SL No. Description Of Work Unit Quantity Rate (Tk)
1. Drains Pit according depth digging , sheet fitting and removing boli Package 1.00 35000
driving man power, sand, cement, khoa, compaction, cc, bottom
layer rod binding shuttering and casting after pipe fitting 2nd layer
wall and top base shuttering casting after pipe fitting 2nd layer wall
and top base shuttering, casting, removing water for mud pump all
complete drains pit as per drawing and direction.
2. Sewerage pit according depth digging , sheet fitting and removing Package 1.00 25000
boli driving man power, sand, cement, khoa, compaction, cc,
bottom layer rod binding shuttering and casting after pipe fitting 2nd
layer wall and top base shuttering casting after pipe fitting 2nd layer
wall and top base shuttering, casting, removing water for mud
pump all complete drains pit as per drawing and direction.
3. HDPE Pipe 200m dia connection pipe drainage pit only fittings. Per rft
4. HDPE Pipe 450/315 dia setting all complete. Per rft
5. RCC Pipe (500 to 2100) dia connection, digging and setting all Per rft
complete.

Note:
*Food Bill: 500tk per day per person will be pay.
*Advance amount should be paid after labor reached in site (about 65000 taka)
*Mobilization Means Labor Quantity, Others machinery & personnel equipment.
Work Safety:
The client to ensure congenial working environment free from any encumbrance, disturbance, extortion and or
toll collection at project side. For any adverse consequence, loss, damage to the property, material and or physical
harassment inflicted to the works/personnel’s all liabilities thereto will be on customer.
Utility Services:
Client is to provide all type of utility services and labor accommodation at site by their own cost & other facilities
such as supply of full-time electricity and water for operation of equipment’s and machinery.

Sub Contractor
Md. Nabid Rayhan Khaleque