Document kind Document identity Revision

Service instruction SC-I 020.10.36 B


Owner organization Document type Date of revision (yyyy-mm-dd) Status Page(s)

Motors & Generators Control points before reassembling 2013-10-18 Valid 1(1)
for induction machines
Division/Department Prepared by Approved by Security level

PG Service Bengt Stehagen PO Johansson Internal limited

Control phase
Control before reassembling

No. Component / Control point Point Control of Document

1 Machine with details and a All parts are available, not Work report
accessories damaged and ready for and planning
reassembling system

Rev. Date Prepared by Division/ Department Description


(yyyy-mm-dd)
A 2012-09-12 BS PG Service First version
B 2013-10-18 BS PG Service Changed AC machine to induction machine in heading