You are on page 1of 103

ERC

AWASH – KOMBOLCHA – HARA GEBAYA


RAILWAY PROJECT

Employer’s Representative:

STATIONS and WORKSHOP


STATIONS SIGNAGE SYSTEM
Report No
AKH - YM I - DD - S T 0 0 X - D - AR - RE P - 0 0 0 1 - 0
Project Organization Stage Location Category Disciplin Type of Number Vers.
e Document

21.01.2018
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

Project:
VERSION HISTORY
AWASH – KOMBOLCHA – HARA GEBAYA RAILWAY Version Details Date Amended By
0 First Issue 21.01.2018 YM Design Group
PROJECT, ETHIOPIA

Employer:

ETHIOPIAN RAILWAYS CORPORATION (ERC)


PREPARED BY

YM - Architectural
Employer’s Representative: Edited by İ. Ünsal
Design Manager

YM - Architectural
Checked by İ. Ünsal
Design Manager

YM - Architectural
Checked by İ. Ünsal
Design Manager
Contractor: YM - General
Approved by L. Horozoğlu Architectural Design
Coordinator
YM - Deputy GM,
www.ym.com.tr Approved by Z. Uygun
Design

Designer: Approved by E.Cengiz YM - Project Manager

APPROVAL
APPROVED APPROVED AS NOTED REJECTED

Report Name:
STATIONS and WORKSHOP
ARCHITECTURAL FEATURES

Report No: APPROVED BY


Name Title Signature & Stamp
A K H - YM I - D D - S T 0 0 X - D - A R - R E P - 0 0 0 1 - 0
Project Organization Stage Location Category Discipline Type of Number Version
Document

Date: 21.01.2018

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 2 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

TABLE OF CONTENTS
1. PRINCIPLES…………………………............................................................................................................................. ....05
2. TYPICAL INTERMEDIATE STATION…………………........................................................................................................06
ACCESS GUIDING ANALYSIS CHART
03. TYPICAL INTERMEDIATE STATION SIGNAGE SYSTEM .......... ...................................................................................07-10
04. TYPICAL INTERMEDIATE STATION SIGNAGE SYSTEM DETAIL...................................................................................11-15
05. TYPICAL TERMINAL STATION …………….…….............................................................................................................16
ACCESS GUIDING ANALYSIS CHART
06. TYPICAL TERMINAL STATION SIGNAGE SYSTEM .......... ..........................................................................................17-22
07. TYPICAL TERMINAL STATION SIGNAGE SYSTEM DETAIL.......................................................................................….23-27
08. AWASH STATION PLATFORM ………………................................................................................................................28
SIGNAGE SYSTEM
ACCESS GUIDING ANALYSIS CHART
09. AWASH STATION PLATFORM SIGNAGE SYSTEM…....................................................................................................29-30
10. AWASH STATION PLATFORM SIGNAGE SYSTEM DETAIL...........................................................................................31-37
11. AMIBARA STATION PLATFORM ……………….............................................................................................................38
SIGNAGE SYSTEM
ACCESS GUIDING ANALYSIS CHART
12. AMIBARA STATION PLATFORM SIGNAGE SYSTEM…................................................................................................39
13. AMIBARA STATION PLATFORM SIGNAGE SYSTEM DETAIL.......................................................................................40-43
14. ROBIT STATION PLATFORM ………………..................................................................................................................44
SIGNAGE SYSTEM
ACCESS GUIDING ANALYSIS CHART
15. ROBIT STATION PLATFORM SIGNAGE SYSTEM…......................................................................................................45
16. ROBIT STATION PLATFORM SIGNAGE SYSTEM DETAIL.............................................................................................46-49
17. SENBETE STATION PLATFORM ………………..............................................................................................................50
SIGNAGE SYSTEM
ACCESS GUIDING ANALYSIS CHART
18. SENBETE STATION PLATFORM SIGNAGE SYSTEM…..................................................................................................51-52
19. SENBETE STATION PLATFORM SIGNAGE SYSTEM DETAIL.........................................................................................53-59
Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 3 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

TABLE OF CONTENTS
20. KARAKORE STATION PLATFORM ………………...........................................................................................................60
SIGNAGE SYSTEM
ACCESS GUIDING ANALYSIS CHART
21. KARAKORE STATION PLATFORM SIGNAGE SYSTEM…..............................................................................................61
22. KARAKORE STATION PLATFORM SIGNAGE SYSTEM DETAIL.....................................................................................62-65
23. MEKOY STATION PLATFORM ………………................................................................................................................66
SIGNAGE SYSTEM
ACCESS GUIDING ANALYSIS CHART
24. MEKOY STATION PLATFORM SIGNAGE SYSTEM…....................................................................................................67
25. MEKOY STATION PLATFORM SIGNAGE SYSTEM DETAIL...........................................................................................68-71
26. KOMBOLCHA STATION PLATFORM ……………….......................................................................................................72
SIGNAGE SYSTEM
ACCESS GUIDING ANALYSIS CHART
27. KOMBOLCHA STATION PLATFORM SIGNAGE SYSTEM…...........................................................................................73-74
28. KOMBOLCHA STATION PLATFORM SIGNAGE SYSTEM DETAIL..................................................................................75-81
29. HAYK STATION PLATFORM ………………...................................................................................................................82
SIGNAGE SYSTEM
ACCESS GUIDING ANALYSIS CHART
30. HAYK STATION PLATFORM SIGNAGE SYSTEM….......................................................................................................83-84
31. HAYK STATION PLATFORM SIGNAGE SYSTEM DETAIL..............................................................................................85-91
32. MERSA STATION PLATFORM ……………….................................................................................................................92
SIGNAGE SYSTEM
ACCESS GUIDING ANALYSIS CHART
33. MERSA STATION PLATFORM SIGNAGE SYSTEM…....................................................................................................93
34. MERSA STATION PLATFORM SIGNAGE SYSTEM DETAIL...........................................................................................94-97
35. HARA GEBAYA STATION PLATFORM ………………......................................................................................................98
SIGNAGE SYSTEM
ACCESS GUIDING ANALYSIS CHART
36. HARA GEBAYA STATION PLATFORM SIGNAGE SYSTEM….........................................,...............................................99
37. HARA GEBAYA STATION PLATFORM SIGNAGE SYSTEM DETAIL...................................,............................................100-103
Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 4 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

01. PRINCIPLES

STANDARD COLORS PICDOGRAMS

ARROWS

STANDARD FONTS

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 5 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

02- TYPICAL INTERMEDIATE STATION


ACCESS GUIDING ANALYSIS CHART

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 6 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

03- TYPICAL INTERMEDIATE STATION SIGNAGE SYSTEM

GROUND FLOOR PLAN

ROOF PLAN
Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 7 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

03- TYPICAL INTERMEDIATE STATION SIGNAGE SYSTEM

FRONT ELEVATION

BACK ELEVATION EXIT ELEVATION

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 8 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

03- TYPICAL INTERMEDIATE STATION SIGNAGE SYSTEM

ELEVATION 1

ELEVATION 2
Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 9 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

03- TYPICAL INTERMEDIATE STATION SIGNAGE SYSTEM

ELEVATION 3

ELEVATION 4
Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 10 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

04- TYPICAL INTERMEDIATE STATION SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 11 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

04- TYPICAL INTERMEDIATE STATION SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 12 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

04- TYPICAL INTERMEDIATE STATION SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 13 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

04- TYPICAL INTERMEDIATE STATION SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 14 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

04- TYPICAL INTERMEDIATE STATION SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 15 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

05- TYPICAL TERMINAL STATION


ACCESS GUIDING ANALYSIS CHART

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 16 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

06- TYPICAL TERMINAL STATION SIGNAGE SYSTEM

GROUND FLOOR PLAN

ROOF PLAN
Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 17 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

06- TYPICAL TERMINAL STATION SIGNAGE SYSTEM

FRONT ELEVATION

BACK ELEVATION

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 18 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

06- TYPICAL TERMINAL STATION SIGNAGE SYSTEM

RIGHT SIDE ELEVATION

LEFT SIDE ELEVATION EXIT ELEVATION


Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 19 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

06- TYPICAL TERMINAL STATION SIGNAGE SYSTEM

ELEVATION 1

ELEVATION 2

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 20 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

06- TYPICAL TERMINAL STATION SIGNAGE SYSTEM

ELEVATION 3

ELEVATION 4

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 21 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

06- TYPICAL TERMINAL STATION SIGNAGE SYSTEM

FRONT ELEVATION ELEVATION 5

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 22 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

07- TYPICAL TERMINAL STATION SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 23 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

07- TYPICAL TERMINAL STATION SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 24 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

07- TYPICAL TERMINAL STATION SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 25 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

07- TYPICAL TERMINAL STATION SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 26 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

07- TYPICAL TERMINAL STATION SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 27 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

08- AWASH STATION PLATFORM


SIGNAGE SYSTEM
ACCESS GUIDING ANALYSIS CHART

SIGNAGE SYSTEM

ACCESS GUIDING ANALYSIS CHART

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 28 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

09- AWASH STATION PLATFORM SIGNAGE SYSTEM

ELEVATION 1

ELEVATION 2

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 29 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

09- AWASH STATION PLATFORM SIGNAGE SYSTEM

ELEVATION 3 ELEVATION 4

ELEVATION 5 ELEVATION 6

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 30 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

10- AWASH STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 31 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

10- AWASH STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 32 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

10- AWASH STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 33 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

10- AWASH STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 34 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

10- AWASH STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 35 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

10- AWASH STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 36 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

10- AWASH STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 37 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

11- AMIBARA STATION PLATFORM


SIGNAGE SYSTEM
ACCESS GUIDING ANALYSIS CHART

SIGNAGE SYSTEM

ACCESS GUIDING ANALYSIS CHART

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 38 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

12- AMIBARA STATION PLATFORM SIGNAGE SYSTEM

ELEVATION 1

ELEVATION 2 ELEVATION 3 ELEVATION 4 ELEVATION 5

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 39 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

13- AMIBARA STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 40 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

13- AMIBARA STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 41 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

13- AMIBARA STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 42 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

13- AMIBARA STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 43 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

14- ROBIT STATION PLATFORM


SIGNAGE SYSTEM
ACCESS GUIDING ANALYSIS CHART

SIGNAGE SYSTEM

ACCESS GUIDING ANALYSIS CHART

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 44 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

15- ROBIT STATION PLATFORM SIGNAGE SYSTEM

ELEVATION 1

ELEVATION 2 ELEVATION 3 ELEVATION 4 ELEVATION 5

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 45 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

16- ROBIT STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 46 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

16- ROBIT STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 47 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

16- ROBIT STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 48 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

16- ROBIT STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 49 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

17- SENBETE STATION PLATFORM


SIGNAGE SYSTEM
ACCESS GUIDING ANALYSIS CHART

SIGNAGE SYSTEM

ACCESS GUIDING ANALYSIS CHART

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 50 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

18- SENBETE STATION PLATFORM SIGNAGE SYSTEM

ELEVATION 1

ELEVATION 2

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 51 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

18- SENBETE STATION PLATFORM SIGNAGE SYSTEM

ELEVATION 3 ELEVATION 4

ELEVATION 5 ELEVATION 6

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 52 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

19- SENBETE STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 53 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

19- SENBETE STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 54 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

19- SENBETE STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 55 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

19- SENBETE STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 56 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

19- SENBETE STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 57 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

19- SENBETE STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 58 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

19- SENBETE STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 59 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

20- KARAKORE STATION PLATFORM


SIGNAGE SYSTEM
ACCESS GUIDING ANALYSIS CHART

SIGNAGE SYSTEM

ACCESS GUIDING ANALYSIS CHART

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 60 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

21- KARAKORE STATION PLATFORM SIGNAGE SYSTEM

ELEVATION 1

ELEVATION 2 ELEVATION 3 ELEVATION 4 ELEVATION 5

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 61 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

22- KARAKORE STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 62 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

22- KARAKORE STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 63 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

22- KARAKORE STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 64 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

22- KARAKORE STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 65 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

23- MEKOY STATION PLATFORM


SIGNAGE SYSTEM
ACCESS GUIDING ANALYSIS CHART

SIGNAGE SYSTEM

ACCESS GUIDING ANALYSIS CHART

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 66 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

24- MEKOY STATION PLATFORM SIGNAGE SYSTEM

ELEVATION 1

ELEVATION 2 ELEVATION 3 ELEVATION 4 ELEVATION 5

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 67 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

25- MEKOY STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 68 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

25- MEKOY STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 69 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

25- MEKOY STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 70 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

25- MEKOY STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 71 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

26- KOMBOLCHA STATION PLATFORM


SIGNAGE SYSTEM
ACCESS GUIDING ANALYSIS CHART

SIGNAGE SYSTEM

ACCESS GUIDING ANALYSIS CHART

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 72 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

27- KOMBOLCHA STATION PLATFORM SIGNAGE SYSTEM

ELEVATION 1

ELEVATION 2

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 73 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

27- KOMBOLCHA STATION PLATFORM SIGNAGE SYSTEM

ELEVATION 3 ELEVATION 4

ELEVATION 5

ELEVATION 6 ELEVATION 7

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 74 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

28- KOMBOLCHA STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 75 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

28- KOMBOLCHA STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 76 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

28- KOMBOLCHA STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 77 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

28- KOMBOLCHA STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 78 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

28- KOMBOLCHA STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 79 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

28- KOMBOLCHA STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 80 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

28- KOMBOLCHA STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 81 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

29- HAYK STATION PLATFORM


SIGNAGE SYSTEM
ACCESS GUIDING ANALYSIS CHART

SIGNAGE SYSTEM

ACCESS GUIDING ANALYSIS CHART

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 82 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

30- HAYK STATION PLATFORM SIGNAGE SYSTEM

ELEVATION 1

ELEVATION 2

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 83 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

30- HAYK STATION PLATFORM SIGNAGE SYSTEM

ELEVATION 3 ELEVATION 4

ELEVATION 5 ELEVATION 6

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 84 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

31- HAYK STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 85 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

31- HAYK STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 86 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

31- HAYK STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 87 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

31- HAYK STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 88 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

31- HAYK STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 89 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

31- HAYK STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 90 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

31- HAYK STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 91 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

32- MERSA STATION PLATFORM


SIGNAGE SYSTEM
ACCESS GUIDING ANALYSIS CHART

SIGNAGE SYSTEM

ACCESS GUIDING ANALYSIS CHART

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 92 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

33- MERSA STATION PLATFORM SIGNAGE SYSTEM

ELEVATION 1

ELEVATION 2 ELEVATION 3 ELEVATION 4 ELEVATION 5

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 93 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

34- MERSA STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 94 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

34- MERSA STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 95 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

34- MERSA STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 96 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

34- MERSA STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 97 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

35- HARA GEBAYA STATION PLATFORM


SIGNAGE SYSTEM
ACCESS GUIDING ANALYSIS CHART

SIGNAGE SYSTEM

ACCESS GUIDING ANALYSIS CHART

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 98 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

36- HARA GEBAYA STATION PLATFORM SIGNAGE SYSTEM

ELEVATION 1

ELEVATION 2 ELEVATION 3 ELEVATION 4 ELEVATION 5

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 99 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

37- HARA GEBAYA STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 100 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

37- HARA GEBAYA STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 101 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

37- HARA GEBAYA STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 102 / 103
ERC AWASH - KOMBOLCHA - HARA GEBEYA RAILWAY PROJECT

37- HARA GEBAYA STATION PLATFORM SIGNAGE SYSTEM DETAIL

Recommended brands and models may vary. Despite that, technical specifications will be similar. Referral photos retrieved from the web.

Stations and Workshop Stations Signage System AKH – YMI – DD – ST00X – D – AR – REP – 0001 – 0 21.01.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any purpose without the prior written permission of Yapı Merkezi. © Yapı Merkezi İnşaat ve Sanayi A.Ş.,2015 Page: 103 / 103