Professional Documents
Culture Documents
ASAZ - 018 Rovali Building Cont 23.01.24
ASAZ - 018 Rovali Building Cont 23.01.24
2024
Quotation
Respected Sir,
With reference to your provided information, we have had the opportunity of evaluating such as a prestigious
projectandhavemuchpleasureinsettingsoutbelowourquotationandhighlycompetitivepriceforyourdue
consideration.
Door Semi Solid Flush Door Q Rate Amount
ty
Frame: Manufacturing, supply and Installation solid Meranti wood (4.5) with Rubber seal.
Shutter: SemiSolid75%Flushpaneldoorwithdesignasperdoordesign
Architrave: Solid Beech wood 70mmx12mm.
Finishing with Polishing.
Bathroom Normal 12 1250.00 15000.00
Main Door 60 minutes 6 1650.00 9900.00
Kitchen 60 minutes 6 1650.00 9900.00
Service Door 60 minutes 7 1650.00 11550.00
Room Normal 10 1250.00 12500
Stair 90 minutes 3 1800.00 5400.00
Double Door 60 minutes 1 2200.00 2200.00
TOTAL DOOR 45
Total Amount 66450.00
5%Vat 3322.00
Including Vat Amount 69,772.00
Our prices based on yours pacifications, in case of any changes in specification or Quantity so price Should be
modified accordingly.
All the physical quantity and sizes would be re-measurable at site.
Any scaffolding Cranes, or any other type of lifting equipment’s should bear ranged by them a in contract or free of
Protection from Concrete, plaster, paint, or any other items should responsibility of them a in contractor.
Sub-frames are excluded from our offer.
With Locks, Handles Hingies
Terms of Payments.
1 50% Advance payment.
2 50% After Full work
Best Reagards
AlSamaaAlZarqaaCarpentryCo.LLC
Shahzad Ahmed
055 418 3468