Ru-546
Pumping Service
End of Well Report
SOR No / 27051
OiLTECH
SIU-CSC-N2P
Contents
1. EXECUTIVE SUMMARY:..................................................................................................................3
1.1 HS&E INCIDENTS....................................................................................................................3
1.2 WELL HISTORY AND OBJECTIVE:.............................................................................................3
1.3 INTERVENTION OUTCOME AND JOB CHARTS........................................................................4
1.4 HIGHLIGHTS:...........................................................................................................................5
1.5 LOWLIGHTS:...........................................................................................................................5
1.6 LESSONS LEARNED.................................................................................................................5
1.7 MANAGEMENT OF CHANGE / DISPENSATION........................................................................5
2. INTERVENTION INFORMATION......................................................................................................5
2.1 INTERVENTION DATA.............................................................................................................5
2.2 DAILY OPERATIONS SUMMARY:.............................................................................................6
3. WELL SCHEMATIC...........................................................................................................................7
4. CHEMICAL (MATERIAL) CONSUMPTION...........................................Error! Bookmark not defined.
1. EXECUTIVE SUMMARY:
1.1 HS&E INCIDENTS:
There were zero HSE incidents during this intervention.
The objective is to perform PLT logging after kicking off the well by performing N2 Pumping (lifting)
via reverse or forward circulation (Based on the SOR or MOC requirement) for the wells that
cannot sustain natural flow. The data will assist subsurface in identifying future well work
opportunities on the selected wells.
Achieved Comments
Objective
(Yes/No) (Why objective not achieved?)
Main Objective Yes
Other N/A
JOB CHARTS
1.4 HIGHLIGHTS:
Job objectives not achieved successfully.
1.5 LOWLIGHTS:
N/A
2. INTERVENTION INFORMATION:
2.1 INTERVENTION DATA:
Wellhead Pressures
As Found: As Left: Flowing Parameters:
Well Status: Shut-in Shut-in
THP Unknown psi 229 psi Choke size 32/64 S.G water
A Ann 1590 psi 200 psi USP Salinity
B Ann 0 psi 0 psi DSP S.G oil
C Ann 0 psi 0 psi BSW Oil / 0% H2S
Continue pumping N2 at rate 500 scfm &WL the data accepted and POOH to Surface and stop
17-Dec-23
pumping N2
17&18-Dec-23 OT crew started pumping N2 at rate 500 scfm & monitoring Flowing the well from TBG to DGS