MATERIALS SCHEDULE AND LABOR FOR CONSTRUCTION OF TWO UNITS OF CHARCOAL, 3 UNITS FIREWOOD
AND MEAT GRILL LOCAL ENERGY SAVING CHARCOAL AND FIREWOOD STOVE AT SHEEMA FOR PARVLOV K
Amount
No Description Qty Unit Rate (UGX)
(UGX)
1 Masonry Work
A Angle Lines
7 Pcs 38,000 266,000
B Flat Ring 1.5 Pcs 70,000 105,000
Total 996,000
Others
I
White Cement
1 Bag 80,000 80,000
J Fire Cement 25 Kgs
1 Kgs 250,000 250,000
K Gloove Welded
1 Pieces 35,000 35,000
L Metallic Doors with Hinges 6 Pieces
30,000 180,000
Total 1,791,000
Grand Total Without Labor : 2,787,000
Labor
T Provisional Sum for labor feeding and accommodation 4 Days 650,000 650,000
Note: The prices stated can vary depending on the Supplier .Prepared by Henry Darlin Kiige 31st October 2023
Experts in: General Construction, Architectural and Structural Designs, Civil engineering, Interior
Design, Project Management, Water Works and General Supplies