IMS/SOP/F02
INFRASTRUCTURE COMPANY Rev. No. 02
Rev.Date. 18.10.2021
PRIVATE LIMITED–(KPICPL)
Issue No. 03
Issue Date 25.10.2021
INTEGRATED MANGEMENT SYSTEM -STANDARD OPERATING PROCEDURE
EHV TOWER ERECTION, STRINGING WORKS
ISO 9001:2015, ISO 14001:2015 & ISO 45001: 2018
TABLE OF CONTENTS
1.0 PURPOSE
The purpose of this document is to ensure the concrete works at the project site is being
done in a sequence and the activities shall be carried out in accordance with relevant Indian
Standards/project technical specifications.
2.0 SCOPE
This procedure is applicable to Tower erection, Stringing & commissioning works being
carried out at site.
3.0 REFERENCE
IS Codes
To follow the standard operating procedures and to ensure the erection &
commissioning works are being done sequentially.
Report to the discipline lead regarding issues if any and other clarifications required
on execution of works.
Co-Ordinate with safety and quality representative for timely inspection and testing.
Engineer on site will be responsible to ensure the Quality of construction activities
6.0 PROCEDURES
The GFC drawings, BOQ & technical specifications is the basis for construction
In general, all materials and workmanship will comply with the relevant clauses of
Indian Standards.
Care shall be taken during handling and storage to prevent abrasion or other damage to the
cables. Prior to installation, reels of conductor shall be stored blocked-up off the ground and
adequately supported to avoid damage to reel, lagging and conductor. Cables and reels shall
be kept free of standing water, dust, and mud
Placement of insulator grading ring, arching horn shall be done as per approved drawings.
Hardware tightness shall be done properly.
Electrical and ground clearance for stringing shall be ensured.
Sag of conductor stringing and conductor tightness at both ends shall be visually ensured at
site.
Jumpering shall be as per standards and damper shall be done as per drawings.
Optical Ground Wire (OPGW) shall be approved from engineer in charge and stringing shall
be done as per standards.
6.4 Earthing & Final Testing
Earthing shall be done for each tower as per drawings.
Earthing for continuous overhead earth wires shall be check visually and it should be as per
approved drawings.
Testing shall be done as per approved procedures. ITP attached.
6.5 Documentation
The following documentation related to erection / stringing works shall be maintained
1. Material Test Reports
2. Inspection Reports
3. Equipment calibration reports
7.0 ATTACHMENTS
Inspection Test plan / Field Quality Plan