You are on page 1of 4

Date

12/12/2023

12/13/2023

12/16/2023

12/19/2023

12/23/2023

12/26/2023

12/30/2023

12/31/2023

1/2/2024

1/3/2024

1/4/2024

1/5/2024

1/6/2024

1/8/2024

1/9/2024

1/10/2024

1/11/2024

1/12/2024
1/13/2024

1/14/2024

1/15/2024

1/16/2024

1/17/2024

1/18/2024

1/19/2024

1/20/2024

1/21/2024

1/22/2024

1/23/2024

1/24/2024

1/25/2024

1/26/2024

1/27/2024

1/28/2024

1/29/2024

1/30/2024

1/31/2024
Activity
Setting out electricity, drainage and water trenches at new site compound.

Setting out for container locations at new site compound.

Taking OGL at runway 0+000- 0+400

Taking the bore hole locations

CL Verification at the runway

Conducting a topographic survey of main road and auxillary adjacent roads existing utilities
and culverts

Verification of Akon international Airport project primary and secondary control points

Compiling and drafting drawings

Checking for both the sub-contractor and consultant level machine instrument errors.
Carrying out level line (first run) for bench marks heighting at site

Setting out of the AIA structures locations at the runway (presidential apron &
terminal,passenger apron &terminal, air traffic control tower & fire fighting)

Taking OGL (NEZ) along the runway centre line from Ch 0+900 to Ch 3+160

Carrying out a flyback (second run) for a level line for bench mark heighting at site.Site visit
to the River Divertion Area

Taking new borrow pit locations (NEZ) for the sand and clay materials at site

Measuring coordinates (NE) for the already established benchmarks on site