You are on page 1of 9

RU-546

N2 Lifting & PLT operation.


Date: From 14-Dec-23 to 20-Dec-23

Ru-546
Pumping Service
End of Well Report

SOR No / 27051

N2 Lifting & PLT operation

OiLTECH
SIU-CSC-N2P

Prepared by: Lolav Majeed


WS Final Intervention Report Template Checked by: Ali Jassem
Date: 26-Dec-23
ROO- Wells-WS-TEM-167-A0 Approved by: Haroon Allawi
RU-546
N2 Lifting & PLT operation.
Date: From 14-Dec-23 to 20-Dec-23

Contents
1. EXECUTIVE SUMMARY:..................................................................................................................3
1.1 HS&E INCIDENTS....................................................................................................................3
1.2 WELL HISTORY AND OBJECTIVE:.............................................................................................3
1.3 INTERVENTION OUTCOME AND JOB CHARTS........................................................................4
1.4 HIGHLIGHTS:...........................................................................................................................5
1.5 LOWLIGHTS:...........................................................................................................................5
1.6 LESSONS LEARNED.................................................................................................................5
1.7 MANAGEMENT OF CHANGE / DISPENSATION........................................................................5
2. INTERVENTION INFORMATION......................................................................................................5
2.1 INTERVENTION DATA.............................................................................................................5
2.2 DAILY OPERATIONS SUMMARY:.............................................................................................6
3. WELL SCHEMATIC...........................................................................................................................7
4. CHEMICAL (MATERIAL) CONSUMPTION...........................................Error! Bookmark not defined.

Prepared by: Lolav Majeed


WS Final Intervention Report Template Checked by: Ali Jassem
Date: 26-Dec-23
ROO- Wells-WS-TEM-167-A0 Approved by: Haroon Allawi
RU-546
N2 Lifting & PLT operation.
Date: From 14-Dec-23 to 20-Dec-23

1. EXECUTIVE SUMMARY:
1.1 HS&E INCIDENTS:
 There were zero HSE incidents during this intervention.

1.2 WELL HISTORY AND OBJECTIVE:


N/A

The objective of this program is to:

The objective is to perform PLT logging after kicking off the well by performing N2 Pumping (lifting)
via reverse or forward circulation (Based on the SOR or MOC requirement) for the wells that
cannot sustain natural flow. The data will assist subsurface in identifying future well work
opportunities on the selected wells.

KEY SOR OBJECTIVES:

Achieved Comments
Objective
(Yes/No) (Why objective not achieved?)
Main Objective Yes
Other N/A

Prepared by: Lolav Majeed


WS Final Intervention Report Template Checked by: Ali Jassem
Date: 26-Dec-23
ROO- Wells-WS-TEM-167-A0 Approved by: Haroon Allawi
RU-546
N2 Lifting & PLT operation.
Date: From 14-Dec-23 to 20-Dec-23

1.3 INTERVENTION OUTCOME AND JOB CHARTS


 16-Dec-23, OT N2 PKG team take shut in well pressures, WHP= 110 psi, A ANN=1700 psi, B & C Ann = 0
psi
 17-Dec-23, OT N2 & Flareless PKG team cool down the N2 pump & commence pumping N2 with rate
500 scfm reverse circulation from Ann A and the well flow from TBG to the FB via separator. Then WL
the data accepted and POOH to Surface and stop pumping N2 after that OT crew Start Cooldown
andstarted pumping N2 at rate 500 scfm from Ann A and the well is lined from TBG to Flowback tanks
through separator , return Oil , finally OT crew stop pumping N2 TV pumped 4377 gallons and well is
flowing naturally from TBG to FB tanks , return Oil at surface.
 18-Dec-23, monitoring Flowing the well from TBG to DGS
 19-Dec-23, Finished all rig down and house keeping and proceeding with loading equipment

 JOB CHARTS

Prepared by: Lolav Majeed


WS Final Intervention Report Template Checked by: Ali Jassem
Date: 26-Dec-23
ROO- Wells-WS-TEM-167-A0 Approved by: Haroon Allawi
RU-546
N2 Lifting & PLT operation.
Date: From 14-Dec-23 to 20-Dec-23

1.4 HIGHLIGHTS:
 Job objectives not achieved successfully.

1.5 LOWLIGHTS:
 N/A

1.6 LESSONS LEARNED:


 Following the client’s program, OT SOPs, and reviewing ERP and MSDS is the best way to achieve
job objectives in a safe and timely manner.

1.7 MANAGEMENT OF CHANGE / DISPENSATION:


 N/A

2. INTERVENTION INFORMATION:
2.1 INTERVENTION DATA:
Wellhead Pressures
As Found: As Left: Flowing Parameters:
Well Status: Shut-in Shut-in
THP Unknown psi 229 psi Choke size 32/64 S.G water
A Ann 1590 psi 200 psi USP Salinity
B Ann 0 psi 0 psi DSP S.G oil
C Ann 0 psi 0 psi BSW Oil / 0% H2S

Well Integrity Details


Integrity items Status:
Xmas tree valves TBG, Ann A, B, and C is closed.
Wellhead valves
MIT Details

Prepared by: Lolav Majeed


WS Final Intervention Report Template Checked by: Ali Jassem
Date: 26-Dec-23
ROO- Wells-WS-TEM-167-A0 Approved by: Haroon Allawi
RU-546
N2 Lifting & PLT operation.
Date: From 14-Dec-23 to 20-Dec-23

2.2 DAILY OPERATIONS SUMMARY:


Date Daily Summary
14,15&16-Dec-
Pumping equipment and crew arrived location, spot equipment, rig up & pressure tested.
23
N2 Lift operation& N2 crew start pumping N2 at rate 2000 scfm reverse circulation from AnnA
16-Dec-23 and the well flow from TBG to the FB vie separator.

Continue pumping N2 at rate 500 scfm &WL the data accepted and POOH to Surface and stop
17-Dec-23
pumping N2

17&18-Dec-23 OT crew started pumping N2 at rate 500 scfm & monitoring Flowing the well from TBG to DGS

19-Dec-23 Rig down all equipment

20-Dec-23 Mobilizing the equipment to next wellsite.

Prepared by: Lolav Majeed


WS Final Intervention Report Template Checked by: Ali Jassem
Date: 26-Dec-23
ROO- Wells-WS-TEM-167-A0 Approved by: Haroon Allawi
RU-546
N2 Lifting & PLT operation.
Date: From 14-Dec-23 to 20-Dec-23

3. WELL SCHEMATIC

Prepared by: Lolav Majeed


WS Final Intervention Report Template Checked by: Ali Jassem
Date: 26-Dec-23
ROO- Wells-WS-TEM-167-A0 Approved by: Haroon Allawi
RU-546
N2 Lifting & PLT operation.
Date: From 14-Dec-23 to 20-Dec-23

Prepared by: Lolav Majeed


WS Final Intervention Report Template Checked by: Ali Jassem
Date: 26-Dec-23
ROO- Wells-WS-TEM-167-A0 Approved by: Haroon Allawi
RU-546
N2 Lifting & PLT operation.
Date: From 14-Dec-23 to 20-Dec-23

4. CHEMICAL CONSUMPTION (MATERIAL)

Prepared by: Lolav Majeed


WS Final Intervention Report Template Checked by: Ali Jassem
Date: 26-Dec-23
ROO- Wells-WS-TEM-167-A0 Approved by: Haroon Allawi