Safety Task Assignment-STA

TRS-HS-FRM-0002

Safety Task Assignment (STA)


Program/Project P-12 Foreman
Company CHEAC Date Date
Task Location New Camp Time
Task Description Electrical Work
Instruction
The STA is a team effort. Together, management/supervisors and employees:
 List steps for the task  Review and ensure that all personnel understand the STA
 Identify known and potential HSE hazards  Safely perform the task
 Determine work practices and equipment (including PPE) necessary to complete the
 Revise the STA when the task or conditions change
task safely
 Encourage participation in this process by all crew members  When the task is finished, complete the Post STA

STAs will be maintained in the work area throughout the duration of the task. Each crew member involved with the task will sign the STA prior to starting work and initial upon completion
of the task.

Emergency Procedures
Emergency No. 0112127111 Assembly Point Rest Area
Fire Extinguisher Location Multiple Places Eye Wash Location Rest Area
Fire Aid Location Rest Area Other N/A
Emergency Response
Implemented as per plan
plan/arrangement

Check all that apply


Life Crucial Operations
Aerial Lifts ✘ Electrical Work Loading/Unloading Material
Confined Space Entry Grating/Floor Plate/Guardrail Removal Working at Heights
Cranes/Lifting/Rigging Hazardous Energy Control Trenching/Excavation
Motorized Heavy Equipment/Human Machine Interface Line Break/Hot Tapping
Risk assessment using the JSA/Risk Assessment Form or equivalent has been completed prior starting work
Permits/Documents Required
Asbestos/Lead Grating/Floor Plate/Guardrail Removal Radiation Work
Break-In Hot Works Roof Work
Confined Space Entry Line Break/Hot Tapping Safety Data Sheet
Critical Crane Lift Live Electrical Work Scaffold
Excavation/Trenching Lockout/Tagout Signs/Barricades
Fall Protection Plan Overhead Power Lines Utility Locaters
Suspended Personnel Platform Workbasket ✘
Other
Error Precursors/Potential Issues
Change Departure from Routine Mental Shortcuts Unclear Communication
Complacency New Technique, Not Used Before Unclear Direction
Confusing/Congested Work Area Non-Routine Task ✘
Unclear Roles/Responsibilities
Equipment Condition Personality Conflicts ✘
Unclear Standards

High Workload ✘
Rework Unexpected

Illness/Fatigue Simultaneous Operations ✘
Unfamiliar with Task/First Time

Lack of Proficiency/Inexperience/Training ✘
Time Pressure (in a hurry)
Licenses/Certifications Require
Crane Operator Hazardous Waste Rigging
Crane Signal Person Heavy Equipment Operator Traffic Control
First Aid/CPR Heavy Equipment Signal Persons
Vehicle Operator
Forklift Operator Powder Actuated Tool User
Personal Protective Equipment
Clothing Foot Protection Eye/Face

High Visibility Substantial Footwear ✘
Safety Glasses
Fire Retardant Safety-Toed Boots Face Shield
Chemical Resistant Metatarsal Protection Goggles
Hand Chemical Resistant Welding Hood
General Duty Work Gloves ✘
Electrical Insulated Respiratory
Cut Resistant Fall Protection Disposable
Chemical Resistant Full Body Harness Half Face
Thermal/Welding Hearing Full Face

Electrical Work Gloves Ear Plugs Supplied Air
Head Earmuffs Other

Hard Hat

Safety Task Assignment-STA( TRS-HS-FRM-0002)


Revision 00, Rev. Date 20-Apr-2020 Page 1 of 3
Safety Task Assignment-STA
TRS-HS-FRM-0002

Other HSE Concerns/Tasks


Asbestos Exposure ✘ Housekeeping Power Lines
Chemical Exposure Ignition Sources Power Tools
Demolition Insects Pressurized Equipment
Dust/Fumes Ladders/Scaffolds Sanitation
Environmental Lead Exposure Steel Erection
Ergonomic/Body Position High Pressure Cleaning Tank/Pipe Testing
Erosion Housekeeping Toxic Exposure
Falling Objects Manual Handling Waste Streams
Flammable Material Marine Operations Power Lines
Grinding Mechanical Pinch Points Working with Sharps
High Pressure Cleaning Powder Actuated Tools
Inspections Required
Aerial Lift Forklift Rigging
Crane Heavy Equipment Scaffolding

Electrical Leads/Equipment Ladder Welding Equipment
Excavation Motor Vehicle Other
Fall Protection Respirator

Task Steps

 Area Preparation.
 Installation of Electrical devices (Db Panels, AC)
 Wiring and Cabling

Hazards
 Work without PTW
 Unauthorized Technician
 Electrocution
 Electric Shock
 Physical injuries
 Trip, Slip, Fall
 Cuts
Hazard Controls
 Pre-Task Briefings, Ensure PTW
 De-Energized all electrical path and implement LOTO
 All power supply and connection must be installed by a competent Technician
 Workers shall ensure that a SSOW is implemented to reduce the possibilities of accident/incident
 Ensure all personnel which is involved in activity must have trained about Electrical safety and LOTO training
 Ensure all electrical material for required work should be as per required standards
 For cable protection provide the cable hanging stands, which is above from ground cable stands will protect the cable from damaged and
reduce the risk of trip and tall
 Measure appropriate lengths of cable instead bundles, for the prevention of unattendent cable place on ground every time
 Ensure all tools should be insulated type
 Ensure that the work being carried out is closely monitored and supervised by qualified, experienced and trained Engineer/Supervisor.
 PPE (Ensure that suitable PPE’s is worn all time when working on electricity)

Involved Crew Members


Post STA
Name If Injury Occurred Post STA Initial Name If Injury Occurred
Initial

Safety Task Assignment-STA( TRS-HS-FRM-0002)


Revision 00, Rev. Date 20-Apr-2020 Page 2 of 3
Safety Task Assignment-STA
TRS-HS-FRM-0002

Post STA
Foreman/chargehand Date Date Time
Was anyone injured or did an unplanned incident (near miss) occur today? Yes No
If yes, explain?

Was it reported to the HSE Department? Yes No


What changes occurred and how were they addressed?

What can we do to improve HSE performance?


Pre-Task Meetings, Inhouse Trainings about related work to site staff, No Discrimination
Concerns/Hazards?

Reviewers
General Foreman/Supervisor Direct Supervisor
HSE Department Other/s

Management Participation
Did a member of management participate? Yes No Review only
If a member of the management participated in this STA meeting or reviewed this STA, complete the following:

Date
Name Signature Date

Safety Task Assignment-STA( TRS-HS-FRM-0002)