MATERIALS SCHEDULE AND LABOR FOR CONSTRUCTION OF TWO UNITS OF CHARCOAL, 3 UNITS FIREWOOD
AND MEAT GRILL LOCAL ENERGY SAVING CHARCOAL AND FIREWOOD STOVE AT SHEEMA FOR PARVLOV K

Amount
No Description Qty Unit Rate (UGX)
(UGX)
1 Masonry Work
A Angle Lines
7 Pcs 38,000 266,000
B Flat Ring 1.5 Pcs 70,000 105,000

Kajjansi Well burnt Clay Bricks 300 Pieces 1000 300,000


D
Cement
E 5 Bags 35,000 175,000
Sand
F 1 Trip 140,000 140,000

Clay 10 Kgs 1,000 10,000


G

Total 996,000

Others

H Terrazzo Stones 4 Bags 45,000 140,000

I
White Cement
1 Bag 80,000 80,000
J Fire Cement 25 Kgs
1 Kgs 250,000 250,000
K Gloove Welded
1 Pieces 35,000 35,000
L Metallic Doors with Hinges 6 Pieces
30,000 180,000

Chimney 6 Pieces 34,000 204,000


M
N Welded Meat Metal Grill 1 Pieces 100,000 100,000
Stainless Steel Box Heat and smoke Receiver
O 1 Pieces 150,000 150,000
Q Red Oxide 8 Kgs 14,000 112,000
R Iron Bar 1 Piece 40,000 40,000
S Transport 1 Item 500,000 500,000

Total 1,791,000
Grand Total Without Labor : 2,787,000
Labor
T Provisional Sum for labor feeding and accommodation 4 Days 650,000 650,000

Grand Total with Labor, feeding and accommodation 3,437,000

Note: The prices stated can vary depending on the Supplier .Prepared by Henry Darlin Kiige 31st October 2023