accuracy thereof or
/ and deductions, interpretations or conclusions drawn there from by the contractor or
no claim shall be entertained whatsoever, if the site conditions/information’s are
different or otherwise incorrect. It shall be considered that the contractor has satisfied
himself for all possible contingencies, situations, bottlenecks and acts of co-ordination,
which may be required between the different agencies.

i) The detailed Civil/Structural, MEP Design/ preparation of Drawings for above


mentioned buildings /spaces are within the Scope of the Contractor.
The concept design (Architectural), Structural Design Philosophy of above
buildings/spaces, structural framing is provided in tender documents based on which
the contractor has to prepare detailed Civil/Structural/MEP drawings of each and every
aspect of the project required for construction of buildings in all respect. The Structural
Design & Drawings shall be got vetted from Architect Consultant appointed by NBCC.
Thereafter the contractor shall get the Structural, MEP Design & Drawings proof
checked from the third party, a Govt. Agency like IIT Delhi, IIT Roorkee or any other
body as may be approved by Engineer-in-charge in writing. No extra payment,
whatsoever, on this account shall be payable to the contractor.

ii) The contractor shall not be absolved of their responsibility of structural stability
and correctness of structural design. The contractor shall bear all the losses if
arises out of the failure of any part of the project.
iii) Based on the DBR & the architectural drawings, the agency shall submit the
structural & MEP design and drawings based on the Design Philosophy given
in the Technical Specification, within the time as stipulated in Table of Milestone
in the SCC. Every Civil/Structural/MEP drawing /detail shall be prepared
conforming to detailed Technical specification, CPWD specifications and
relevant IS code. All dimensions of various structural members / slabs /
columns / elements shall be gotten approved by NBCC.
Page 7 of 29

Signature of Contractor NBCC

Digitally signed by ANUJ


NAVNEET CHACHA
Date: 2023.04.11 16:20:50 IST
Development of Hari Nagar Colony at New Delhi for DTC on Design, Engineering, Procurement &
Construction (EPC)

“Scope of Work”

iv) The Civil/Structural/MEP Design & Drawings (whether RCC or Structural Steel
or composite) expressly (but not limited to) includes following:-

a. Studying the Architectural Concept Design, Structural/MEP Design


Philosophy, submitting proposed structural design framework of each
building/floor/area and obtaining approval of NBCC. Due care to be
taken for integrating the structural drawing with the Architectural
Drawings & with all MEP Services, Landscape features & Elevation
features etc.

b. Design on appropriate software like Staad-Pro/Etab and drawing on a


software like Auto CAD including fabrication drawings, shop drawings,
bar bending schedule etc. of each and every component of
buildings/spaces within Scope of work on suitable scale, including but
not limited to:-

i. Foundation Drawings/Details & Schedule, whether pile/ raft or


strip footing and/or combination of footings;
ii. Basement Drawings.
iii. Column Drawings/Schedule;
iv. Retaining walls, Diaphragm walls;;
v. Suspended floors, roofs, landings, balconies and access
platform;
vi. Shelves (Cast in situ/pre-cast);
vii. Lintels, beams, plinth beams, girders, bressumers and
cantilevers;
viii. Columns, Pillars, Piers, Abutments, Posts and Struts;
ix. Stairs (including landings);
x. Arches, domes, vaults; curved floor plates in plan
xi. Shafts;
xii. Vertical and horizontal fins individually or forming box louvers
band, facias and eaves boards.
xiii. All steel structures in landscape/building such as projection,
pergolas, trellis, porch etc.
xiv. Mechanical, Electrical & Piping works.
c. Execution of complete work as per detail scope of work, Technical
specification and drawings.

v) The Structural system is designed as a shear wall resisting framed structure.


Design Life
Materials and construction systems has been selected to be consistent
with the requirements of a “life of the building” as defined in Table 1 of
IS 875: “Code of practice for design loads of building and construction”.

1.1.2 Architectural & Civil finishing for all Works under Scope

Page 8 of 29

Signature of Contractor NBCC

Digitally signed by ANUJ


NAVNEET CHACHA
Date: 2023.04.11 16:20:50 IST
Development of Hari Nagar Colony at New Delhi for DTC on Design, Engineering, Procurement &
Construction (EPC)

“Scope of Work”

I) The scope of work of the Contractor shall be as under:-

a) Preparation of drawing & integration of all work into BIM model;

b) Shop drawings and its approval;

c) Supply, fabrication, Construction, Installation and Commissioning.

d) The contractors shall take drawings from NBCC & using his structural design,
integrate all aspects of the project into a BIM model which will be shared & used
for construction.

II) Further, details (in brief) are as under:-


i) The Basements shall be used for parking, services & operation/maintenance of
the project. There will be medium sized truck access to all levels of Basement
for maintenance. The Basement will include:-

• Epoxy coated floor in driveway & parking bays (over tre-mix base)

• Fire Exit stairs with Signage as per Fire norms. Fire exit staircase doors
to have panic bars & Fire rated glass is 1.5 sqm. vision panel per
shutter.

• Access to all areas.

• General toilets.

ii) The finishing work of all basements, within quarters/flats, external areas outside
building & all common areas within the buildings (like lift lobbies, staircases,
ground floor lobbies, covered walkways, service lift lobbies & service areas,
toilets etc.)is included in the Scope of Works.The various parts of the project
shall be finished/executed as per Schedule of Finishes provided in tender
document.

1.1.2.2 Green Building Certification

The project is to be built fully compliant to GRIHA 3 star norms for complete scope in
this contract. All electrical & mechanical fittings / fixture / appliances, to be provided for
the work, should have latest minimum 3 star rating (of BEE) as available in market.
Since, the proposed construction is for 3 star GRIHA rating, all fittings and fixtures shall
be provided which suits to the proposed GRIHA rating.

1.1.3 Miscellaneous & Allied works

(a) Plumbing & Sanitary

(i) The Scope of work of the Contractor shall be as under:-

a) Detailed Designing and preparation of Shop drawings and its approval


Page 9 of 29

Signature of Contractor NBCC

Digitally signed by ANUJ


NAVNEET CHACHA
Date: 2023.04.11 16:20:50 IST
Development of Hari Nagar Colony at New Delhi for DTC on Design, Engineering, Procurement &
Construction (EPC)

“Scope of Work”

(reference of DBR shall be taken);

b) Supply, fabrication, Construction, Installation and Commissioning.

c) Obtaining Approval from Delhi Jal Board.

(ii) Further, details (in brief) are as under:-

a) The Plumbing/Sanitary Design & Schematic/Line drawings is part of Scope of


work. However, detailed fabrication/execution drawings & shop drawings, as
required at site are to be prepared by the Contractor and got approved from
NBCC before proceeding with the work.

b) The preparation of Sanitary/Plumbing fabrication & shop drawings expressly


(but not limited to) includes the following:-

(i) Integration of detailed shop drawings with Civil/Structural details


prepared by Contractor for each building and obtaining approval of
NBCC.

(ii) Preparation of fabrication & shop drawings on a software like Auto CAD
etc. of each and every part of building having a sanitary/plumbing
aspect within Scope of work on suitable scale.

c) The Execution of Plumbing/Sanitary work for buildings /spaces as per Scope


of the work, DBR, Technical Specifications and Drawings. The Sleeves, Cut
out, Drainage arrangement, embedment, concealed piping, hot & cold water
arrangement, overhead tanks, water recycling system etc. and connecting the
service to the main line of MCD/DJB are expressly included (but not limited to)
in the scope of work.

d) The toilets in all floors of all blocks are to be completely fitted & finished
including all plumbing & sanitary fixtures & fitting.

e) Additional toilets for drivers, security & maintenance staff (with the provision
of handicap toilet) are also to be built & finished at ground / basement as per
requirements.

f) Water Treatment Plants along with HPN type fully Automatic Domestic water
Boosting Pumps, HPN Type Flushing Pumps, HPN Type Irrigation Pumps,
Automatic Sump Pumps etc along with required piping & electrical works.

g) Water Metering: Smart water meters for each apartment at all incoming
lines/pipes along with monitoring/recording consumption at single point &
generation of bills with latest software, hardware/desktop, coloured printers
etc in all respect to be established as per approved design.

(b) External Water Supply & Sewerage, Storm Water Drainage System, Drainage
System, Rain Water Harvesting including Recharge Wells
Page 10 of 29

Signature of Contractor NBCC

Digitally signed by ANUJ


NAVNEET CHACHA
Date: 2023.04.11 16:20:50 IST
Development of Hari Nagar Colony at New Delhi for DTC on Design, Engineering, Procurement &
Construction (EPC)

“Scope of Work”

(i) The scope of work of the Contractor shall be as under:-

a) Detailed Designing and preparation of Shop drawings and its approval;

b) Supply, fabrication, Construction, Installation and Commissioning.

c) Obtaining Approval from Local Body.

(ii) Further, details (in brief) are as under:-

a) The External Water Supply & Sewerage, Storm Water Drainage System,
Drainage System, Rain Water Harvesting including Recharge Wells- Design&
Schematic/Line drawings is part of the scope of work. However, detailed
fabrication/execution drawings & shop drawings, as required at site are to be
prepared by the Contractor and shall be got approved from NBCC before
execution of the work. External Water Supply & Sewerage Work for Phase-1
area shall be executed by the Agency.

b) The preparation of External Water Supply & Sewerage, Storm Water Drainage
System, Drainage System, Rain Water Harvesting including Recharge Wells-
Design fabrication & shop drawings expressly (but not limited to) includes the
following:-

(i) Integration of detailed shop drawings with Civil/Structural details


prepared by Contractor for each building and obtaining approval of
NBCC.

(ii) Preparation of fabrication & shop drawings on a software like Auto CAD
etc.

c) The execution of work for above scope of the work read with Technical
Specifications and Drawings and connecting the services from first manhole to
the main line of the Authorities like MCD/DJB including approval from the
MCD/DJB (as applicable).

d) Design, installation, testing, commissioning and handing over of the above


services with all services in running condition is included in Contractor’s scope
of work.

(c) Fire Fighting & Sprinkler System

I) The scope of work of the Contractor shall be as under:-

a) Detailed Designing and preparation of Shop drawings and its approval;

b) Supply, fabrication, Construction, Installation and Commissioning;

c) Obtaining approval of Delhi Fire Services(DFS)

II) Further, details (in brief) are as under:-


Page 11 of 29

Signature of Contractor NBCC

Digitally signed by ANUJ


NAVNEET CHACHA
Date: 2023.04.11 16:20:50 IST
Development of Hari Nagar Colony at New Delhi for DTC on Design, Engineering, Procurement &
Construction (EPC)

“Scope of Work”

a) Detailed Design & engineering, supply, erection, testing,


commissioning and handing over of complete fire protection system for
all the buildings and premises in line with the stipulation of National
Building Code2016.

b) The work shall include providing and commissioning fire-fighting


pumps, delivery line, electrical Panel, internal and external Hydrants,
sprinkler system, piping, hose cabinet and landing valves, portable fire
extinguisher and any other firefighting measure (including gas
Suppression in electrical panels, Gas flooding in UPS & Control
Rooms), Fire Curtains complete as per requirement of National Building
Code2016.

c) The piping system confirming to IS: 1239 for upto 150mm dia. & from
more than 150 mm dia., Pipe confirming to IS:3589 shall be supplied
installed, tested and got approved from the local/statutory authority and
handed over to employer as per Drawing and Technical Specifications.

Following are the Fire Fighting and Fire Protection System Proposed as per
NBC :-
• Fire Extinguisher system and FHC
• Piping system confirming to IS: 1239 for pipes upto 150mm dia and
IS:3589 for pipes above 150mm dia – MS Heavy Class
• Dry Wet Riser system
• Water Curtains
• Fire Curtains
• Fire Suppression systems
• External fire hydrants
• OH Fire water tank
• Sprinklers provides in Basement and Towers as per NBC2016.
• Underground Fire water static storage has been provided in accordance
to NBC requirement and as per IS:3844

Fire department connection shall be provided on the external wall/ at


designated location for Underground tank, Fire brigade draw-out connection
shall be provided to draw-out water during the emergence of fire.
The fire pumping system shall comprise of independent electrical pump and
sprinkler system driven by the dedicated diesel engine & pumps.

(d) Electrical Services like ESS, DG, Panels, Distribution, Internal Electrical
Works, Fire Alarm, CCTV etc.(reference of DBR shall be taken for detailed
design, fabrication & shop drawings)
The electrical services scope of works includes the following: -
(Note: The Electric Substations i/c Transformers, HT/LT Main Panels, LT Cabling
up to Feeder Pillars etc. shall be established by BSES directly appointed by NBCC
on cost deposit basis. Therefore only the Built up space along with ROW i/c
Trench/Duct/Cable Trays shall be provided by the Bidder/Contractor.)
Page 12 of 29

Signature of Contractor NBCC

Digitally signed by ANUJ


NAVNEET CHACHA
Date: 2023.04.11 16:20:50 IST
Development of Hari Nagar Colony at New Delhi for DTC on Design, Engineering, Procurement &
Construction (EPC)

“Scope of Work”

i) LT Power Distribution from BSES Feeder Pillars to Energy Meters &


individual House DBs for BSES Power and Power Backup with DG Sets
along with distribution network i/c cabling, rising mains, block panels,
Meter Panels, Auto Changeovers, smart energy meters etc complete in
all respects.

ii) Power back up /stand by Generating System with Dual Fuel Type DG
Sets for all the 3BHK/2BHK Flats as per fixed load details and essential
services like Common Area Lightings, lifts, WTP, STP etc. (For
Residential Towers – Type-A, Type – B) and entire area for club.

iii) Power back up /stand by Generating System with Dual Fuel Type DG
Sets for all the essential services like Common Area Lightings, lifts, WTP,
STP etc. (For EWS Towers)

iv) LT Power distribution

v) Fire Suppression System for essential panels like LT main Panels, Lift panel,
Fire Panels etc and Gas Flooding system for Control Room/ UPS Rooms

vi) UPS for emergency lighting and low voltage equipment’s including FTTH,
EPABX, Fire Alarm & CCTV

vii) General lighting/power layout works for car parking area and Service
rooms, apartments.

viii) Lightning Protection System

ix) Earthing and T-N-S grounding system

x) Solar Photovoltaic system complete in all respects

xi) Life Safety and emergency evacuation system

xii) Fire Detection and Alarm System (Addressable and Hybrid System).

xiii) Fibre To The Home – complete Active & Passive works for Data/Wifi/
Tel/TV including OFC, OLT, ODN, ONT, Cat6 cabling etc.

xiv) External Solar LED Lighting (Hybrid- All in One Unit-Compact Fixtures) complete
in all respects

xv) Internal Lighting & External Lightings, Façade Lightings

xvi) Complete Internal Electrical Works including Wiring, light fixtures,


Ceiling/Exhaust fans, Call bells in apartments etc.

xvii) EPABX Telephone- Intercom System

Page 13 of 29

Signature of Contractor NBCC

Digitally signed by ANUJ


NAVNEET CHACHA
Date: 2023.04.11 16:20:50 IST
Development of Hari Nagar Colony at New Delhi for DTC on Design, Engineering, Procurement &
Construction (EPC)

“Scope of Work”

xviii) PA System & Fire Evacuation System

xix) Rising Mains for Power Back up supply System

xx) CCTV & Security System

xxi) Ventilation System

xxii) Complete Lift/Elevators Works

xxiii) Boom Barriers

• FRLS PVC insulated copper wires will be used for all sub mains and final circuit
wiring in conduit. All life safety equipment cabling shall be Fire Survival
category (for Fire, Ventilation, Lifts etc.)

• MS Heavy Duty conduit will be used for Electric wiring and PVC Heavy duty for
all extra low voltage wiring e.g. Telephone/ TV cables, data cables and CCTV
etc. either concealed in concrete or on surface.

• Armoured Copper (XLPE) Cables up to 16Sq.mm & armoured aluminium


cables for all above sizes will be used for all type of Electric supply.

• Armoured Copper (XLPE) Cables shall be used for individual flat incoming
supply i.e. from BSES feeder pillar to Meter Board through underground
HDPE/DWC/RCC pipes and from Meter to each flat’s MCB DB through cable
trays to be installed in the electric shaft along with earthing strips.

• Armoured cable will be used for all external landscape lighting.

Emergency Lighting / Escape lighting will be capable of:-

a) Indicating clearly the escape routes.

b) Providing adequate illumination along such routes to allow safe


movement of persons towards and through the exits,

c) Ensuring that fire alarm call points and firefighting equipment provided
along the escape routes can be readily located.

(d1) DG Sets, UPS

I) The scope of work of the Contractor shall be as under:-

a) Detailed Designing and preparation of Shop drawings and its approval;

b) Supply, fabrication, Construction, Installation and Commissioning;


Page 14 of 29

Signature of Contractor NBCC

Digitally signed by ANUJ


NAVNEET CHACHA
Date: 2023.04.11 16:20:50 IST
Development of Hari Nagar Colony at New Delhi for DTC on Design, Engineering, Procurement &
Construction (EPC)

“Scope of Work”

c) Obtaining approval of Municipal Corporation of Delhi (MCD), BSES &


Delhi Fire Services, Central Electricity Authority/ Delhi Inspectorate as
applicable.

II) Further, details (in brief) are as under:-

a) Providing a complete end to end Electrical Supply System that will


include receiving LT panels, creation of an Energy Center with Diesel
Generators & ensuring complete distribution as per internal electrical
scheme.

b) Preparation of Shop Drawings required in B.I.M. (Building Information


Modeling format) for LT Distribution, DG Set, Bus Trunking etc. and
approval of the same from NBCC and Power Supply agency.

c) Construction of Machine Foundations for all heavy Equipment

d) Supplying and fixing of all equipment’s like LT Panel, Floor Panels,


Meter Panels, DG Sets, UPS, Bus Trunking, earthing, power cable,
safety equipment’s etc. as per technical specification & drawings and
direction of NBCC/ Power supply Agency (BSES) and as per Drawing
and Technical Specification.

e) Supplying & Installation of required Auto Change-over Panels at every


floor or as per requirement.

f) Smart Metering for DG Power Back Up along with consumption


monitoring/ recording & generation of electric bills at single point
through advance/latest software, hardware/desktop, printer etc.

g) All Electrical works to be executed with close coordination with electric


authority BSES & NBCC Project Team.

h) Commissioning and handing over.

i) Taking approval of installations from MCD/Electricity Supply


Distribution Authorities, CEA/ Delhi Inspectorate.

(d2) INTERNAL ELECTRICAL WORKS

I) The scope of work of the Contractor shall be as under:-

a) Detailed Designing and preparation of Shop drawings and its approval

b) Supply, fabrication, Construction, Installation and Commissioning.

II) Further, details (in brief) are as under:-

Page 15 of 29

Signature of Contractor NBCC

Digitally signed by ANUJ


NAVNEET CHACHA
Date: 2023.04.11 16:20:50 IST
Development of Hari Nagar Colony at New Delhi for DTC on Design, Engineering, Procurement &
Construction (EPC)

“Scope of Work”

a) The internal electrification Design & Schematic/Line drawings. Any


improvements recommended in drawings as per updated
technology/product for benefit of project may be proposed by contractor
at the time of execution which is to be approved by Engineer-in- charge.
However, detailed fabrication and shop drawings, as required for
execution at site are to be prepared by the Contractor in B.I.M. (Building
Information Modelling) format and got approved from NBCC before
proceeding with the work.

b) The Layout design (Scheme of Electrical arrangements of Electrical


works for buildings/spaces and shop drawings in B.I.M. (Building
Information Modelling) format of each and every aspect of the project,
required for execution integrated with Civil/Structural/Architectural
Drawings for each Building/Spaces and obtaining approval of NBCC.

c) Preparation of Drawing on a software like B.I.M. format etc. of each and


every part of building having an Internal Electrical aspect within Scope
of work on suitable scale.

d) The Execution of Internal Electrical work for buildings /spaces as per


Scope of work read with Technical Specifications and Drawings. The
following items are expressly included (but not limited to) in Internal
Electrical execution:-
a. Each floor/area slab/wall concealed electrical copper wiring/
cabling/conduiting network including GI fan boxes, MS conduits,
GI Switch Boxes, Copper wires/cables etc.;

b. Various type of LED Lighting fixture, ceiling fans, exhaust fans,


Call bells;

c. Switch boards, switches, plugs, ceiling fans, exhaust fans,


regulators, UPS power for common areas etc.;

d. Distribution boards, Circuit breaker, MCB, RCCB, MCCB,


Junction boxes, energy meters, Electrical Panels (Low Voltage/
Medium Voltage/High Voltage), Earthing etc.;

e. L.T., M.V. Cables laying including customized cable tray for


multiple services installation in basements, supporting
accessories, fittings & fixtures etc.,

f. Silent Type Dual Fuel Based Diesel Generator sets with start-
stop switches, alternator, fuel tank, exhaust system, acoustic &
weather proof enclosure etc.

g. All work to be carried out with prior approval of NDMC / statutory


authorities & part commissioning approvals also to be obtained
from NDMC / statutory authorities & distribution agencies.

h. BSES Power Metering in Apartments : All individual apartments


Page 16 of 29

Signature of Contractor NBCC

Digitally signed by ANUJ


NAVNEET CHACHA
Date: 2023.04.11 16:20:50 IST
Development of Hari Nagar Colony at New Delhi for DTC on Design, Engineering, Procurement &
Construction (EPC)

“Scope of Work”

to have metering with individual meters provided in metering


panel in electrical room/shaft at ground floor of each tower as
per approved design.

i. DG Power Metering in Apartments: All individual apartments to


have metering with individual meters provided in metering panel
with Auto Changeover in electrical shaft at each/respective floor
of residential towers as per approved design.

j. Metering for Common Services: All Common services to have


metering with both type of meters (BSES Power & DG Power)
provided in respective Common service panels with Auto
Changeover/ATS as per approved design.

(d3) INTERNAL LIGHTING WORKS

I) The scope of work of the Contractor shall be as under:-

a) Detailed Designing and preparation of Shop drawings and its approval

b) Supply, fabrication, Construction, Installation and Commissioning.

II) Further, details (in brief) are as under:-

i) Light Fixture Design

a) All the fixtures to be of best quality finish ( in terms of product


design, appearance, powder coating, internal reflectors,
diffusers and overall finish) in order to give the interiors and
basement car parking a distinctive look and feel.

b) All fixtures to have such fixing arrangements to the surfaces


these have to connect, that orientation of fixtures remains
architecturally aligned, fixtures are trim-less or have less than
3mm trim; connectors between lengths and to the mounting
surfaces are quite robust and mostly click fixed.

c) Fixture wattages have not been defined. Only minimum Lumen


have been defined for each fixture. All fixtures (except for
Aviation lights and Exit signs) have been rated for its Lumen
package (coming out of fixture) and not system wattage. Lumen
Page 17 of 29

Signature of Contractor NBCC

Digitally signed by ANUJ


NAVNEET CHACHA
Date: 2023.04.11 16:20:50 IST
Development of Hari Nagar Colony at New Delhi for DTC on Design, Engineering, Procurement &
Construction (EPC)

“Scope of Work”

output from the fixtures have been defined to achieve the


desired Lux levels and the manufacturer will offer lowest
wattage possible as per the best product technology available
at the time of procurement, to meet the Lumen requirement.

ii) The emergency lighting will be provided to be put on within 1 sec of the
failure of the normal lighting supply.

(d4) FIRE ALARM SYSTEM

I) The scope of work of the Contractor shall be as under:-

a) Detailed Designing and preparation of Shop drawings and its approval;

b) Supply, fabrication, Construction, Installation and Commissioning;


c) Obtaining approval of Delhi Fire Services(DFS)

II) Further, details (in brief) are as under:-

a) Detailed fabrication & shop drawings, required in B.I.M (Building


Information modeling format) as required for execution at site are to be
prepared by the Contractor and got approved from NBCC before
proceeding with the work.

b) To provide Addressable type fire alarm and detection system with


associated communication and notification as per Drawing and
Technical Specification.

c) The system shall be supplied installed, tested and got approved from
the local/statutory authority and handed over to employer in an
operational condition as per Drawing and Technical Specification.

(d5) CCTV
I) The scope of work of the Contractor shall be as under:-

a) Detail design and preparation of drawings based on DBR;


b) Detailed Designing with Shop drawing & obtaining NBCC approval
c) Supply, Fabrication, Construction, Installation and Commissioning.
d) Obtaining Statutory & NBCC approval of Commissioning.

II) Further, details (in brief) are as under:-

Providing, installation, testing & commissioning of IP based CCTV system in


the Complex. The CCTV system shall monitor Main Entry/Exits, entrance
lobbies, lift lobbies as specified, common areas, parking in basements, Pump
room, Control Room, STP Room, Indoor DG Room, Driveways, Roads,
Page 18 of 29

Signature of Contractor NBCC

Digitally signed by ANUJ


NAVNEET CHACHA
Date: 2023.04.11 16:20:50 IST
Development of Hari Nagar Colony at New Delhi for DTC on Design, Engineering, Procurement &
Construction (EPC)

“Scope of Work”

Gardens/Green Parks etc. as specified.

(d6) ELECTRICAL DISTRIBUTION SYSTEM

I) The scope of work of the Contractor shall be as under:-

a) Detail design and preparation of drawings based on DBR;

b) Detailed Designing with Shop drawing & obtaining NBCC approval.

c) Supply, Fabrication, Construction, Installation and Commissioning.

d) Obtaining Statutory & NBCC approval of Commissioning.

II) Further, details (in brief) are as under:-

a) Providing and laying/fixing cabling from the main receiving station,


rising main, meter boards, electrical panel etc. as per Drawing and
Technical Specification

b) Construction of Service ducts for electrical supply etc. as per Drawing


and Technical Specification.

c) Testing & commissioning of complete installation after Service


Connection/tapping of electrical supply from the main/municipal system
by executing agency.

d) Construction of Service ducts for electrical, water supply etc. as per


Drawing and Technical Specification

(e) Mechanical Ventilation for Basement, Lifts & Service Rooms

I) The scope of work of the Contractor shall be asunder:-

a) Detailed Designing and preparation of Shop drawings and its approval;

b) Supply, fabrication, Construction, Installation and Commissioning;

c) Obtaining approval from Delhi Fire Services(DFS)/ Delhi Inspectorate.

II) Further, details (in brief) are as under:-

a) The scope of work includes the Mechanical Ventilation Design & Schematic/Line
drawings. Preparation of shop drawings in BIM (Building Information Modeling Format)
integrating with the structural and Architectural Drawings for basement ventilation and
as per Drawing and Technical Specification, as required for execution at site are to be
Page 19 of 29

Signature of Contractor NBCC

Digitally signed by ANUJ


NAVNEET CHACHA
Date: 2023.04.11 16:20:50 IST
Development of Hari Nagar Colony at New Delhi for DTC on Design, Engineering, Procurement &
Construction (EPC)

“Scope of Work”

prepared by the Contractor and got approved from NBCC before proceeding with the
work.

b) Collection of data and preparation of pressurization calculation and data sheet for
blowers and obtaining approval of NBCC.

c) Supplying and fixing of all equipment’s as per technical specification, drawings and
design.

d) Ducting, Fire Insulation and Fixing of Fans/ blowers etc.

e) Work includes pressurization of staircases, all elevator/Lift wells & all elevator lobbies
as per NBC.

f) Work includes smoke exhaust ventilation from all floors of all blocks as per NBC
requirement.

g) Work includes Basement ventilation as per fire norms – including fresh air supply &
ventilation. Work includes provision of ventilation according to parking requirements &
norms for supply & exhaust of carbon dioxide.

h) Air Distribution shall be distributed through factory fabricated GI ducts.

i) Mechanical exhaust is provided for all toilets as per NBC requirement. Toilets are
provided with in line exhaust/propeller fan. Make up will come from adjoining areas
through door under cut or transfer grill.

j) Exhaust from Basement Car Parking;


Mechanical ventilation system for basement car parking is designed to provide 6 air
changes per hour (ACPH) for normal ventilation and additional 6 air changes per hour
in case of fire or distress call. The system shall comprise fresh air and extract air fans
sized for 6 ACPH and 6 ACPH respectively in case of normal operation & Additional
fresh air and exhaust fan are also provided which will run in case of fire with same air
changes per hour connected to respective fresh air and exhaust airshafts.

All Ventilation fans have to be provided with CO sensors & PLC/VFDs along with
Bypass starters for automatic operations in normal & emergency modes.

k) Exhaust from D.G.Room;


Mechanical Ventilation system is proposed in DG set room as per DG set heat
dissipation to keep the DG room temperature within a limit to avoid any de-rating in
DG output. DG room supply and exhaust air quantity shall be calculated based on DG
set heat dissipation data. DG Room shall be provided supply and exhaust
arrangement to maintain DG Room temperature as recommended by the
manufacturer. In order to control the Noise level acoustic lining shall be provided in
DG room.

l) Mechanical ventilation of Services Area;


Mechanical Ventilation system is proposed in Services area such as Pump Room,
STP Room, Solid Waste Composter Rooms, Control Room etc. To cater dissipated
heat, odour etc., supply air and exhaust air quantity shall be calculated based on NBC.
m) Air-conditioning
Page 20 of 29

Signature of Contractor NBCC

Digitally signed by ANUJ


NAVNEET CHACHA
Date: 2023.04.11 16:20:50 IST
Development of Hari Nagar Colony at New Delhi for DTC on Design, Engineering, Procurement &
Construction (EPC)

“Scope of Work”

Split Air conditioning units of required nos. & size are to be provided in residential
sample flats, Site Office, Security/Control rooms etc. Only Space provision for split AC
is proposed for all residential apartments with 63mm PVC sleeves in walls to cross the
copper pipes and providing concealed drain pipes from indoor unit to the nearest water
drains.

(f) Solar Panels

I) The scope of work of the Contractor shall be as under:-

a) Detail design and preparation of drawings based on DBR;

b) Detailed Designing/preparation of Shop drawings and its approval;

c) Supply, fabrication, Construction, Installation and Commissioning;

II) Further, details (in brief) are as under:-

a) The scope shall include detailed designing and fabrication/execution


drawings and shop drawings, as required for generating solar power for
street lighting and other areas, shall be prepared by the Contractor and
got approved from NBCC.

b) Supplying and fixing of all equipment’s, Solar panels,


networking/Cabling, GI Structure etc. as per technical specification,
drawings and design.

c) Commissioning & testing of the entire system.

(g) Elevators

I) The scope of work of the Contractor shall be as under:-

a) Detailed Designing and preparation of Shop drawings and its approval;

b) Supply, fabrication, Construction, Installation and Commissioning;

c) Obtaining approval of Lift Inspector

II) Further, details (in brief) are as under:-


a) For Type A Tower quarters, 3 Nos. Passenger lifts and 1 no. service lift
(including basements), shall be provided for each tower.
b) For Type B Tower quarters, 2 Nos. Passenger lifts and 1 no. service lift
(including basements), shall be provided for Type B tower.
c) For EWS Quarters, 3 Nos. Passenger lifts and 1 no. service lift
(including basements), shall be provided for the EWS tower.
d) For EWS Quarters on the small plot, 2 Nos. Passenger lifts and 1 no.
service lift (including basements), shall be provided for the EWS tower.
Page 21 of 29

Signature of Contractor NBCC

Digitally signed by ANUJ


NAVNEET CHACHA
Date: 2023.04.11 16:20:50 IST
Development of Hari Nagar Colony at New Delhi for DTC on Design, Engineering, Procurement &
Construction (EPC)

“Scope of Work”

e) For the Club Building, 2 Nos. Passenger lifts and 1 no. service lift
(including basements), shall be provided for the Club Building.
f) Providing, installation, testing and commissioning and handing over of
elevators of required capacity as per drawings and technical
specification. Detailed fabrication & shop drawings, required in B.I.M
(Building Information modeling format) as required for execution at site
are to be prepared by the Contractor and got approved from NBCC
before proceeding with the work.
g) Obtaining approval from lift inspector for erection as well as after
commissioning.
h) Passenger & Service Elevators – The lifts shall be of high quality,
maintenance friendly finishes & include all accessories. The internal
finishes & all features of all passenger elevators shall be similar. The
interiors shall be in Brushed Stainless Steel finish at all sides. The
features & Finishes shall be as per DBR/Tech specs. However, the
features & finishes shall be approved by NBCC/Project Architect as per
latest/modern prevailing features/finishes. Contractor has to obtain the
approvals of the same in advance before proceeding ahead.

(h) Site Development & Landscape

I) The scope of work of the Contractor shall be as under:


a) Detailed Design for works such as Stainless Steel works/ Artworks etc.;

b) Detailed Designing and preparation of Shop drawings and its approval from NBCC;

c) Supply, fabrication, Construction, Installation and Commissioning;

II) Further, details (in brief) are as under:-

a) Construction of Internal Roads, Berms, Pathways, Kerbs, open parking space etc.
including connecting with the external road network as per Drawing and Technical
Specification.

b) Hard and Soft Landscape in open land area including all horticulture operation, earth
filling, grassing, tree plantation etc. as per Drawing and Technical Specification

c) Hard landscape to be done to achieve a high quality urban environment with


permanent maintenance friendly features using granites in variety of anti-skid finishes.

d) Work to include built in planters & seating, large tree planters in stone, bush / ground
covers in planters, street furniture in mono lithic stone benches.

e) Street furniture’s to include litterbins, water fountains, bollards, Fire tender path
markers etc. will be developed, approved &installed.

f) Roads to have recycled Concrete kerb stones.

Page 22 of 29

Signature of Contractor NBCC

Digitally signed by ANUJ


NAVNEET CHACHA
Date: 2023.04.11 16:20:50 IST
Development of Hari Nagar Colony at New Delhi for DTC on Design, Engineering, Procurement &
Construction (EPC)

“Scope of Work”

g) Fire tender path to be maintained & marked around all Blocks as per Fire norms.

h) Ramp entrances & exits to have MS Trellis with Multiwall polycarbonate canopies as
per detailed design so as to shelter the entrances.

i) Basement Fire exits to be made as landscaped features by enclosing in Trellis &


planters at Ground level.

(i) STP /Solid Waste Management/WTP


SEWAGE TREATMENT PLANT (MBR TECHNOLOGY) The
scope of work of the Contractor shall be as under:-
a) Detail design and preparation of drawings based on DBR;
b) Detailed Designing/preparation of Shop drawings and its approval;
c) Supply, Fabrication, Construction, Installation and Commissioning.
d) Obtaining statutory approval from DPCC/ Environment Clearance Authority.

Further, details (in brief) are as under:-

There will be a city sewer connection but all the sewerage generated will be fully
treated within the project at the STP & waste water is recycled.

Providing a Sewerage Water Treatment Plant in an underground construction


which will be used to collect, hold, recycle & redistribute water. The waste will be
collected from sewerage network. The distribution will be done to horticulture & to
dual plumbing network in toilets for flushing with automatic HPN type pumps & to
any other identified locations.

Solid Waste Management

The scope of work of the Contractor shall be as under:-

1. Detail design and preparation of drawings based on DBR;

2. Detailed Designing/preparation of Shop drawings and its approval;


3. Supply, Fabrication, Construction, Installation and Commissioning.

4. Obtaining statutory approval from DPCC/ Environment Clearance Authority.

Further, details (in brief) are as under:-

Following would be the major sources of generation of solid waste:-

a) Packaging waste / Building materials

b) Waste from residential quarters.

c) Street sweepings.

Page 23 of 29

Signature of Contractor NBCC

Digitally signed by ANUJ


NAVNEET CHACHA
Date: 2023.04.11 16:20:50 IST
Development of Hari Nagar Colony at New Delhi for DTC on Design, Engineering, Procurement &
Construction (EPC)

“Scope of Work”

d) Horticulture waste

Solid Waste Composters for Wet Wastes and Compactor Bins for Dry Waste as per
required numbers, size/capacity in all respect as per approved design/drawings to be
provided installed & commissioned along with operation & maintenance as per
contract conditions.

WATER TREATMENT PLANT

The scope of work of the Contractor shall be as under:-

i. Detail design and preparation of drawings based on DBR;

ii. Detailed Designing/preparation of Shop drawings and its approval;

iii. Supply, Fabrication, Construction, Installation and Commissioning.

iv. Obtaining Statutory & NBCC approval of Commissioning.

Further, details (in brief) are as under:-


Providing water treatment & underground storage tanks with pump room etc. These
include tanks for fire, Raw water, treated/soft water & recycled water (STP). Treated Water
Supply shall be made to all occupants throughout the day through OHT boosted with HPN
type automatic Pumping system as per schedule settled with NBCC. The supply
distribution shall be through details given in technical specification documents.

The water will be treated as per required health standards for safe drinking water.
The primary fresh water source will be municipal water supply.
Water treatment plant (WTP) provisioned to ensure that the chemical and bacteriological
parameters of water supply in the development are in accordance with World Health
Organization (WHO) Standards. WTP Specifications will be based on the water test,
analysis report of the sourced water. Water required for potable purpose will be in
compliance of IS: 10500 standards.

J) OUTDOOR & LANDSCAPE LIGHTING

The Scope of work of the Contractor shall be as under:-

(i) Detailed Designing and preparation of Shop drawings and its approval from NBCC;

(ii) Supply, Fabrication, Construction, Installation and Commissioning.

All external landscaped areas will be adequately lit with approved Solar based (All in one-
Compact- Hybrid type) lighting fixtures so as to provide lighting to all pedestrian walkway,
vehicular roads, entrances to complex, to buildings, to basements etc., to all fire exits. The
landscape lighting will be done so as to create a pleasant environment in the evening for
a safe & pedestrian friendly environment. The lighting will accentuate trees by uplighting,
direct traffic by motorable embedded lights, highlight ramps by wall embedded lights,
Page 24 of 29

Signature of Contractor NBCC

Digitally signed by ANUJ


NAVNEET CHACHA
Date: 2023.04.11 16:20:50 IST
Development of Hari Nagar Colony at New Delhi for DTC on Design, Engineering, Procurement &
Construction (EPC)

“Scope of Work”

highlight traffic directions by corner / curved street markings. There will be green planters
that will have sufficient bollards
/ Planters ground embedded lights to showcase the greenery in the evenings. Street light
with LED Solar light, land scape light, all signage as per Drawing and Technical
Specification.

The design of lighting and fixture selection in these areas shall harmonize with the
landscape

Ornamental and pole-mounted light fixtures are to be appropriately scaled for each
landscape situation. Alternates to pole lighting shall be considered to provide ambient and
pathway lighting.

Accent lighting must be located to avoid viewing bright sources from buildings and public
areas.

Pavement lights to be selected and spaced to provide even illumination. Intersections,


crossings, steps and ramps to be adequately illuminated for safety.

Provide adequate lighting and fixture selection for all directional, location and safety
signage.

EPABX Telephone/Intercom System:

The Scope of work of the Contractor shall be as under:-

Designing the system based on DBR & obtain NBCC approval

Detailed Designing and preparation of Shop drawings and its approval from NBCC;

Supply, Fabrication, Construction, Installation and Commissioning.

For communication between guard room/Control room to dwelling units and between all
dwelling units.

Providing, installation, testing & commissioning of EPABX-Tel/Intercom system where it


has to be ensured that all areas have communication access.

CABLE TRAY (AS REQUIRED)

The Scope of work of the Contractor shall be as under:-

Detail design and preparation of drawings based on DBR;

Detailed Designing and preparation of Shop drawings and its approval from NBCC;

Supply, Fabrication, Construction, Installation and Commissioning.

These are suspended with cable tray systems used as a trunk service distribution &
Page 25 of 29

Signature of Contractor NBCC

Digitally signed by ANUJ


NAVNEET CHACHA
Date: 2023.04.11 16:20:50 IST
Development of Hari Nagar Colony at New Delhi for DTC on Design, Engineering, Procurement &
Construction (EPC)

“Scope of Work”

mounting integrated Tray. These will carry electrical supply, LV cables, CCTV, Digital
lighting cable etc. in separate compartments & will be suspended as boxed / closed cable
trays from the ceiling / beam above. Typically, these will also have light, CCTV Camera,
& Signage fixtures suspended / surface mounted on the bottom of these trays.

SIGNAGE SYSTEMS FOR TOWERS

The Scope of work of the Contractor shall be as under:-

Detail design and preparation of drawings based on DBR;

Detailed Designing and preparation of Shop drawings and its approval from NBCC;

Supply, Fabrication, Construction, Installation and Commissioning.


The scope of work for the contractor would be to design non-digital and digital signage
system to achieve an effective way finding scheme both for internal roads and residential
towers, as well as for all indoor common areas like Lift Lobbies, Letter box, Lift Exits, Fire
Staircase, Service rooms etc.

FTTH (FIBRE TO THE HOME)

a) Detail design and preparation of drawings based on DBR;

b) Detailed Designing with Shop drawing & obtaining NBCC approval

c) Supply, Fabrication, Construction, Installation and Commissioning.

d) Obtaining Statutory & NBCC approval of Commissioning.

Fibre To The Home – complete Active & Passive works for Data/Wifi/ Tel/TV
including OFC, OLT, ODN, ONT, Cat6 cabling etc for all apartments.

External Services Layout, Distribution &Miscellaneous

i) Detailed Design, Installation, testing and commissioning of rain water


harvesting system including rechargeable and tube wells, water supply
system, sewerage system and drainage system as per Drawing and
Technical Specification.

ii) Detailed design, Supply and Installation of pumps and construction of


underground water tanks and overhead tanks as per Drawing and
Technical Specification

iii) Detailed design, Providing and laying/fixing cabling from the main receiving
station, rising main, meter, electrical panel etc. as per Drawing and
Technical Specification

iv) Detailed designing, Providing and fixing Street light with LED solar light,
land scape light, all signage as per Drawing and Technical Specification.
Page 26 of 29

Signature of Contractor NBCC

Digitally signed by ANUJ


NAVNEET CHACHA
Date: 2023.04.11 16:20:50 IST
Development of Hari Nagar Colony at New Delhi for DTC on Design, Engineering, Procurement &
Construction (EPC)

“Scope of Work”

v) Detailed design and Construction of Internal Roads, Berms, Pathways,


Kerbs, open parking space etc. including connecting with the external road
network as per Drawing and Technical Specification.

vi) Detailed design and Construction of Gate, M.S. Grills etc. as per Drawing
and Technical Specification.

vii) Detailed design and Construction of Service ducts for electrical, water
supply etc. as per Drawing and Technical Specification.

viii) Detailed design, Testing &Commissioning of complete installation after


Service Connection/tapping of the water supply, sewerage, drainage,
electricity etc. to the main/municipal system by executing agency.

Gas Supply

Gas supply to be in exposed pipes at building façade and in HDPE/RCC pipes


in Ground up to the location as indicated on drawings terminating in a stop cock
(provided by gas vendor). The gas supply system shall include gas leakage
detectors for safety reasons. Each termination of gas point shall be provided
with a pressure reducing valve by gas vendor to kitchen equipment operating
requirements. Emergency gas stop valve is required at all kitchens.

HORTICULTURE WORKS

i) Complete maintenance of the entire garden features of the garden area i.e.
lawn, trees, shrubs, hedge, potted plants, flowers beds, creepers etc. and other
garden feature including watering hoeing, making of plants basic manuring,
trimming and cleaning of hedges / plants, Beds, spraying of insecticides,
fungicides, weeding, mowing, and top dressing of lawn with good
earth and manure and hedge clipping and removal of the garden waste,
composting of green waste from plants, trees, lawn mowing, etc. as per
direction and satisfaction of the officer-in-charge to maintain the plants, hedge
and lawns in good and healthy conditions at all the time during the
maintenance period (12 month) (Defect Liability Period)

ii) The following activities are covered under this contract:-

S. Item of work Nos./Qty./Frequency Required


No.
(i) Pruning & trimming of trees/ Yearly/need base with the
shrubs creepers etc. permission of forest department
(ii) Hedges Cutting Monthly
(iii) Any other item On need basis
(Horticulture, Civil, Elect, U/F
water supply) required for proper
maintenance
(iv) Irrigation Daily

Page 27 of 29

Signature of Contractor NBCC

Digitally signed by ANUJ


NAVNEET CHACHA
Date: 2023.04.11 16:20:50 IST
Development of Hari Nagar Colony at New Delhi for DTC on Design, Engineering, Procurement &
Construction (EPC)

“Scope of Work”

(v) (i) Manuring Once in a year


(ii) Fertilization In winter
In summer and rainy season
As per requirement
(vi) Lawn Mowing Monthly
(vii) Plant Protection Need Based
(viii) Cultivation & Weeding As and when required
(ix) Seasonal Flowers Wherever feasible
(x) Top dressing with soil &/or Yearly
manure
(xi) Repair & replacement of plants, As and when required
leveling etc.
(xii) Annual Tree Plantation under Once in a year
Van Mahotsav Program (in monsoon)

iii) Sufficient number of Mali are to be deployed as per the requirement.


iv) The following conditions shall be followed:-
a) In case of any causality of shrubs, trees or any other plants is found
during maintenance the Agency should replace the trees/ shrubs/ other
plants of the same height and specification by another at his risk and
cost. The agency shall be liable for the penalty/punitive, if any,
levied/imposed by the Forest Department. However, the decision of
NBCC shall be final and binding in this regard.
b) In case, if it is observed that the maintenance is not healthy and to the
required standard, no payment shall be made of the specific area for
the period over which the maintenance has been found to be
neglected. The decision of NBCC shall be final and binding in this
regard.
c) The required quantity of insecticides/pesticides will be arranged by the
agency for proper maintenance (only during the maintenance period) if
needed.
d) The rejected & substandard material should be removed from the site
of work immediately; NBCC shall not be responsible for any damage/
loss of rejected material.

ART WORKS

Supply, installation and commissioning of artworks in the form of sculptures, water


features, wall art works on the facade, as per the Concept and Final Approval by the
Delhi Urban Arts Commission (DUAC) and as per the direction of the Engineer-in-
Charge.
The scope of work for the contractor would be to design the artworks to achieve the
desired objectives of the DUAC. The Contractor shall have to submit shop drawings
from the art work suppliers for the approval of the Architect.

Page 28 of 29

Signature of Contractor NBCC

Digitally signed by ANUJ


NAVNEET CHACHA
Date: 2023.04.11 16:20:50 IST
Development of Hari Nagar Colony at New Delhi for DTC on Design, Engineering, Procurement &
Construction (EPC)

“Scope of Work”

Exclusions to Work

The following works are not in the scope of work of contractor. In case of contravention
of stipulation of this clause from any other clause/provision elsewhere in the tender
document, then this clause shall have superseding effect to the extent of contravention.

1. Statutory fee for all approvals / permissions / services connections.

Page 29 of 29

Signature of Contractor NBCC

Digitally signed by ANUJ


NAVNEET CHACHA
Date: 2023.04.11 16:20:50 IST