This document outlines the schedule for an EPC project to construct structural steel truss rafter frames and a PVC membrane roof for a concentrate barn expansion at a port area. The schedule spans 84 days from February 1st to April 29th, 2024 and includes tasks for concrete works like foundation pouring, pedestal works, slab works, wall works, and barrier construction.
This document outlines the schedule for an EPC project to construct structural steel truss rafter frames and a PVC membrane roof for a concentrate barn expansion at a port area. The schedule spans 84 days from February 1st to April 29th, 2024 and includes tasks for concrete works like foundation pouring, pedestal works, slab works, wall works, and barrier construction.
This document outlines the schedule for an EPC project to construct structural steel truss rafter frames and a PVC membrane roof for a concentrate barn expansion at a port area. The schedule spans 84 days from February 1st to April 29th, 2024 and includes tasks for concrete works like foundation pouring, pedestal works, slab works, wall works, and barrier construction.
EPC For Structural Steel of Truss Rafter Frame and
PVC Membrane Roof of Concentrate Barn Expansion
To East Side at Port Area ID WBS Task Task Name Duration Start Finish Feb '24 Mar '24 Apr '24 May '24 Mode 14 21 28 04 11 18 25 03 10 17 24 31 07 14 21 28 05 1 1 EPC For Structural Steel of Truss Rafter 84 days Thu 01/02/24 Mon 29/04/24 Frame and PVC Membrane Roof of Concentrate Barn Expansion To East Side at 2 1.1 Concrete Works 84 days Thu 01/02/24 Mon 29/04/24 3 1.1.1 Preparation 7 days Thu 01/02/24 Wed 07/02/24 4 1.1.2 Foot Plate Foundation 46 days Thu 01/02/24 Tue 19/03/24 5 1.1.2.1 Lean Concrete Works 7 days Thu 01/02/24 Wed 07/02/24 6 1.1.2.2 Pouring Concrete 30 days Sun 18/02/24 Tue 19/03/24 7 1.1.3 Pedestal Works 30 days Sun 03/03/24 Wed 03/04/24 8 1.1.3.1 Pouring Concrete 30 days Sun 03/03/24 Wed 03/04/24 9 1.1.4 Concrete Slab Works 44 days Sun 25/02/24 Fri 12/04/24 10 1.1.4.1 Lean Concrete Works 30 days Sun 25/02/24 Tue 26/03/24 11 1.1.4.2 Pouring Concrete 30 days Sun 10/03/24 Fri 12/04/24 12 1.1.5 Concrete Wall Works 30 days Thu 28/03/24 Mon 29/04/24 13 1.1.5.1 Pouring Concrete 30 days Thu 28/03/24 Mon 29/04/24 14 1.1.6 Concrete Barrier Works 66 days Fri 09/02/24 Thu 18/04/24 15 1.1.6.1 In Situ Concrete Barrier Works (1st Layer) 14 days Thu 21/03/24 Thu 04/04/24 16 1.1.6.1.1 Pouring Concrete 14 days Thu 21/03/24 Thu 04/04/24 17 1.1.6.2 PreCast Concrete Works 30 days Fri 09/02/24 Sat 09/03/24 18 1.1.6.2.1 Pouring Concrete 30 days Fri 09/02/24 Sat 09/03/24 19 1.1.6.3 Sump Pit & Perimeter U-Ditch Works 6 days Sat 13/04/24 Thu 18/04/24 20 1.1.6.3.1 Lean Concrete 3 days Sat 13/04/24 Mon 15/04/24 21 1.1.6.3.2 Pouring Concrete 3 days Tue 16/04/24 Thu 18/04/24