S.No. Particulars of item No L B H/D QTY UNIT QTY UNIT Rate Amount
net
amount
EARTHWORK
1 Excavation work in excavation by manual means in
foundation trenches, drains, pipes and cables etc. (Not
exceeding 1.5m in width or 10sqm on plane) including
dressing of sides and ramming of bottoms, lift upto 1.5m
including getting out the excavated soil and disposal of
surplus soils and directed, within a lead of 25mtr. all
kinds of soil.
3 DUMPING STONE
Dumping of stone including cost of stone (on horizontal)
3.A COLUMN
COLUMN (2'X2') 15 CFT
COLUMN (2'X1') 4 CFT
COLUMN (1'X1'6") 6 CFT
COLUMN (1'X1') 4 CFT
3.B WALL
7-13(A,G,O) 3 59.5 2.5 0.5 74.38 CFT
1-7(G,J,K) 3 40 2.5 0.5 50.00 CFT
2-7 (H) 1 30 2.5 0.5 37.50 CFT
4-7 (L) 1 20 2.5 0.5 25.00 CFT
1-5 (I) 1 22.75 2.5 0.5 28.44 CFT
7-10 (I) 1 14 2.5 0.5 17.50 CFT
7-9 ( B,C,E,F) 4 11.25 2.5 0.5 14.06 CFT
12-13 (D) 1 10.75 2.5 0.5 13.44 CFT
A-G (7,12,11) 3 25.1 2.5 0.5 31.38 CFT
G-K (1) 1 99 2.5 0.5 123.75 CFT
A-O (13) 1 149 2.5 0.5 186.25 CFT
B-G (8,9) 2 18 2.5 0.5 22.50 CFT
G-I (2,10) 2 20.6 2.5 0.5 25.75 CFT
G-H (3) 1 9 2.5 0.5 11.25 CFT
H-I (5) 1 11.75 2.5 0.5 14.69 CFT
G-J (7) 1 35 2.5 0.5 43.75 CFT
J-O (4) 1 89 2.5 0.5 111.25 CFT
K-O (6,7) 2 25 2.5 0.5 31.25 CFT
TOTAL 862.13 CFT -
4 STONE MASONRY
Random rubble masonry with hard stone from qurry in
foundation and plinth level with cement concrete 1:6:12
at plinth with 1:6 mix
4.a WALL
7-13(A,G,O) 3 59.5 2 4 1,428.00 CFT
1-7(G,J,K) 3 40 2 4 960.00 CFT
2-7 (H) 1 30 2 4 240.00 CFT
4-7 (L) 1 20 2 4 160.00 CFT
1-5 (I) 1 22.75 2 4 182.00 CFT
7-10 (I) 1 14 2 4 112.00 CFT
7-9 ( B,C,E,F) 4 11.25 2 4 360.00 CFT
12-13 (D) 1 10.75 2 4 86.00 CFT
A-G (7,12,11) 3 25.1 2 4 602.40 CFT
G-K (1) 1 99 2 4 792.00 CFT
A-O (13) 1 149 2 4 1,192.00 CFT
B-G (8,9) 2 18 2 4 288.00 CFT
G-I (2,10) 2 20.6 2 4 329.60 CFT
G-H (3) 1 9 2 4 72.00 CFT
H-I (5) 1 11.75 2 4 94.00 CFT
G-J (7) 1 35 2 4 280.00 CFT
J-O (4) 1 89 2 4 712.00 CFT
K-O (6,7) 2 25 2 4 400.00 CFT
TOTAL 8,290.00 CFT -
5 CONCRETE WORK
Providing and laying position cement concrete of
specified grade excluding the cost of centering and
shuttering. All work upto plinth level 1:2:4 (1 cement : 2
coarse sand : 4 graded stone aggregate 40 mm nominal
size) (crushed)
5A COLUMN
COLUMN (2'X2') 15 CFT
COLUMN (2'X1') 4 CFT
COLUMN (1'X1'6") 6 CFT
COLUMN (1'X1') 4 CFT
5.B WALL
7-13(A,G,O) 3 59.5 2.5 0.33 147.26 CFT
1-7(G,J,K) 3 40 2.5 0.33 99.00 CFT
2-7 (H) 1 30 2.5 0.33 24.75 CFT
4-7 (L) 1 20 2.5 0.33 16.50 CFT
1-5 (I) 1 22.75 2.5 0.33 18.77 CFT
7-10 (I) 1 14 2.5 0.33 11.55 CFT
7-9 ( B,C,E,F) 4 11.25 2.5 0.33 37.13 CFT
12-13 (D) 1 10.75 2.5 0.33 8.87 CFT
A-G (7,12,11) 3 25.1 2.5 0.33 62.12 CFT
G-K (1) 1 99 2.5 0.33 81.68 CFT
A-O (13) 1 149 2.5 0.33 122.93 CFT
B-G (8,9) 2 18 2.5 0.33 29.70 CFT
G-I (2,10) 2 20.6 2.5 0.33 33.99 CFT
G-H (3) 1 9 2.5 0.33 7.43 CFT
H-I (5) 1 11.75 2.5 0.33 9.69 CFT
G-J (7) 1 35 2.5 0.33 28.88 CFT
J-O (4) 1 89 2.5 0.33 73.43 CFT
K-O (6,7) 2 25 2.5 0.33 41.25 CFT
TOTAL 854.91 CFT
6 R.C.C WORK
Reinforced cement concrete work in walls (any
thickness), including attached pilasters, buttresses, plinth
and string courses, fillets, column, pillars, piers,
abutments, posts and struts etc. upy floor five level
excluding cost of centering, shuttering, finishing and
reinforcement: (1:1.5:3 1 cement : 1.5 coarse sand : 3
graded stone aggregate 20mm nominal size).
6.A FOOTING
FOOTING 3.0X3.0
FOOTING 2.4X2.4
FOOTING 1.8X1.8
6.B COLUMN
COLUMN (2'X2') 15 CFT
COLUMN (2'X1') 4 CFT
COLUMN (1'X1'6") 6 CFT
COLUMN (1'X1') 4 CFT
DEDUCT STAIR
STAIR DOG-LEG 3 10 6.5 0.5 97.5
Y TOTAL 97.50 CFT
TOTAL (X-Y) CFT
7 REINFORCEMENT
Reinforcement for R.C.C. work including straightening,
cutting, bending, placing in position and binding all
complete. (Thermo-Mechanically treated bars.)
8.A FOOTING
FOOTING 3.0X3.0
FOOTING 2.4X2.4
FOOTING 1.8X1.8
9A GROUND FLOOR
SECURITY ROOM -1 L/W 2 25 1 10 500 CFT
S/W 1 20 1 10 200 CFT
S/W 1 12.5 1 10 125 CFT
TOILET L/W 1 230 1 10 2300 CFT
S/W 1 14 1 10 140 CFT
S/W 1 4.5 1 10 45 CFT
S/W 1 6.5 0.5 10 32.5 CFT
S/W 1 11.25 0.5 10 56.25 CFT
S/W 2 4.75 0.5 10 47.5 CFT
S/W 1 6 0.5 10 30 CFT
S/W 1 1.8 0.5 10 9 CFT
KITCHEN L/W 2 64 1 10 1280 CFT
S/W 1 17 1 10 170 CFT
VVIP LOUNGE L/W 1 40 1 10 400 CFT
S/W 1 14.25 1 10 142.5 CFT
S/W 1 26 1 10 260 CFT
S/W 1 17.25 1 10 172.5 CFT
SECURITY ROOM-2 L/W 1 12.75 0.5 10 63.75 CFT
L/W 1 12.75 1 10 127.5 CFT
S/W 2 11.75 0.5 10 117.5 CFT
TOILET L/W 1 20.75 1 10 207.5 CFT
S/W 1 10 0.5 10 50 CFT
S/W 1 13 0.5 10 65 CFT
S/W 3 5 0.5 10 75 CFT
S/W 1 10 1 10 100 CFT
LIFT L/W 2 9 1 10 180 CFT
S/W 1 7 1 10 70 CFT
LOBBY-1 L/W 1 39.75 1 10 397.5 CFT
S/W 1 2.5 1 10 25 CFT
MPH L/W 1 124 1 10 1240 CFT
S/W 1 42.25 1 10 422.5 CFT
S/W 1 14 1 10 140 CFT
S/W 1 14.25 1 10 142.5 CFT
LOBBY-2 L/W 1 31.5 1 10 315 CFT
S/W 2 25 0.5 10 250 CFT
TOILET (HE) L/W 1 16.75 1 10 167.5 CFT
L/W 1 16.75 0.5 10 83.75 CFT
S/W 1 11.5 1 10 115 CFT
WC L/W 2 4.5 0.5 10 45 CFT
TOILET (SHE) L/W 1 16.75 0.5 10 83.75 CFT
S/W 1 11.25 0.5 10 56.25 CFT
S/W 1 13.5 1 10 135 CFT
S/W 2 4.75 0.5 10 47.5 CFT
SECURITY ROOM-2 L/W 1 12.5 1 10 125 CFT
S/W 1 10.75 1 10 107.5 CFT
S/W 1 10.75 0.5 10 53.75 CFT
OFFICE L/W 1 12.5 1 10 125 CFT
20 Wall Insulations
2"X2" THICK HORIZONTAL @ 3'
WOODEN FRAMES
VERTICAL @ 6'
Providing wood work in frames of doors, windows,
20.A clerestory windows and other frames, wrought first class
kail wood.
SECOND FLOOR
ACOUSTIC TREATMENT
23 Acoustic boards, for sound Absorbers
GROUND FLOOR
MEZZANINE FLOOR
FIRST FLOOR
W = 34 @ 100 mm 34 Nos.
FLOORING
Dumping of stone including cost of stone (on horizontal)
27
GF cum
FF cum
TOTAL - cum
28 Cement concrete flooring 1:2:4 stoe agg. Finished
GF sqm
FF sqm
SF sqm
TF sqm
TOTAL - sqm - sqm -
Marble stone flooring with 16 mm (average) thick
marble stone (sample of marble shall be approved by
engineer-in-charge) over 20 mm (average) thick base of
29
cement mortar 1:4 ( 1 cement : 4 coarse sand) laid and
joined with cement slurry including rubbing and
polishing complete.
PASSAGE 1 sqm
PASSAGE 2 sqm
STAIR LOBBY sqm
PASSAGE 3 sqm
ENTRACE sqm
STAIRS TREAD sqm
RISER sqm
LANDING sqm
sqm - sqm -
ROOF TREATMENT
SLAB