Shop Drawings and Coordination Overview as of 23th of November

tio e
By
TGC ECG Hard Precast Royal Advance
Ac yp
n
T
lla
Vi

1- Roof MEP
1- The Precast Drawings have
1- To Provide Service Blocks Coordination drawings
been approved by the Third
Structural design as Cast In Situ have been submitted
Party. 2-
1- Roof Slab Shop drawings Reinforced Concrete. 22-NOV on 15th of November
Precast Boundary Wall Shop
T2 to be submitted on (Received 23rd - NOV)
drawings were commented
to Hard Precast for
24/11/2023 2- To Provide Site Layout for all their review and
by ECG and Sent to Hard
Service Blocks 22-NOV Coordination. (Still
Precast to revise them on 22-
(Received 23rd - NOV) Pending with Hard
NOV.
Precast)

1- To Provide Service Blocks


1- Architectural Revised Revit
Structural design as Cast In Situ
Model have been issued by 1-Awaiting the
Reinforced Concrete.(Received
ECG on 15th of November Approval of T22
1- To revise the Foundation 23rd - NOV)
and the precast drawings are Builders Work
and Plinth Wall Shop 2- To Provide Site Layout for all
being revised since then. To drawings from ECG in
T22 drawings based on the final Service Blocks. (Received 23rd -
be submitted on 24-NOV order to forward them
precast drawings. 24th of NOV)
2- Precast Boundary Wall to Hard Precast to be
Nov. 3- To Provide a revised IFC in
Shop drawings will be considered in their
accordance with the latest
submitted on 27th of design.
comments received on the
November (Not Submitted)
Staircase on 22-NOV
1- Ground Floor panels
Coordination have been
done. 7 Panels to be revised
1- To Provide Service Blocks
1- To coordinate with Royal by Royal advance and 5
Structural design as Cast In Situ
Advance and Hard Precast panels are on hold awaiting 1- Ground Floor panels
Reinforced Concrete. (Received
to complete the first floor the final ID Drawings. Coordination have
23rd - NOV) 2-
slabs and beams 2- A clash of the Ceiling and been done. 7 Panels to
To Provide Site Layout for all
V2G Coordination drawings. To
Service Blocks. (Received 23rd -
3.0 Delta beams has been be revised by Royal
be Completed on 17th Nov. resolved on the First Floor. advance and 5 panels
NOV)
for the beams and 22rd Submitted on 23-NOV to ECG are on hold awaiting
3- Slab on Grade Shop Drawings
Nov. for the panels. (Done for Approval the final ID Drawings.
have been approved on 15th of
on 22nd of NOV) 3- Precast Boundary Wall
November
Shop drawings will be
submitted on 27th of
November. (Not Submitted)
1- To Provide Service Blocks
1- To coordinate with Royal Structural design as Cast In Situ
Advance and Hard Precast Reinforced Concrete. (Received 1- Precast Drawings will be
to complete the Plinth Wall 23rd - NOV) submitted on November
Coordination drawings and 2- To Provide Site Layout for all 27th. (Comments received 1- MEP Coordination is
Builders Work. Service Blocks. (Received 23rd - from ECG on 20th of awaiting the final
2- To submit the Slab on NOV) November and drawings precast drawings and
V2GN Grade Shop drawings 3- Precast Drawings has to be have to be revised by HP) the approval of
according to the latest reviewed by ECG once issued 2-Precast Boundary Wall foundation shop
Architecural Model and from Hard Precast. Shop drawings will be drawings
Precast Drawings after the 4- The Foundation Shop submitted on 27th of
approval of the foundation drawings will be released once November. (Not Submitted)
shop drawings. the precast drawings are
reviewed and approved
Villa Type
Summary of Foundation Works - TG 2137
Raft - Cast 1 - 10th of OCT 2023
T2 Raft - Cast 2 - 11th of OCT 2023
Plinth - Cast - 27th of OCT 2023
ON HOLD DUE TO STAIRCASE AND
ELEVATOR DESIGN MODIFICATION.
T22
(FOUNDATION SHOP DRAWINGS WERE
APPROVED ON 30th OCT 2023.
Raft - Cast 1 - 13th of OCT 2023
Raft - Cast 2 - 14th of OCT 2023
V2G Raft - Cast 3 - 15th of OCT 2023
Raft - Cast 4 - 16th of OCT 2023
Plinth - Cast - 24th of OCT 2023
REDSIGN OF RAFT AND PLINTH WALLS
IS REQUIRED DUE TO FAÇADE DESIGN
V2GN
MODIFICATION RECEIVED FROM THE
CLIENT ON 15th NOV 2023