AIR SEPARATION UNIT PROJECT

REQUEST FOR INSPECTION (RFI)

RFI No : IN-3110-JIND 744 Date Issue : 22-Mar-2024


Client : PT. Amman Mineral Industri Page : 1 Of 1
Location : Air Separation Unit Project

DATE TIME INSPECTION ITEM PLACE REMARK


23-Mar-2024 SANDCONE

2:00 PM BACKFILLING Air Separation Unit


until SANDCONE

Finish

Result : Accepted Rejected

Reinspection Required : Yes No

Comment:

PT. BYWOS MULTI SOLUTION PT. JGC Indonesia PT. Amman Mineral Industri
Signature : Signature : Signature :