Part 3: Equipments / Tools to be used: Crane, Rigging accessories & Hand Tools
Part 4: Contingency Plans. Standard PPE’s: First aid kit must be present at work site and the HSE personnel will be the first response in case of
emergency, ERPs & Emergency contact numbers to be in placed at job location
Part 5:JSA Review Process. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? In
case of any new hazard indentified by any of the working team member during the job, JSA review process should be carried on.
JSA No: JOB TITLE: Unloading and storage of DAHU and EF Unit.
Step# Describe Job Step Potential Hazards Hazard Controls
1 Mobilization of equipment & Involvement of unskilled personnel Trained & skilled staff to be authorized for
Materials job
Unauthorised/ uninspected
Obtain relevant permit before
equipment/tools at site
vehicle/equipment entry in the area
Personnel/Structures hit by
Ensure use of appropriate PPE’s on site
Equipment/Heavy Vehicle
JSA Briefing to all of workforce involved
Damaging to drains/culverts beside
roads Deliver tool box talk to all of vehicles
drivers & operators
Striking of vehicles with
structure/overhead live lines Banks man should be available at site
Be careful about nearby drains/culverts
Personnel injury / property damage
while vehicle movement on roads
Keep away all unauthorized people during
movement of heavy vehicle/equipments
Do not left un attendant any of
equipment/tool in the area
Ensure Close HSE monitoring
/supervision
Flame arrestor to be installed in vehicles
2 Unloading of DAHU and EF Unit. Uncertified Crane & Operator, Crane & its operator should be certified
Personnel hit by movement of crane Banks man/signal man should be available
Unbalancing of out riggers at site to control the movement of heavy
Unauthorized personnel involvement vehicles/equipments
Place crane at levelled & compacted
ground surface
Keep away all unauthorized people during
movement of heavy vehicle/equipments
Ensure Close HSE monitoring
/supervision
JSA No: JOB TITLE: Unloading and storage of DAHU and EF Unit.
Step# Describe Job Step Potential Hazards Hazard Controls
Sling broken, load drop Ensure proper & inspected
Miscommunication/signal error accessories being used for lifting
operation
Ensure that load is properly placed &
lifted
Ensure proper communication
between rigger/signal man & operator
Keep away during crane operation
Swing area should properly barricaded
Slip, Trip & fall Ensure proper stacking of all materials
at site
Keep access/walk ways always clear from
any obstruction
Ensure proper housekeeping of workplace
all the time
Inclement weather condition Stop crane work in case of any inclement
weather conditions (Rain, storm, fog etc.)
Restrict movement of heavy
vehicles/equipments in rain/fog
Fire & explosion Ensure availability of inspected fire
extinguishers at site
Flame arrestor to be installed in all
vehicles/equipments
3 Storage of DAHU and EF Unit. Personnel hand injury while handling Ensure Involvement of skilled labour
with units, Ensure use of proper PPE’s
People under suspended load, Deliver TBT before commencing work
Unbalancing of load while holding it Ensure use of inspected & colour
coded hand tools & rigging accessories
Area should be properly barricaded during
lifting operations
Restrict unauthorized movement
JSA No: JOB TITLE: Unloading and storage of DAHU and EF Unit.
Step# Describe Job Step Potential Hazards Hazard Controls
Improper signalling during lowering of Ensure proper communication between
units. rigger/signal man & operator
Rigger/signal man should wear vest
Inappropriate PPE’s/Tools Use of appropriate PPE’s during unloading
Ensure use of inspected tools for the right
job
Use tag line to control the load
Personnel impact injury
Availability of fresh water at site
First aid box should be in place at site
4 Working at night shift hours Poor visibility at night hours Ensure proper lighting arrangement for
late night working hours
Vehicles/equipments hit with people, Careful movement of vehicles in night
equipment or structure hours
Place refection tapes at hard barriers,
structures
Banks men should worn high visibility
reflection vests
Slip , trip & fall No working should be allowed in poor
lighting conditions
Ensure proper housekeeping to avoid
tripping