You are on page 1of 10

Ru-216

CT - N2 Lifting
Date: From 7-Jan-24 to 11-Jan-24

R-216
Pumping Service
End of Well Report

SOR No./28231
CT - N2 Lifting

OiLTECH
SIU-CTS-ROO-C-60032

Prepared by: Ali Saeed


WS Final Intervention Report Template
Date: 24-Jan-23 Checked by: Lolav Majeed
ROO- Wells-WS-TEM-167-A0
Approved by: Haroon Allawi
Ru-216
CT - N2 Lifting
Date: From 7-Jan-24 to 11-Jan-24

Contents
1. EXECUTIVE SUMMARY: ...................................................................................................................3
1.1 HS&E INCIDENTS: ................................................................................................................... 3
1.2 OBJECTIVE: ............................................................................................................................. 3
1.3 WELL HISTORY AND OBJECTIVE: ............................................. Error! Bookmark not defined.
1.4 INTERVENTION OUTCOME: ....................................................................................................3
1.5 MANAGEMENT OF CHANGE / DISPENSATION: ..................................................................... 5
1.6 OTHER SERVICES INVLOVED IN ACHIEVING SOR OBJECTIVES ............................................... 5
2. INTERVENTION INFORMATION: ..................................................................................................... 5
2.1 INTERVENTION DATA: ............................................................................................................5
2.2 DAILY OPERATIONS SUMMARY: ............................................................................................ 6
2.3 Well Schematic: ..................................................................................................................... 7
2.4 BHA DETAILS: .......................................................................... Error! Bookmark not defined.
2.5 CHEMICAL (MATERIAL) CONSUMPTION: .............................................................................10

Prepared by: Ali Saeed


WS Final Intervention Report Template
Date: 24-Jan-23 Checked by: Lolav Majeed
ROO- Wells-WS-TEM-167-A0
Approved by: Haroon Allawi
Ru-216
CT - N2 Lifting
Date: From 7-Jan-24 to 11-Jan-24

1. EXECUTIVE SUMMARY:
1.1 HS&E INCIDENTS:
 There were zero HSE incidents during this intervention.

1.2 OBJECTIVE:
 To put the ceased well back online through flow back and contingency nitrogen lifting via
coiled tubing

 KEY SOR OBJECTIVES:

Achieved Comments
Objective
(Yes/No) (Why objective not achieved?)
Main Objective Yes
Lifting Yes
Other N/A

1.3 INTERVENTION OUTCOME:


 7-Jan-24:
- OT team relocated to the site, commenced rig up, and conducted pressure testing.

 8-Jan-24:
- Continued rigging up and conducted the weekly pressure test for BOP (300-5000 Psi) along with the Pull Test
CT Connector (15 K).
- Completed BOP and Pull tests, confirming all systems are in good condition and ready for operations.

Pressure Testing and Well Status:


 Executed pressure tests for all equipment (Flare line, Inlet SP line, DS, US, SSV) for 5 minutes each,
following the Standard Operating Procedure (SOP). Well was opened and shut-in, with TBG at 0 psi
and A Ann= 10psi and B, C Ann at 0 psi.

CT Operations and Pumping N2:

 Unloaded tubing by initiating CT RIH, started pumping N2 at 2220m with a flow rate of 300 SCFM. Well was
lined up from TBG to FL tanks via SP, with no return at the surface and WHP =50 , Tubing P = 168 psi and
Circulation pressure = 2220 psi
 CT reached a depth of 2220m with a pumping rate of 300 SCFM and gradually increase pumping rate to
400scf/m as ROO WSL Coordinator instruction, observing ONLY GAS return at the surface .
 While pumping N2 at a rate of 400 SCFM, the coiled tubing (CT) was parked at a depth of 2220m, with the
well lined up from Tubing Head (TBG) to Flow Back (FB) through the Separator. Subsequently, the flow
was diverted from TBG to A Ann, and the N2 rate was increased to 500 SCFM as instructed by the
coordinator.

Prepared by: Ali Saeed


WS Final Intervention Report Template
Date: 24-Jan-23 Checked by: Lolav Majeed
ROO- Wells-WS-TEM-167-A0
Approved by: Haroon Allawi
Ru-216
CT - N2 Lifting
Date: From 7-Jan-24 to 11-Jan-24

 9-jun-24
 pumping N2 at a rate of 500 SCF/min, the coiled tubing was parked at a depth of 2220m, with the well
flowing from A.Ann to FB tanks via the separator. At the surface, the liquid and gas content indicated
an emulsion of 12%, CO2 level of 1.5%, H2S concentration of 1200 ppm, and a liquid rate per hour of
90 bbl.

 10-jun-24

 On 10th June 2024, coiled tubing (CT) was pulled out of the hole to the surface while pumping N2 at a
rate of 500 SCFM. Liquid and gas were returned during this process. Pumping of N2 was stopped
before reaching the end of the tubing, and the pull-out-of-hole (POOH) operation was continued to
flow back the well.
 Upon reaching the surface, instructions were received from the coordinator to divert the well to the
DGS with a chock size of 32/64 .

 11-jun-24
Rig Down Instruction and Crew Activity:
 Received instruction from ROO WSC to commence rig down the equipment.
 OT crew held a TBT with all crew members for flushing and rig down.
 - Continue R/D and move to next well

1.4 JOB CHART

Prepared by: Ali Saeed


WS Final Intervention Report Template
Date: 24-Jan-23 Checked by: Lolav Majeed
ROO- Wells-WS-TEM-167-A0
Approved by: Haroon Allawi
Ru-216
CT - N2 Lifting
Date: From 7-Jan-24 to 11-Jan-24

1.5 MANAGEMENT OF CHANGE / DISPENSATION:


 N/A
1.6 OTHER SERVICES INVLOVED IN ACHIEVING SOR OBJECTIVES
Date Service Service provider Details/Comments

2. INTERVENTION INFORMATION:
2.1 INTERVENTION DATA:
Wellbore Clearance Fish left in hole:
Depth OD: Details of BHA left in hole: Depth OD
HUD 2309.33 m 7”
EOT 2166 m 3.5”
Depth ID:
Restriction 2.66”

Zonal Isolation (Cement Squeeze) Details


Reservoir isolated Top Bottom Cement Type Fluid Loss Leak off test result
N/A

Zonal Isolation (Mech Plug/Cement Plug) Details


Reservoir isolated Top Bottom Plug Type Plug depth Plug tagged/ MIT results
N/A

Perforating Details
Reservoir Top Bottom Thickness Gun type Gun SPF Double Perfs
size
Mishrif 2247 2301 N/A N/A 1 11/16 4

Stimulation Details
Stimulation Type Fluid type Rate Pressure Comment
NA

Logging Details
Logging Type Bottom Top Interpretation summary (Comment)

Prepared by: Ali Saeed


WS Final Intervention Report Template
Date: 24-Jan-23 Checked by: Lolav Majeed
ROO- Wells-WS-TEM-167-A0
Approved by: Haroon Allawi
Ru-216
CT - N2 Lifting
Date: From 7-Jan-24 to 11-Jan-24

Wellhead Pressures
As Found: As Left: Flowing Parameters:
Well Status: Shut-in Shut-in
THP 0 psi 1125 psi Choke size 32/64" S.G water 1.013
A Ann 10 psi 360 psi USP 360 Salinity 90%
140
B Ann 0 psi 0 psi DSP S.G oil N/A

C Ann 0 psi 0 psi BSW 2% H2S 0

Well Integrity Details


Integrity items Status:
Xmas tree valves TBG closed, Ann A closed, Ann B & C are closed.
Wellhead valves
MIT Details

2.2 DAILY OPERATIONS SUMMARY:

Date Daily Summary

10-Jan-24 Spot equipment & rig up & pressure test

11-Jan-24 Continue Rig up and Pressure Test, CT purge , RIH for N2 lift

12-jan-24 N2 lift operation, POOH to surface, monitor the well , Rig Down

13-Jan-24 Rig Down and Mobilzation

Prepared by: Ali Saeed


WS Final Intervention Report Template
Date: 24-Jan-23 Checked by: Lolav Majeed
ROO- Wells-WS-TEM-167-A0
Approved by: Haroon Allawi
Ru-216
CT - N2 Lifting
Date: From 7-Jan-24 to 11-Jan-24

2.3 Well Schematic:

Prepared by: Ali Saeed


WS Final Intervention Report Template
Date: 24-Jan-23 Checked by: Lolav Majeed
ROO- Wells-WS-TEM-167-A0
Approved by: Haroon Allawi
Ru-216
CT - N2 Lifting
Date: From 7-Jan-24 to 11-Jan-24

Prepared by: Ali Saeed


WS Final Intervention Report Template
Date: 24-Jan-23 Checked by: Lolav Majeed
ROO- Wells-WS-TEM-167-A0
Approved by: Haroon Allawi
Ru-216
CT - N2 Lifting
Date: From 7-Jan-24 to 11-Jan-24

2.4 BHA Details

Prepared by: Ali Saeed


WS Final Intervention Report Template
Date: 24-Jan-23 Checked by: Lolav Majeed
ROO- Wells-WS-TEM-167-A0
Approved by: Haroon Allawi
Ru-216
CT - N2 Lifting
Date: From 7-Jan-24 to 11-Jan-24

2.5 CHEMICAL (MATERIAL) CONSUMPTION:

Prepared by: Ali Saeed


WS Final Intervention Report Template
Date: 24-Jan-23 Checked by: Lolav Majeed
ROO- Wells-WS-TEM-167-A0
Approved by: Haroon Allawi