You are on page 1of 1

Construction of Qurayyah Combine Cycle Power Plant Project- C

DESCIPLINE: ELECTRICAL ITP NO.: 30621127-000-GIP-00036


INSPECTION & TEST PLAN FOR SITE SUBCON: REV. NO.: 005
DESCRIPTION: ELECTRICAL WORKS PAGE: 12 OF 15 RFI No.:

APPLICABLE INSPECTION LEVEL


REPORTING
STANDARD, BEMCO SEC
ACTIVITY ITEM NO. TEST AND INSPECTION ACTIVITY FORMAT/
SPECIFICATION OR
CHECKLIST CONST. QA/QC INITIAL SEC INITIAL
PROCEDURE

F TRANSFORMERS

30621127-000-4QC-
1 DRY TYPE TRANSFORMER INSTALLATION PTS 7.10 H W W
53

IMPACT RECORDER REMOVAL & 30621127-000-4QC-


2 PTS 7.10 H W W
PRESSURE CHECK FOR TANK 54.1

SET IN PLACE OF TRANSFORMER 30621127-000-4QC-


3 PTS 7.10
7 10 H W W
(A li bl if the
(Applicable th connection
ti iis tto B
Bus D
Duct)
t) 54.3

LIQUID-FILLED TRANSFORMER 30621127-000-4QC-


4 PTS 7.10 H W W
INSTALLATION 54

TRANSFORMER PROTECTION PANELS /


30621127-000-4QC-
5 AVR PANELS, RTCC PANELS & INTERFACE PTS 7.10 H W W
54.2
PANELS INSTALLATION

NEUTRAL GROUNDING RESISTOR 30621127-000-4QC-


6 PTS 7.10 H W W
INSTALLATION 57.1

DRY TYPE TRANSFORMER TEST/PRE- 30621127-000-4QC-


7 PTS 10 & 11 H W W
COMMISSIONING 55

LIQUID-FILLED TRANSFORMER TEST/PRE- 30621127-000-4QC-


8 PTS 10 & 11 H W W
COMMISSIONING 56
TRANSFORMER AND ITS AUXILLARY
30621127-000-4QC-
9 EQUIPMENT / CONTROLS & PANELS PTS 10 & 11 H W W
56.1
TESTING
ENERGIZATION OF TRANSFORMER AND 30621127-000-4QC-
10 PTS 10 & 11 H H W
ITS AUXILLARY EQUIPMENT/CONTROLS 57

Prep : Masood A. Khan


LEGEND: R: REVIEW S: SURVEILLANCE W: WITNESS H: HOLD