You are on page 1of 2

METHOD STATEMENT

REPLACEMENT O F SECTIONAL DOOR SPRING

01. Objective:
Objective of this method statement is to provide details and information of
procedure, repair of sectional door in accordance with the standard of practice as
recommended by the manufacturers.
The Job supervisor shall be responsible to ensure quality work and finishing, in
according with British standards and to co-operate and coordinate with other
Civil & MEP works contractors.

02. Scope of work:


Scope of work for replacement sectional door Spring.

03. Manpower:
The following members of our workforce will be deployed for the work:
For mechanical Installation
(1) Job Supervisor -1
(2) Team head (Door Technician) -1
(3) Door technician -1
(4) Skilled helper -1

04. Equipment
The following equipment’s/machines and tools will be employed in the course of
installation.
a. Hammer.
b. Tape measure, pliers
c. Electric hand screw Machine
d. Vice grip, Screw drivers, welding machine, nails, Rope.

05. Consumable Material:


a. Hinges, Tapping screws
b. Fixing accessories for the doors
06. Repair method/procedure:

a) Inspect the sectional door.


b) Check the motor and wire connection.
c) Repair the sectional door.
d) Check the push button.
e) Door alignment with the guide.
f) Finally inspect the door movement for proper operation

Quality Control:
A) Ensuring all clearance is maintained and doors are working without
encumbrances or hurdles.
B) Ensuring that quality and installation workmanship are in accordance with the
manufacturers’ recommended procedures.
C) Completing the installation of the work good standard and order ready for
commissioning with temporary or permanent power supply
07. Inspection
a) Preliminary Inspection will be done by our own Project Engineer,
b) Clients’ Engineer will be called for inspection of completion of
installation and report the same to Architects/Consultants.

08. Safety Requirements:


a) Site will be inspected and removed for any fire hazard, cleanliness and
/ or unhealthy conditions.
b) Any accident possibility will be eliminated & safe working condition
will be organized before start of work.
c) Work – in progress will be protected from any accident.
d) Fire extinguisher will be in place for any emergency.
e) Scaffolding / ladder / raiser if used will be securely and firmly placed
to ensure accident free working.
f) Site will be cleared for any debris or any hazardous material caused by
the installation work.

10. Protection of completed work:


Installed work shall be protected by the Clients suitably for prevention of
any damage and / or accident to the installed equipment by the Clients
own working persons or of any sub-contractors and the Clients liability
will be to make the work available for handover.
The Clients or their sub-contractors with on-going jobs at the site shall not
use the equipment until final handed over to the clients.

You might also like