You are on page 1of 4

12/16/23, 4:03 PM about:blank

EMPLOYEE NAME: Hassan


POSITION:EO3
Abdulateef, Sabah

SKILL TYPE Practical and Maintenance Skills


Task
Skill Requirement Task Detail Task 2 Task 3 Task 4 Task 5
1
CT BOP Identify main componenets of BOP
CT BOP Explain function of each BOP Ram
CT BOP Identify different type of BOP
CT BOP Redress BOP/replace front insert/rear seal
CT BOP Identify BOP control valve
Stripper Identify main component and functions of Stripper
Stripper Explain different type of striper
Stripper Replace stripper insert
Stripper Replace upper/lower bushing
Identify/explain back up traction and BOP system
Stripper
control
Injector head Identify main components of injector head
Injector head Explain different type of injector head
Injector head Identify injector head control system
Injector head Adjust gooseneck alignment
Injector head Perform SM1 on injector head
Injector head Perform SM2 on injector head
Injector head Chain Explain main component of injector head chain
Injector head Chain Identify/ecplain injector chain tension system
Injector head Chain Perform injector head pull test
Injector head Chain Inspect and measure chain elongation
CT Control cabin/Powerpack Identify control valves on panel for all hyd circuits
CT Control cabin/Powerpack Identify main component of powerpack
CT Control cabin/Powerpack Explain different type of CT hydraulic circuit and WP
CT Control cabin/Powerpack Perform SM1
CT Control cabin/Powerpack Perform SM2
CT Reel Identify main components of CT Reel
CT Reel explain function of each component
CT Reel Adjust levelwind clutch
CT Reel Replace levelwind yoke
CT Reel Redress reel swivel packing
CT Reel Perform complete SM1
about:blank 1/4
12/16/23, 4:03 PM about:blank

CT Reel Perform complete SM2


CT MHA Identify maincomponents of MHA
CT MHA Redress check valves
CT MHA Redress MHA
CT MHA Set shear screw
Service maintenance (SM1/SM2) Prepare SM1/SM2 forms
Service maintenance (SM1/SM2) Perform SM1 on injector head
Service maintenance (SM1/SM2) Perform SM1 on BOP
Service maintenance (SM1/SM2) Perform SM1 on CT reel
Service maintenance (SM1/SM2) Perform SM1 on powerpack & control cabin
CT Connector Identify different type of connectors
CT Connector Explain advantage /disadvantage of each connector
CT Connector Prepare and make up Roll on connector
CT Connector Prepare and make up dimple connector
CT Connector Perform connector pull test
Orion Data Acquisition Identify main component of Orion
Orion Data Acquisition Identy/explain different sensor type
Orion Data Acquisition Connect / make up sensor to Orion box
Orion Data Acquisition Calibrate sensor (K factor)
SKILL TYPE Operating/Technical Skills and Project
Task
Skill Requirement Task Detail Task 2 Task 3 Task 4 Task 5
1
SOP Implementation Review CT equipment rig up SOP
SOP Implementation Review PCE function test/pressure SOP
SOP Implementation Implement PCE function test/pressure test SOP
SOP Implementation Implement CT rig up SOP
CT Operating Rig up CT equipment as per SOP
CT Operating Stab CT pipe
CT Operating Spool CT
CT Operating Function test PCE Equipment as per SOP
CT Operating Perform BHA Pull test
CT Operating Operate CT with suitable setting parameters as per SOP
Pipe management Review pipe management SOP
Pipe management Implement CT pipe manage procedure
Pipe management Drift CT pipe with steel ball/dart
Pipe management Neutralize CT pipe wit soda ash/post acid
Pipe management Apply external/internal corrosion inhibitor oin CT pipe
CT Operating Limits Explain CT operating limts envelop
CT Operating Limits Setup Orion to monitor CT limits real time
CT Operating Limits Identify max load/burst/collapse limits for CT pipe
CT fatigue Explain parameters affect CT fatigue

about:blank 2/4
12/16/23, 4:03 PM about:blank

CT fatigue Setup Orion to monitor/record CT fatigue in real time


CT fatigue Minimize CT pipe cycle under high pressure
CT fatigue Explain CT fatigue plot
Pressure Control equipment Review PCE function/pressure test SOP
Pressure Control equipment Perform BOP function test
Pressure Control equipment Perform accumulator function test
Pressure Control equipment Rig up PCE equipment
Pressure Control equipment Calculate PT1 and PT2 values
Pressure Control equipment Perform PT1 pressure test
Pressure Control equipment Function test equalizing valve
Pressure Control equipment Perform PT-2 pressure test
Job Package Prepare job package
Job Package Complete PTW
Job Package Complete JSA
Job Package Complete Lifting Plan
Job Package Complete prejob check list
Job Package Conduct prejob meeting
Data Acquisition Rig up Orion
Data Acquisition Operate Orion to monitor and record job parameters
Data Acquisition Prepare Orion post job report
Data Acquisition Edit/add message
Data Acquisition Set up alarm for job parameters
CT Stimulation Operate CT for Stimulation job
CT Milling Operate CT for milling job
SKILL TYPE Learning Course and Certifications
Task
Skill Requirement Task Detail Task 2 Task 3 Task 4 Task 5
1
CT Basic Attend and pass 70% of CT Basic
Review and pass 70 percent of CT Contingency
CT Contingency
certification
CT Services Standard Pass 70% of CT Services Standard
N2 Pumping Course Attended and pass 70% of N2 Pumping Course
Basic Pumping Course Attend and Pass 70% Basic Pumping course
S.A.F.E Attend S.A.F.E training
H2S Attend H2S training
First Aid Attend First Aid Training
SHL Attend Stepping Handling and lifting
Dropped Object Attend Dropped Object Training
Pressure and Pressure test Complete assessment Pressure and Pressure test
SKILL TYPE Standalone
Task
Skill Requirement Task Detail Task 2 Task 3 Task 4 Task 5
1

about:blank 3/4
12/16/23, 4:03 PM about:blank

Coiled Tubing operation Stand alone in CT operation


Coiled Tubing operation Complete CT operating assessment
Coiled Tubing operation Standalone in CT Stimulation (operating)
Coiled Tubing operation Standalone in CT milling (operating)
Coiled Tubing operation Standalone in CT Cementing (operating)
Coiled Tubing operation Standalone in CT fishing (operating)
Coiled Tubing operation Prepare CT equipment for operations
Coiled Tubing operation Complete SM1 and SM2 as per SOP
Equipment Maintenance Standalone in SM1 equipment maintenance
Equipment Maintenance Standalone in SM2 BOP maintenance
Equipment Maintenance Standalone in SM2 Injector head maintenance
Equipment Maintenance Standalone in SM2 CT reel maintenance
Equipment Maintenance Standalone in SM2 powerpack maintenance
Equipment Maintenance Stanalone in MHA maintenance/redress
Job package Complete job packages
Job package Conduct prejob meeting
Job package Perform JSA
Field assessment Complete Field assessment
Evidence of tasks and records Submit evidence of tasks and records

about:blank 4/4

You might also like