Takeoff Sheet

Project :- Residence (G+1)


Location :- AKSUM-
Client:- Timnit G/senbet kahsay
Consultant :- G4 Engineering PLC
T.G L*W*H Squ Unit Description T.G L*W*H Squ Unit Description
A. SUB STRACTURE 179.375 m³ Total
1.Excavation and Earth work 1.4 trench excavation
1 16.01 1.1. Site Clearing 1 6.51
16.31 261.12 m² Total 1.2
14.51 1.2. Bulk Excavation 1.5 11.718 m³ along axis-d
1 1 7.48
14.81 1.2
0.50 107.45 m³ Total 1.5 13.464 m³ along axis-c'
1.3. Pit Excavation 1 1.13
3 2.50 1.2
2.50 1.5 2.03 m³ along axis-c
2.50 46.88 m³ F1-c1 1 3.33
1 2.50 1.2
2.50 1.5 5.99 m³ alond axis-b
2.50 15.63 m³ F1-c3 1 5.93
3 2.50 1.2
2.50 1.5 10.67 m³ along axis-a
2.50 46.88 m³ F1-c6 1 3.99
1 1.90 1.2
1.90 1.5 7.182 m³ alond axis -1
2.50 9.03 m³ F2-C1 1 4.21
1 2.30 1.2
2.30 1.5 7.58 m³ along axis-2
2.50 13.22 m³ LF-1-C1 1 3.81
1 2.30 1.2
2.30 1.5 6.86 m³ along axis-3
2.50 13.22 m³ LF1-C2 1 1.35
2 1.70 1.2
1.70 1.5 2.43 m³ along axis-3'
2.50 14.45 m³ LF2-C4 1 1.6
1 1.70 1.2
1.70 1.5 2.88 m³ along axis-4
2.50 7.23 m³ LF2-C8 1 3.61
1 1.70 1.2
1.70 1.5 6.50 m³ along axis-4'
2.50 7.23 m³ LF3 1 1.98
1 1.50 1.2
1.50 1.5 3.56 m³ along axis-b-c
2.50 5.63 m³ LF4 80.87 m³ Total
Prepared By:___________________ Checked By:____________________
Date &Sing:____________________ Date &Sing_____________________

Page 1
Takeoff Sheet
Project :- Residence (G+1)
Location :- AKSUM-
Client:- Timnit G/senbet kahsay
Consultant :- G4 Engineering PLC
T.G L*W*H Squ Unit Description T.G L*W*H Squ Unit Description
1.5. Back Fill 1 4.51
1 179.375 m³ Detto as pie Excavation 0.7 3.16 m² along axis-2
1 107.45 m³ Detto as Bulk Excavation 1 3.81
1 80.87 m³ Detto as Trench Excavation 0.7 2.67 m² along axis-3
Deduction 1 1.35
23.376 m³ Total volume of concrete for footing pad 0.7 0.95 m² along axis-3'
2.21 m³ Total volume of concrete for footing columen 1 1.6
40.97 m³ Total volume of Masonry wall 0.7 1.12 m² along axis-4
301.139 m³ Total Volume of Backfill 1 3.61
246.81 m³ 1.6 cartaway 0.7 2.53 m² along axis-4'
2.concrete work 1 1.98
2.1 lean concrete 0.7 1.39 m² along -4'
7 2 A. under footing pad 74.86 m² Total
2 28 m² F1 2.2 C-25 concrete
1 1.4 A for pad
1.4 1.96 m² F2 7 2
2 1.8 2
1.8 6.48 m² LF1 0.5 14 m³ F1
3 1.2 1 1.4
1.2 4.32 m² LF2 1.4
1 1.2 0.4 0.784 m³ F2
1.2 1.44 m² LF3 2 1.8
1 1 1.8
1 1 m² LF4 0.7 4.536 m³ LF1
1 6.51 3 1.2
B. under masonry 1.2
1 6.51 0.6 2.592 m³ LF2
0.7 4.557 m² along axis-D 1 1.2
1 7.48 1.2
0.7 5.236 m² along axis-C' 0.6 0.864 m³ LF3
1 1.13 1 1
0.7 0.791 m² along axis-C 1
1 3.33 0.6 0.6 m³ LF4
0.7 2.331 m² along axis-B 23.376 m³ Total
1 5.93 B for foundetion column
0.7 4.151 m² along axis-A 3 0.2
1 3.99 0.4
0.7 2.793 m² along axis-1 2 0.48 m³ F1-C1

Prepared By:___________________ Checked By:____________________


Date &Sing:____________________ Date &Sing_____________________

Page 2
Takeoff Sheet
Project :- Residence (G+1)
Location :- AKSUM-
Client:- Timnit G/senbet kahsay
Consultant :- G4 Engineering PLC
T.G L*W*H Squ Unit Description T.G L*W*H Squ Unit Description
1 0.2 1 5.13 Along axis-A
0.4 0.25
2 0.16 m³ F1-C3 0.4 0.513 m³ GFB7
3 0.3 1 6.29 Along axis-1
0.3 0.25
2 0.54 m³ F1-C6 0.4 0.629 m³ GFB8
1 0.2 1 11.11 Along axis-2
0.4 0.25
1 2.1 0.17 m³ F2-C1 0.4 1.11 m³ GFB9
0.2 1 10.86 Along axis-3
0.4 0.25
1.7 0.14 m³ LF1-C1 0.4 1.09 m³ GFB10
1 0.3 2 2.45 Along axis-3'
0.3 0.25
1.7 0.15 m³ LF1-C2 0.4 0.49 m³ GFB11
1 0.4 1 5.025 Along axis-4
0.4 0.25
1.8 0.29 m³ LF2-C8 0.4 0.5025 m³ GFB12
2 0.2 1 4.135 Along axis-4'
0.4 0.25
1.8 0.29 m³ LF2-C4 0.4 0.4135 m³ GFB13
2.21 m³ Total 9.16 m³ Total
2.3 Ground floor beam concrete work 2.4 Ground floor slab concrete
1 14.01 Along axis-D Total area of the ground floor
0.25 131.883 slab 131.883 m²
0.4 1.40 m³ GFB1 0.10 13.19 m³ Total
1 9.005 Along axis-C' 3 form work
0.25 A. forfooting pad
0.4 0.90 m³ GFB2 7 8.1
1 5.255 Along axis-C 0.5 28.35 m² F1
0.25 1 5.7
0.4 0.53 m³ GFB3 0.4 2.28 m² F2
1 10.93 Along axis-B 2 3.78
0.25 0.7 5.292 m² LF1
0.4 1.09 m³ GFB5 3 4.9
1 3.305 Along axis-B-C 0.6 8.82 m² LF2
0.25 1 4.9
0.4 0.33 m³ GFB4 0.6 2.94 m² LF3
1 5.8 Along axis-A 1 4.1
0.25 0.7 2.87 m² LF4
0.4 0.58 m³ GFB6 50.55 m² Total
Prepared By:___________________ Checked By:____________________

Page 3
Date & Sign:___________________ Date & Sign:____________________
Takeoff Sheet
Project :- Residence (G+1)
Location :- AKSUM-
Client:- Timnit G/senbet kahsay
Consultant :- G4 Engineering PLC
T.G L*W*H Squ Unit Description T.G L*W*H Squ Unit Description
B for foundetion column 1 4.8
3 1.3 0.4 1.92 m² along axis-3'
2 7.80 m² F1-C1 1 8.7
1 1.3 0.4 3.48 m² along axis-4
2 2.6 m² F1-C3 1 13.82
3 1.3 0.4 5.53 m² along axis-4'
2 7.8 m² F1-C6 69.31 m² Total
1 1.3 4.Hard Core
2.1 2.73 m² F2 1 129.676 Total area of hard core
1 1.3 0.25 32.42 m³ Total volme of hard core
1.7 2.21 m² LF1-C1 5. Masonry work
1 1.3 1 0.75 Along Axis -D
1.7 2.21 m² LF1-C2 8.01 6.01 m²
1 1.7 1 0.75 Along axis -C'
1.8 3.06 m² LF2-C8 5.78 4.34 m²
2 1.3 1 0.75 Along Axis-C
1.8 4.68 m² LF2-C4 2.13 1.60 m²
1 1.3 1 0.75 Along axis-B
1.8 2.34 m² LF3-C1 4.83 3.62 m²
1 1.7 1 0.75 Along Axis-A
1.8 3.06 m² LF4-C8 6.93 5.20 m²
35.43 m² Total 1 0.75 Along Axis-B&C
1 C form work for grade beeam 2.18 1.64 m²
26.97 1 0.75 Along Axis -1
1 0.4 10.79 m² along axis -D 4.44 3.33 m²
17.86 1 0.75 Along Axis-2
1 0.4 7.14 m² Along axis -c' 6.01 4.51 m²
9.535 1 0.75 Along Axis -3
1 0.4 3.81 m² Along-c 3.91 2.93 m²
20.16 1 0.75 Along Axis-3'
1 0.4 8.06 m² Along axis-B 1.6 1.20 m²
5.935 1 0.75 Along Axis-4
1 0.4 2.37 m² Along axis-B-C 2.1 1.58 m²
21.96 1 0.75 Along Axis-4'
1 0.4 8.784 m² Along axis-A 6.71 5.03
13.23 40.97 m² Total
1 0.4 5.292 m² Along axis-1
22.195
1 0.4 8.878 m² Along axis-2
21.92
0.4 8.77 m² Along axis-3
Prepared By:___________________ Checked By:____________________

Page 4
Date & Sign:___________________ Date & Sign:____________________
Takeoff Sheet
Project :- Residence (G+1)
Location :- AKSUM-
Client:- Timnit G/senbet kahsay
Consultant :- G4 Engineering PLC
T.G L*W*H Squ Unit Description T.G L*W*H Squ Unit Description
B SUPER STRUCTURE 1 12.03
1.CONCRETE WORK 0.3
1.2 Concrete work for column 0.3 1.0827 m³ FB4-Along axis-Along axis-B
10 0.2 1 11.16
0.4 0.275
2.76 2.21 m³ C1 0.55 1.68795 m³ FB5'' Along axis-A
2 0.3 1 5.33
0.3 0.3
2.76 0.50 m³ C2 0.3 0.48 m³ VERENDA
3 0.2 1 3.5
0.4 0.6
2.76 0.66 m³ C3 0.3 0.63 m³ FB6 Along axis-1
3 0.2 1 10.86
0.35 0.6
2.76 0.58 m³ C4 0.3 1.95 m³ FB7 Along axis-2
1 0.3 1 6.9
0.3 0.3
2.76 0.25 m³ C5 0.3 0.62 m³ FB7' Along axis-1-2
10 0.3 1 2.5
0.3 0.3
2.76 2.484 m³ C6 0.3 0.22 m³ FB8' Along axis-2-3
2 0.3 1 11.7
0.3 0.6
2.76 0.50 m³ C7 0.3 2.11 m³ FB8' Along axis-3
2 0.4 1 5.16
0.4 0.6
2.76 0.88 m³ C8 0.3 0.93 m³ FB9 Along axis-4
8.06 m³ Total 1 4.4
1.3 beam concrete work 0.6
1 5.07 0.3 0.79 m³ FB10 Along axis-4
0.3 1 4.4
0.3 0.46 m³ FB1 along axis-D 0.6
1 5.33 0.3 0.792 m³ FB10 along axis-4'
0.3 1 5.46
0.3 0.48 m³ fb1' along axis-D 0.3
1 9.28 0.2 0.3276 m³ FB9' Along axis-4'
0.3 13.88 m³ Total
0.3 0.84 m³ FB2 along axis-C' 1.4 Edge beam
1 5.33 1 3.6
0.3 0.2
0.3 0.48 m³ FB3-Along axis-C 0.3 0.22 m³ Along axis-2-3
1 2.18
Prepared By:___________________ Checked By:____________________

Page 5
Date & Sign:___________________ Date & Sign:____________________
Takeoff Sheet
Project :- Residence (G+1)
Location :- AKSUM-
Client:- Timnit G/senbet kahsay
Consultant :- G4 Engineering PLC
T.G L*W*H Squ Unit Description T.G L*W*H Squ Unit Description
0.2 1 4.525 RB-10 Along axis -4'
0.3 0.13 m³ Along axis-1-2 0.25
1 4.383 0.35 0.40 m³
0.2 1 5.535 RB-11 Along axis -4-4'
0.3 0.26298 m³ Along axis-3-4 0.25
0.61 m³ Total 0.35 0.4843125 m³
1.5 For Top Tile Beam 2 4.34 RB-12 above +11.12
2 5.23 RB-1 Along axis-D&C 0.25
0.25 0.35 0.7595 m³
0.35 0.91525 m³ 2 2.4 RB-13 above +11.12
1 7.3 RB-2 Along axis -C' 0.25
0.25 0.35 0.42 m³
0.35 0.64 m³ 9.38 m³ Total
1 12.03 RB-3 Along axis-B 1 1.6 First Floor Slab
0.25 68.15
0.35 1.05 m³ 0.15 10.2225 m³ Total volume of floor slab
1 10.67 RB-4Along axis-A 1.7 Roof Slab
0.25 9.43
0.35 0.93 m³ 0.15 1.4145 m³ Total volume of Roof slab at +8.18
1 4.295 RB-5 Along axis-A 11.64 m³ Total
0.25 1.8 Stair Case
0.35 0.375813 m³ Landing Beam
1 8.363 RB-6 Along axis -2 1 2.5 SCB-1 Along axis -4
0.25 0.25
0.35 0.73 m³ 0.4 0.25 m³ Total
1 4.1 RB-6' Along axis -1&2 1 2.5 landing
0.25 0.74
0.35 0.36 m³ 0.17 0.3145 m³ Total
1 4.035 RB-7 Along axis -2-3 bottom flight
0.25 1 3.08
0.35 0.353063 m³ 1.2
1 10.11 RB-8 Along axis -3 0.17 0.62832 m³ along section 1-1&2-2
0.25 0.62832 m³ Total
0.35 0.884625 m³ steps
1 12.26 RB-9 Along axis -4 9 0.023
0.25 1.2 0.2484 m³ section 1-1
0.35 1.07275 m³
Prepared By:___________________ Checked By:____________________

Page 6
Date & Sign:___________________ Date & Sign:____________________
Takeoff Sheet
Project :- Residence (G+1)
Location :- AKSUM-
Client:- Timnit G/senbet kahsay
Consultant :- G4 Engineering PLC
T.G L*W*H Squ Unit Description T.G L*W*H Squ Unit Description
9 0.023 2 1.3
1.2 0.2484 m³ section 2-2 2.7 7.02 m² C7
0.4968 m³ Total 2 1.7
1.9.Gutter 2.76 9.384 m² C8
1 5.23 Along Axis-D 114.036 m² Total
0.14 0.72 m³ B for intermidet beam
1 7.05 Along Axis-C' 1 13.16 FB -1
0.14 0.97 m³ 0.395 5.1982 m² Along axis-D
1 1.40 Along Axis-B 1 13.74 FB -1'
0.14 0.19 m³ 0.395 5.4273 m² Along axis-D
1 5.65 Along Axis-A 1 23.04 FB-2
0.14 0.77 m³ 0.65 14.976 m² Along axis-C
1 5.33 Along axis belo- A 1 12.89 FB-3
0.14 0.73 m³ 0.65 8.3785 m² Along axis-C
1 4.85 Along axis-1 1 31.09 FB-4
0.14 0.66 m³ 0.65 20.2085 m² Along axis-B
1 4.31 Along axis-2 1 5.33 FB-5'
0.14 0.59 m³ 0.395 2.10535 m² Along axis-A
1 4.40 Along axis-3 1 27.79 FB-5''
0.14 0.60 m³ 0.395 10.97705 m² Along axis-A
1 13.51 Along Axis -4' 1 10.7 FB-6
0.14 1.85 m³ 0.395 4.2265 m² Along axis-1
7.09 m³ Total 1 33.33 FB7
2 formwork 0.65 21.6645 m² Along axis-2
A for elvation column 1 21.53 FB7'
10 1.3 0.395 8.50435 m² Along axis-1-2
2.76 35.88 m² C1 1 36.93 FB-8
0.65 24.0045 m² Along axis-3
2 1.3 1 15.63 FB-9
2.76 5.52 m² C2 0.65 10.1595 m² Along axis-4
2 1.3 1 17.13 FB-9'
2.76 7.176 m² C3 0.395 6.76635 m² Along axis-4-4'
3 1.2 1 13 FB-10
2.76 9.936 m² C4 0.65 8.45 m² Along axis-4
1 1.2 1 14.1 FB-10'
2.7 3.24 m² C5 0.65 9.165 m² Along axis-4
10 1.3 160.2116 m² Total
2.76 35.88 m² C6 C.for edge beam

Prepared By:___________________ Checked By:____________________

Page 7
Date & Sign:___________________ Date & Sign:____________________
Takeoff Sheet
Project :- Residence (G+1)
Location :- AKSUM-
Client:- Timnit G/senbet kahsay
Consultant :-G4 Engineering PLC
T.G L*W*H Squ Unit Description T.G L*W*H Squ Unit Description
1 10.83 EB-1 1 7 RB-13
0.395 4.27785 m² Along axis -2-3 0.85 5.95 m² Along axis-4
1 8.667 EB-2 272.9015 m² Total
0.395 3.423465 m² Along axis -1-2 E. form work for slab
1 12.346 EB-3 1 63.81 m² for slab
0.395 4.87667 m² Along axis-A-B 1 3.87 for slab of +8.18
12.57799 m² Total 2.6 10.062 m²
D.For Top Tile Beam 73.872 Total formwork of slab
1 14.565 RB-1 F. for stair case
1 14.565 m² Along axis-D For Landing Beam
1 21.957 RB-2 1 8.1 scB1
1 21.957 m² Along axis-c' 0.395 3.1995 m² Total
1 33.11 RB-3 Soffit form work
1 33.11 m² Along axis-B 1 2.5
1 13.965 RB-1 0.74 1.85 m² for landing
1 13.965 m² Along axis-C 2 3.1 For B.Flight along section 1-1 & 2-2
1 28.804 m² RB-4 1.2 7.44 m²
1 28.804 m² Along axis-A 9.29 m² Total
1 14.431 RB-5 For Steps
1 14.431 m² Along axis-blow-A Area of one Step=0.24 m²
1 25.105 RB-6 36 0.023 0.828 m² Along Section 1-1 & 2-2
1 25.105 m² Along axis-2 0.828 m² Total
1 12.03 RB-7 Side Form work for the flight
1 12.03 m² Along axis-b/n 2&3 4 3.1 Along section 1-1 and 2-2
1 36.67 RB-8 0.17 2.108 m² Total
1 36.67 m² Along axis-3 For Risers
1 36.78 RB-9 20 1.2 Along section 1-1 and 2-2
1 36.78 m² Along axis-4 0.15 3 m² Total
1 3.95 RB-10 G.formwork for gutter
1 3.95 m² Along axis-4' 8.61 m² Along axis-D
1 16.58 RB-11 11.57 m² Along axis-C'
1 16.58 m² Along axis-4' 2.41 m² Along axis-B
1 12.26 RB-12 9.29 m² Along axis-A
0.85 10.421 m² Along axis-C 7.94 m² Along axis-1
1 12.36 RB-12 7.13 m² Along axis-2
0.85 10.506 m² Along axis-B 7.27 m² Along axis-3
1 7.05 RB-13 22.05 m² Along axis-4'
0.85 5.9925 m² Along axis-3 76.27 m² Total

Prepared By:___________________ Checked By:____________________

Page 8
Date & Sign:___________________ Date & Sign:____________________
Takeoff Sheet
Takeoff Sheet
Project :- Residence (G+1)
Location :- AKSUM-
Client:- Timnit G/senbet kahsay
Consultant :- G4 Engineering PLC
3.Block Work 3.2.For the First Floor
3.1.For the Ground Floor i. 20 cm thick HCB
i. 20 cm thick HCB A.External
A.External 1 35.46
1 29.14 2.76 97.8696 m²
2.76 80.4264 m² B.Internal
B.Internal 1 25.13
1 16.72 2.76 69.3588 m²
2.76 46.1472 m² 167.2284 m² Total
126.5736 m² Deducation
Deduction for Door and Window 5 0.9
1 0.9 2.1 9.45 m² Door
2.1 1.89 m² Door 2 0.86
1 0.1 0.6 1.032 m² window
0.6 0.06 m² window 2 0.76
1 1.5 0.6 0.912 m² window
1.6 2.4 m² window 11.394 m² Total
4.35 m² Total 155.8344 m² Net Area of 20cm HCB
122.2236 m² Net Area of 20cm HCB ii. 15Cm thick HCB
ii. 15Cm thick HCB A.Internal
A.Internal 1 24.13
1 8.93 2.76 66.5988 m²
2.76 24.6468 m² Deducation
Deduction 3 2.1
3 0.9 0.9 5.67 m² door
2.1 5.67 m² Door 1 1.25
1 1.5 2.1 2.625 m² door
1.6 2.4 m² window 1 1.5
8.07 m² Total 1.6 2.4 m² window
16.5768 m² Net Area of 15cm HCB 10.695 m² Total
iii. 10cm thick 55.9038 m² Net Area of 15cm HCB
External iii. 10 Cm thick HCB
1 3.62 1 External
2.76 9.9912 m² 8.51
internal 2.76 23.4876 m² Total
1 5.85
2.76 16.146 m²
26.1372 m² Total

Prepared By:___________________ Checked By:____________________

Page 9
Date & Sign:___________________ Date & Sign:____________________
Takeoff Sheet
Takeoff Sheet
Project :- Residence (G+1)
Location :- AKSUM-
Client:- Timnit G/senbet kahsay
Consultant :- G4 Engineering PLC
4. Roof work 12 3.75 45 ml Vertical for Right Side
A. Along the left direction to the 12 6.51 78.12 ml Diagonal for Right side
front elevation direction having 257.28 ml Total
1 99.04 m² 5cm overlap in both directions. C. zigba purlin with 90cm
B. Along the Right direction to the spacing
front elevation direction having 16 14.11 225.76 ml Total
1 101.981 m² 5cm overlap in both directions. D. 8cm thick chipwood
201.021 m² Total area of decra required 1 Axis (D,C&3,4)
4.2.Gutter 4.577
Along axis -D 8.9 40.7353 m²
1 5.228 ml 1 Axis (C',B&1,2)
Along axis- C' 1.15
1 7.05 ml 4.202 4.8323 m²
Along axis-B Axis (C',B&2,3)
1 1.4 ml 1 5.348
Along axis-A 4.202 22.472296 m²
1 5.65 ml Axis (C,B&3,3')
Along axis-Below A 1 3.896
1 5.33 ml 2.45 9.5452 m²
Along axis-1 Axis (B,A&2,3)
1 4.85 ml 1 5.098
Along axis-2 8.016 40.865568 m²
1 4.31 ml Axis (B,A&3,4)
Along axis-3 1 3.896
1 4.4 ml 4.008 15.615168 m²
Along axis-4' Axis (B,A)
1 13.51 ml 1 0.382
51.728 ml Total 4.008 1.531056 m²
4.3 down pipe Axis (A&3,3')
9 6.18 55.62 Total 1 4.278
5.Carpentry and Joinery work 2.4 10.2672 m²
5.1 Truss and stractural members 145.864088 m² Total
A. dia 10-12cm eucalyptus for a 6. Metal Work for hand rail and stair
12 7.009 84.108 ml total of trusses having 1200 mm 6.1 Alumium hand rail
12 7.228 86.736 spacing 1 10.464 10.464 m² Total
ml Total Inclined truss meember 6.2 for stair case
12 13.81 165.72 ml Total horizontal truss member 1 2.21
336.564 ml Total 0.88 1.9448 m² along section 1-1
B.dia 8-10 cm eucalyptus 1 2.21

Page 10
12 4.59 55.08 ml Vertical for Left Side 0.88 1.9448 m² along section 2-2
12 6.59 79.08 ml Diagonal for Left side 14.3536 m² Total

Prepared By:___________________ Checked By:____________________


Date & Sign:___________________ Date & Sign:____________________
Takeoff Sheet
Project :- Residence (G+1)
Location :- AKSUM-
Client:- Timnit G/senbet kahsay
Consultant :- G4 Engineering PLC

L*W*H Squ Unit Description T.G L*W*H Squ Unit Description


7. Frame work for window 1 0.8 W(0.8*0.8)
and door 0.8 0.64 m²
7.1. Aluminum door and windows 1 0.9 Door
a. For the Ground floor 2.1 1.89 m²
2 1 W(1.0*1.2) 27.0196 m² total
1.2 1.2 m² 54.0196 m² total aluminum
1 1.5 W(1.50*1.50) 7.2 Woden doors
1.5 4.5 m² a. For the Ground floor
2 2.05 W(2.05*1.50) 1 0.9 D(2.1*0.9)
1.5 3.075 m² 2.1 1.89 m²
1 2.6 W(2.6*1.50) 1 0.8 D(2.1*0.8)
1.5 7.8 m² 2.1 1.68 m²
1 0.75 W(0.75*0.6) b for first floor
0.6 0.45 m² 7 0.9 D(2.1*0.9)
1 1.45 W(1.45*1.50) 2.1 13.23 m²
1.5 2.175 m² 16.8 m² total
1 1.63 W(1.63*1.50) 8. Finishing Works
1.5 2.445 m² 8.1. Plastering
1 1.65 D(1.65*2.1) A. Three coat of Ext. Wall Plastering
2.1 3.465 m² 1 38.36 200mm thick Including columen face.
0.9 D(0.9*2.1) 3.06 117.3816 m² For the Ground floor includign the FB face

2.1 1.89 m² 1 49.17 For the First Floor including the RB face

27 m² total 3 147.51 m² B. Three coat of Int.Wall Plastering


b. for first floor 200 mm thick Including columen face.

3 2.5 W(2.5*1.5) 1 34.37 i.For the Ground floor includign 0.25 cm

1.5 3.75 m² 3.06 105.1722 m² of the FB thickness.


1 0.9 W(0.9*0.9) 1 52.51 ii. For the First Floor including the RB

0.9 2.43 m² 2.95 154.9045 m² C. Three coat of soffit floor and roof slabs
1 1.15 W(1.15*1.5 1 68.15 m² Total area of plastering
1.5 1.725 m² 593.1183 total
1 0.66 W(0.66*0.7) 8.2. Painting
0.7 0.462 m² 264.8916 m² A. External wall painting including
1 2.09 W(2.09*1.50) outerface of columen Detto as
1.5 3.135 m² External wall Plastering for the
1 0.86 W(0.86*0.9) ground and first floors.
0.9 0.774 m² 260.0767 m² B.Internal wall painting including
1 3.61 W(3.61*2.76) inner face of columen Detto as
2.76 9.9636 m² internal wall plastering for both
1 1.5 W(1.5*1.5) first and ground floors.
1.5 2.25 m²

Page 11
Takeoff Sheet
Takeoff Sheet
Project :- Residence (G+1)
Location :- AKSUM-
Client:- Timnit G/senbet kahsay
Consultant :- G4 Engineering PLC

1 L*W*H Squ Unit Description T.G L*W*H Squ Unit Description


1 68.15 m² C.soffit slab painting detto as
plastering floor and roof slab.
1 593.1183 m² Total
8.3. Floor Finishing
m² A. Non slipperyCeramic tiles floor finish
1 40.17 m² For the ground floor
36.75 m² For the First floor
76.92 m² Total
B.parquet tile floor finish
1 37 m² For the ground floor
68.06 m² For the first floor
105.06 m² Total
9. Glazzing work
9.1. 5cm thick tilted glass
1 Detto as aluminum door and
54.0196 m² windows area

Prepared By:___________________ Checked By:____________________


Date & Sign:___________________ Date & Sign:____________________
Takeoff Sheet
Takeoff Sheet
Project :- Residence (G+1)
Location :- AKSUM-
Client:- Timnit G/senbet kahsay
Consultant :- G4 Engineering PLC

Page 12
1 L*W*H Squ Unit Description T.G L*W*H Squ Unit Description

Prepared By:___________________ Checked By:____________________


Date & Sign:___________________ Date & Sign:____________________

Page 13
Page 14
(54.33)

Page 15
Bar Schedule
Project :- Residence (G+1)
Location:- AKSUM
Client:- Timnit G/senbet kahsay
:- Ephi Engineering
Consultant Consultant PLC PLC
:- Y G4 Engginering
Type of No of Total length
Item Location Dia No.bar T.Length Shape
stracture Element Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20

1 F1 12 22 7 2.7 --- 415.80


2 F2 12 16 1 1.9 --- 30.40
3 c 14 26 2 2.7 --- 140.40
LF1
4 c' 14 4 2 2.181 --- 17.45
5 Footing Pad d 14 14 3 2.1 --- 88.20
LF 2
6 d' 14 4 3 1.586 --- 19.03
7 e 14 14 1 2.3 --- 32.20
LF3
8 e' 14 4 1 1.586 --- 6.34
9 f 14 12 1 1.3 --- 15.60
LF4
10 f' 14 4 1 1.389 --- 5.56
11 C1 16 12 5 4.3 --- 258.00
12 STIRRUP 8 11 5 0.9 --- 49.50
13 C2 16 8 1 4.3 --- 34.40
14 STIRRUP 8 11 1 0.9 --- 9.90
15 Foundation C3 16 12 1 4.3 --- 51.60
16 Columen STIRRUP 8 11 1 0.9 --- 9.90
17 C4 16 4 3 4.3 --- 51.60
18 STIRRUP 8 11 3 0.9 --- 29.70
19 C6 16 8 3 3.9 93.60
20 STIRRUP 8 11 2 0.9 --- 19.80

Total length(m) 0.00 118.80 446.20 324.78 489.20 0.00


Unit Weight(Kg) 0.222 0.395 0.617 0.888 1.208 1.578 2.466
Total weight(Kg) 0.00 46.93 396.23 392.33 771.96 0.00
Prepared By:___________________ Checked By:____________________
Date & Sign:___________________ Date & Sign:____________________
Bar Schedule
Project :- Residence (G+1)
Location :- AKSUM
Client:- Timnit G/senbet kahsay
G4 yalfal Engineering
Consultant :- Engginerig PLC PLC
Type of No of Total length
Item Location Dia No.bar T.Length Shape
stacture Element Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20
21 C8 16 4 2.00 3.9 --- 31.20
22 STIRRUP 8 11 2.00 1.3 --- 28.60
23 TOP 14 3 1 17 --- 51.00
GFB1
24 BOTTOM 14 3 1 17.8 --- 53.40
25 Grade STIRRUP 8 64 1 1 --- 64.00
26 Beam TOP 14 3 1 9.53 --- 28.59
GFB2
27 BOTTOM 14 3 1 9.53 --- 28.59
28 STIRRUP 8 41 1 1 --- 41.00
29 GFB3 14 3 2 5.73 --- 34.38
30 STIRRUP 8 24 1 1 --- 24.00
31 GFB4 14 3 2.00 3.8 --- 22.80
32 STIRRUP 8 14 1.00 1 14.00
33 TOP 14 3 1.00 12.3 36.90
GFB5
34 BOTTOM 14 3 1.00 11.8 35.40
35 STIRRUP 8 52 1.00 1 --- 52.00
36 GFB6 14 3 2.00 5.83 --- 34.98
37 STIRRUP 8 23 1.00 1 --- 23.00
38 GFB7 14 3 2.00 6.52 --- 39.12
39 STIRRUP 8 27 1.00 1 --- 27.00
40 GFB8 14 3 2.00 7.85 --- 47.10
41 STIRRUP 8 33 1.00 1 --- 33.00

Total length(m) 306.60 0.00 412.26 31.20


Unit Weight(Kg) 0.222 0.395 0.617 0.888 1.208 1.578 2.466
Total weight(Kg) 0.00 121.11 0.00 0.00 498.01 0.00
Prepared By:___________________ Checked By:____________________
Date & Sign:___________________ Date & Sign:____________________
Bar Schedule
Project :- Residence (G+1)
Location :- AKSUM
Client:- Timnit G/senbet kahsay
yalfal Engineering
Consultant :-G4 Engginering PLC PLC
Type of Location No of Total length
Item Dia No.bar T.Length Shape
stacture Element Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20
1 TOP 14 3 1.00 13.4 --- 40.20
2 GFB9 BOTTOM 14 3 1.00 12.9 38.70
3 STIRRUP 8 54 1.00 1 --- 54.00
4 TOP 14 3 1 13.4 --- 40.20
GFB10
BOTTOM 14 3 1 12.9 --- 38.70
Grade STIRRUP 8 55 1 1 --- 55.00
Beam GFB11 14 3 4 3.43 --- 41.16
STIRRUP 8 12 1 1 --- 12.00
GFB12 14 3 2 5.6 --- 33.60
STIRRUP 8 24 1 1 --- 24.00
GFB13 14 3 2 5.1 30.60
STIRRUP 8 20 1 1 20.00
Between a 8 11 1 2.83 31.13
(1,2)(D,C') b 8 12 1 2.65 --- 31.80
Between a 8 11 1 5.425 --- 59.68
Ground (2,3)(D,C) b 8 22 1 2.65 --- 58.30
floor Bteween a 8 19 1 3.695 --- 70.21
slab (3,4)(D,C) b 8 15 1 4.525 --- 67.88
Bteween a 8 15 1 2.83 --- 42.45
(1,2)(C',B) b 8 12 1 3.69 --- 44.28

Total length(m) 570.72 0.00 263.16 0.00


Unit Weight(Kg) 0.222 0.395 0.617 0.888 1.21 1.578 2.466
Total weight(Kg) 0.00 225.43 0.00 0.00 318.42 0.00
Checked By:____________________
Date & Sign:____________________

Date & Sign:___________________ Date & Sign:____________________


Bar Schedule
Project :- Residence (G+1)
Location :- AKSUM
Client:- Timnit G/senbet kahsay
Consultant G4 yalfal Engineering
:- Engineerig PLC PLC
Type of No of Total length
Item Location Dia No.bar T.Length Shape
stacture Element Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20
1 Between a 8 18 1 5.425 --- 97.65
2 (2,3)(C',B) b 8 22 1 4.375 96.25
3 Between a 8 10 1 2.779 --- 27.79
4 (3,3')(C,B) b 8 12 1 2.45 --- 29.40
Between a 8 10 1 1.725 --- 17.25
(3',4')(C,B) b 8 7 1 2.45 --- 17.15
Between a 8 15 1 5.425 --- 81.38
(2,3)(B,A) b 8 22 1 3.685 --- 81.07
Between a 8 15 1 4.855 --- 72.83
(3,4')(B,A) b 8 20 1 3.685 --- 73.70
Between a 8 19 1 0.778 14.78
(4,4')(D,C) b 8 4 1 4.525 18.10
a 8 9 1 3.63 32.67
Verenda b 8 15 1 2.2 --- 33.00
---
---
---
---
---
---

Total length(m) 693.01 0.00 0.00 0.00


Unit Weight(Kg) 0.222 0.395 0.617 0.888 1.21 1.578 2.466
Total weight(Kg) 0.00 273.74 0.00 0.00 0.00
Checked By:____________________
Date & Sign:____________________
Date & Sign:___________________ Date & Sign:____________________
Bar Schedule
Project :- Residence (G+1)
Location :- AKSUM
Client:- Timnit G/senbet kahsay
Consultant G4 yalfal Engineering
:- Enginnering PLC PLC
Type of No of Total length
Item Location Dia No.bar T.Length Shape
stacture Element Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20
1 C1 16 12 5 4 240.00
2 STIRRUP 8 15 1 1.1 16.50
3 C2 16 8 1 4 32.00
4 STIRRUP 8 15 1 1.1 16.50
C3 16 12 1 4 --- 48.00
Ground STIRRUP 8 15 1 1.1 --- 16.50
floor C4 16 4 3 4 --- 48.00
Elevation STIRRUP 8 15 1 1.1 --- 16.50
Columen C5 16 8 1 3.4 --- 27.20
STIRRUP 8 15 1 1.1 --- 16.50
C6 16 8 3 4 96.00
STIRRUP 8 15 1 1.1 16.50
C7 16 8 1 4.45 35.60
STIRRUP 8 15 1 1.1 --- 16.50
C8 16 4 2.00 3.2 --- 25.60
STIRRUP 8 15 1.00 1.5 --- 22.50
---
---
---
---

Total length(m) 138.00 0.00 0.00 552.40


Unit Weight(Kg) 0.222 0.395 0.617 0.888 1.21 1.578 2.466
Total weight(Kg) 0.00 54.51 0.00 0.00 871.69 0.00
Checked By:____________________
Date & Sign:____________________
Bar Schedule
Project :- Residence (G+1)
Location :- AKSUM
Client:- Timnit G/senbet kahsay
Consultant G4 yalfal Engineering
:- Engineering PLC PLC
Type of No of Total length
Item Location Dia No.bar T.Length Shape
stacture Element Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20
1 C1 16 12 5 3.15 189.00
2 First STIRRUP 8 15 5 1.1 82.50
3 floor C2 16 8 1 3.15 25.20
4 Elevation STIRRUP 8 15 1 1.1 16.50
Columen C3 16 12 1 4 --- 48.00
STIIRRUP 8 15 1 1.1 --- 16.50
C6 16 8 3 4 --- 96.00
STIRRUP 8 15 3 1.1 --- 49.50
C7 16 8 1 3.15 --- 25.20
STIRRUP 8 15 1 1.1 --- 16.50
C3 16 12 1 2.6 31.20
For +8.48 STIRRUP 8 12 1 1.1 13.20
C6 16 8 3 3.6 86.40
STIIRRUP 8 12 3 1.1 --- 39.60
---
---
---
---
---
---

Total length(m) 234.30 0.00 0.00 501.00


Unit Weight(Kg) 0.222 0.395 0.617 0.888 1.21 1.578 2.466
Total weight(Kg) 0.00 92.55 0.00 0.00 790.58 0.00
Checked By:____________________
Date & Sign:____________________
Bar Schedule
Project :- Residence (G+1)
Location :- AKSUM
Client:- Timnit G/senbet kahsay
Consultant G4 yalfal Engineering
:- Engineerig PLC PLC
Type of No of Total length
Item Location Dia No.bar T.Length Shape
stacture Element Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20
1 Top 14 3 1 5.4 16.20
2 FB-1 Bottom 14 3 1 9.2 27.60
3 floor Nagative 14 1 1 3.1 3.10
4 BEAM STIRRUP 16 8 1 4 32.00
FB-1' 14 3 2 5.68 --- 34.08
STIRRUP FB-1' 8 19 1 3.1 --- 58.90
main 14 3 2 9.6 --- 57.60
FB-2
Nagative 14 2 1 2.9 --- 5.80
STIRRUP 8 44 1 1.3 --- 57.20
FB-3 14 3 2 5.53 --- 33.18
STIRRUP 8 23 1 1.3 29.90
TOP 14 3 1 13.2 39.60
Bottom 14 3 1 12.7 38.10
14 2 1 5.4 --- 10.80
FB-4 Nagative 16 2 1 3.3 --- 6.60
STIRRUP 8 56 1 1.3 --- 72.80
FB-5' 14 3 2.00 5.55 --- 33.30
STIRRUP 8 27 1.00 1.3 --- 35.10
---
---

Total length(m) 253.90 0.00 299.36 38.60


Unit Weight(Kg) 0.222 0.395 0.617 0.888 1.21 1.578 2.466
Total weight(Kg) 0.00 100.29 0.00 0.00 362.23 60.91 0.00
Checked By:____________________
Date & Sign:____________________
Bar Schedule
Project :- Residence (G+1)
Location :- AKSUM
Client:- Timnit G/senbet kahsay
yalfal Engineering
Consultant :-G4 Engineerig PLC PLC
Type of No of Total length
Item Location Dia No.bar T.Length Shape
stacture Element Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20
1 Top
2 FB-5'' Bottom
3 floor Nagative
4 BEAM STIRRUP
FB-6 14 3 2 4.4 --- 26.4
STIRRUP 8 17 1 1.3 --- 22.1
Top 16 3 1 13.2 --- 39.6
16 2 1 3 --- 6
FB-7
Bottom 16 4 1 12.7 --- 50.8
Nagative 20 2 1 5.5 --- 11
STIRRUP 8 61 1 1.3 79.3
TOP 16 3 1 7.8 23.4
Bottom 16 4 1 7.8 31.2
FB-7' Nagative 16 2 1 4.5 --- 9
STIRRUP 8 50 1 1.3 --- 65
16 3 1 14.7 --- 44.1
16 1 1.00 4.5 --- 4.5
Top 20 2 1.00 4.5 --- 9
FB-8 Bottom 16 6 1.00 14.2 --- 85.2
---

Total length(m) 192.80 0.00 0.00 293.80 20.00


Unit Weight(Kg) 0.222 0.395 0.617 0.888 1.21 1.578 2.466
Total weight(Kg) 0.00 192.80 0.00 0.00 463.62 49.32
Checked By:____________________
Date & Sign:____________________
Bar Schedule
Project :- Residence (G+1)
Location :- AKSUM
Client:- Timnit G/senbet kahsay
yalfal Engineering
Consultant :-G4 Engineerig PLC PLC
Type of No of Total length
Item Location Dia No.bar T.Length Shape
stacture Element Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20
1 Nagative 16 2 1 2.3 4.60
2 FB-8 20 4 1 2.5 10.00
3 floor 20 3 1 1.9 5.70
4 BEAM STIRRUP 8 64 1 1.3 83.20
main 16 3 2 6.4 --- 38.40
FB-9 Nagative 16 3 1 2.7 --- 8.10
STIRRUP 8 28 1 1.3 --- 36.40
main 16 3 2 4.8 --- 28.80
FB-9'
Nagative 16 2 1 3.4 --- 6.80
STIRRUP 8 44 1 1.3 --- 57.20
TOP 16 3 1 5.3 15.90
Bottom 16 4 1 5.3 21.20
FB-10 Nagative 16 2 1 1.9 3.80
STIRRUP 8 23 1 1.3 29.90
FB-10' 16 3 2 5.3 --- 31.80
STIRRUP 8 34 1 1.3 --- 44.20
FB-8' 16 3 2.00 3.4 --- 20.40
STIRRUP 8 21 1.00 1.3 --- 27.30
---
---

Total length(m) 278.20 0.00 0.00 179.80 15.70


Unit Weight(Kg) 0.222 0.395 0.617 0.888 1.21 1.578 2.466
Total weight(Kg) 0.00 109.89 0.00 0.00 283.72 38.72
Checked By:____________________
Date & Sign:____________________
Bar Schedule
Project :- Residence (G+1)
Location :- AKSUM
Client:- Timnit G/senbet kahsay
G4 yalfal Engineering
Consultant :- Engineerig PLC PLC
Type of No of Total length
Item Location Dia No.bar T.Length Shape
stacture Element Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20
1 RB-1 14 3 4 5.53 66.36
2 STIRRUP 8 23 1 1.1 25.30
3 ROOF RB-2 14 3 2 7.6 45.60
4 BEAM STIRRUP 8 34 1 1.1 37.40
TOP 14 3 1 11.8 --- 35.40
RB-3 Bottom 14 3 1 11.3 --- 33.90
STIRRUP 8 56 1 1.1 --- 61.60
TOP 14 3 1 11.8 --- 35.40
RB-4
Bottom 14 3 1 11.3 --- 33.90
STIRRUP 8 48 1 1.3 --- 62.40
RB-5 14 3 2 4.6 27.60
STIRRUP 8 22 1 1.1 24.20
RB-6 14 3 2 9.43 56.58
STIRRUP 8 42 1 1.1 46.20
RB-7 14 3 2 4.8 --- 28.80
STIRRUP 8 23 1 1.1 --- 25.30
TOP 14 3 1 14.65 --- 43.95
RB-8 Bottom 14 3 1 1.1 --- 3.30
STIRRUP 8 64 1 1.1 --- 70.40
---

Total length(m) 352.80 0.00 410.79 0.00


Unit Weight(Kg) 0.222 0.395 0.617 0.888 1.21 1.578 2.466
Total weight(Kg) 0.00 139.36 0.00 0.00 497.06 0.00
Checked By:____________________
Date & Sign:____________________
Bar Schedule
Project :- Residence (G+1)
Location :- AKSUM
Client:- Timnit G/senbet kahsay
yalfal Engineering
Consultant :-G4 Engineerig PLC PLC
Type of Location No of Total length
Item Dia No.bar T.Length Shape
stacture Element Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20
1 TOP 14 3 1 13.2 39.60
RB-9
RB-9
2 Bottom 14 3 1 14.15 42.45
3 ROOF STIRRUP 8 65 1 1.1 71.50
4 BEAM RB-10 14 3 2 5.3 31.80
STIRRUP 8 26 1 1.5 --- 39.00
RB-11 14 3 2 6.33 --- 37.98
STIRRUP 8 31 1 1.1 --- 34.10
RB-12 14 3 4 4.63 --- 55.56
STIRRUP 8 18 1 1.1 --- 19.80
RB-13 14 3 4 3.3 --- 39.60
STIRRUP 8 13 1 1.1 14.30
AXIS (1,2)& 1 8 14 1 6.47 90.58
2 10 14 1 1.68 23.52
3 8 15 1 6.98 104.70
First 4 10 15 1 1.18 --- 17.70
Floor 5 8 24 1 6.198 --- 148.75
Solid 6 8 24 1 6.66 --- 159.84
Slab 7 10 24 1 1.61 --- 38.64
8 8 35 1 12.02 --- 420.70
9 10 35 1 2.99 --- 104.65

Total length(m) 1103.27 184.51 0.00 246.99 0.00


Unit Weight(Kg) 0.222 0.395 0.617 0.888 1.21 1.578 2.466
Total weight(Kg) 0.00 435.79 113.84 0.00 298.86 0.00
Checked By:____________________
Date & Sign:____________________
Bar Schedule
Project :- Residence (G+1)
Location :- AKSUM
Client:- Timnit G/senbet kahsay
G4 yalfal Engineering
Consultant :- Engineerig PLC PLC
Type of No of Total length
Item Location Dia No.bar T.Length Shape
stacture Element Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20
1 First 10 8 44 1 9.156 402.86 402.86
2 Floor 11 8 21 1 14.13 296.73 296.73
3 Solid 12 8 7 1 8.17 57.19
4 Slab 13 8 6 1 7.81 46.86 46.86
13' 8 2 1 8.12 --- 16.24
13'' 8 8 1 8.08 --- 64.64
13''' 8 6 1 8.42 --- 50.52
14 10 26 1 2.04 --- 53.04 53.04
15 8 5 1 5.11 --- 25.55
16 10 5 1 1.96 --- 9.80 9.80
17 8 9 1 4.81 43.29
18 8 5 1 9.85 49.25
19 10 5 1 2.47 12.35 12.35
Stair sec 1-1 1 14 6 1 5.84 35.04
Case 2 8 10 1 2.02 --- 20.2
3 8 10 1 1.95 --- 19.5
4 14 6 1 2.02 --- 12.12
5 14 6 1 1.15 --- 6.90
---
---

Total length(m) 1045.97 75.19 0.00 875.70 0.00


Unit Weight(Kg) 0.222 0.395 0.617 0.888 1.21 1.578 2.466
Total weight(Kg) 0.00 413.16 46.39 0.00 1059.60 0.00
Checked By:____________________
Date & Sign:____________________
Bar Schedule
Project :- Residence (G+1)
Location :- AKSUM
Client:- Timnit G/senbet kahsay
G4 yalfal Engineering
Consultant :- Engineerig PLC PLC
Type of No of Total length
Item Location Dia No.bar T.Length Shape
stacture Element Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20
1 Stair sec 2-2 1 14 6 1 6.5 39.00
2 Case 2 8 9 1 1.95 17.55
3 3 8 9 1 1.95 17.55
4 4 14 6 1 1.9 11.40
5 14 6 1 1 --- 6.00
stair B-1 STB-1 1 16 3 2 3.65 --- 21.90
Stirrup 1 8 20 1 1.3 --- 26.00
Gutter axis-D 1 12 38 1 2.75 --- 104.50
2 12 38 1 8.5 --- 323.00
Axis-C' 1 12 48 1 2.75 --- 132.00
2 12 48 1 8.5 408.00
Axis-B 1 12 10 1 2.75 27.50
2 12 10 1 8.5 85.00
Axis-A 1 12 39 1 2.75 107.25
2 12 39 1 8.5 --- 331.50
sex-1 1 12 34 1 2.75 --- 93.50
2 12 34 1 8.5 --- 289.00
sec -2 1 12 30 1 2.75 --- 82.50
2 12 30 1 8.5 --- 255.00
---

Total length(m) 61.10 2238.75 56.40 21.90


Unit Weight(Kg) 0.222 0.395 0.617 0.888 1.21 1.578 2.466
Total weight(Kg) 0.00 24.13 0.00 1988.01 68.24 34.56 0.00
Checked By:____________________
Date & Sign:____________________

Bar Schedule
Project :- Residence (G+1)
Location :- AKSUM
Client:- Timnit G/senbet kahsay
G4 yalfal Engineering
Consultant :- Engineerig PLC PLC
Type of No of Total length
Item Location Dia No.bar T.Length Shape
stacture Element Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20
1 Gutter sec-3 1 12 31 1 2.75 85.25
2 2 12 31 1 8.5 263.50
3 sec-4' 1 12 91 1 2.75 250.25
4 2 12 91 1 8.5 773.50
Total length(m) 0.00 1372.50 0.00 0.00
Unit Weight(Kg) 0.222 0.395 0.617 0.888 1.21 1.578 2.466
Total weight(Kg) 0.00 0.00 0.00 1218.78 0.00 0.00 0.00
Checked By:____________________
Date & Sign:____________________
For The Septic Tank
Bar Schedule
Project :- Residence (G+1)
Location :- Aksum
Client:- Timnit G/Slase
Consultant :- G4 Engineering PLC
Type of No of Total length
Item Location Dia No.bar T.Length Shape
Stracture Element Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20
1 1 10 7 1 1.48 --- 10.36
2 1' 12 7 2 1.48 --- 20.72
3 Top 2 10 6 1 1.05 --- 6.27
4 slab 3 10 9 1 4.95 --- 44.55
5 3' 10 6 1 3.43 --- 20.58
6 Septic 4 12 18 1 3.41 --- 61.38
7 Tank 5 10 13 1 5.07 --- 65.91
8 Bottom 6 10 13 1 4.69 --- 60.90
9 Slab 7 12 22 1 1.77 --- 38.94
10 8 12 22 1 2.99 --- 65.78
11 Man hole Cover 12 10 5 2 0.91 --- 9.10
12 10 14 22 2 3.47 --- 152.68
13 Shear wall Section A-A 11 14 22 2 3.48 --- 153.12
14 13 10 15 2 3.07 --- 92.10
15 10 14 13 2 3.47 --- 90.22
16 Shear wall Section B-B 11 14 13 2 3.48 --- 90.48
17 13 10 15 2 1.77 --- 53.10
Total length(m) 4.68 0.00 362.88 186.82 486.50 3144.26 17600.31
Unit Weight(Kg) 0.222 0.395 0.617 0.888 1.208 1.578 2.466
Total weight(Kg) 0.81 0.00 223.89 165.90 587.69 4961.64 43402.37
Prepared By:___________________ Checked By:____________________
Date & Sign:___________________ Date & Sign:____________________
Bill Of Quantity
Project :- Residence (G+1)
Location :- AKSUM-
Client:- Timnit G/senbet kahsay
Consultant :- G4 Engineerig PLC
Item Description Unit Quantity Rate Total
A. SUB STRACTURE
1.Excavation and Earth work
1.1 Clear off the site to remove the top soil to an average depth of 200 mm. m² 261.12 2.00 522.25
1.2 Bulk excavation in ordinary soil to adepth of 500 mm from raduced. m³ 107.45 20.00 2,148.93
Pit excavation in ordinary soil for isolated footing to a depth not
1.3
exceeding 2500 mm from the reduced level. m³ 179.375 50.00 8,968.75
Trenches excavation in ordinary soil for foundation to adepth of
1.4
1500 mm starting from the reduced ground level. m³ 80.87 50.00 4,043.70
Back fill under pit and hard core and for the bulk excavated with
1.5
selected materiyal and well compacted at every 200mm. m³ 301.14 50.00 15,056.95
Cart away surplus excavated materiyals from the site as per the
1.6
engineers instraction(Distance not exceeding 2 Km from the site) m³ 246.81 20.00 4,936.20
250mm thick basaltic or equivalent stone hard core well core well
1.7
rolled consolidated and blinded with well rolled m³ 129.68 80.00 10,374.08
Total carried to summery Birr 46,050.86
2. Concrete work
2.1 50 mm lean concrete c-5 (150kg cement/m3)
a) Under Footing pad m² 43.2 40.00 1,728.00
b) Under stone masonary m² 74.86 40.00 2994.44
2.2 Reinforced concrete in c-25 (360kg cement/m3) filled in to form work
and vibrated around reinforcment steel.form work measured
a) In footing pad m³ 23.376 1000.00 23,376.00
b) Foundation column m³ 2.21 1000.00 2,213.00
c) In Ground floor beam m³ 9.16 1000.00 9,162.00
d) 100mm thick mass concrete floor slab m³ 13.19 1000.00 13,188.30
Total carried to summery Birr 52,661.74
2.3 Mild steel reinforcement accordiang to stractural drawing.price shall
include cutting.bending.placing in position and taying wire,concret
spacers and rainforcement bar chairs.
A. dia 6 plain bar Kg
B. dia 8 defprmed bar kg 667.21 28.00 18,681.74
C.dia 10 deformed bar kg
D dia 12 defprmed bar kg 396.23 28.00 11,094.32
E. dia 14 defprmed bar kg 1208.77 28.00 33,845.50
F. dia 16 defprmed bar kg 771.96 28 21,614.81
G. dia 20 defprmed bar kg
Total carried to summery Birr 85,236.38
3.Masonry Work
3.1 500mm thick trachytic or equivalent roughly dressed masonary
foundation wall beded in cement sand mortar(1;3)ratio m³ 40.97 700 28,680.75
Total carried to summery Birr 28,680.75
4. Form work
4.1 Zigba wood or equivalent formwork to(here all material ecu.post, nail,
zigba or equvalent form work and any other necessary material are
diliverd by the contractor.
Prepared By:___________________ Checked By:____________________
Date &Sing:____________________ Date &Sing_____________________
Bill Of Quantity
Project :- Residence (G+1)
Location :- AKSUM-
Client:- Timnit G/senbet kahsay
Consultant :- Yalfal Egg PLC
Item Description Unit Quantity Rate Total
a) To footing m² 50.55 45.44 2,297.08
b) To fundation m² 35.43 34.21 1,212.20
c) To grade beam m² 69.31 65.26 4,523.19
Total carried to summery Birr 8,032.47
B. SUPER STRACTURE
1. Concretework
1.1
and vibrated around reinforcment steel.form work measured
a) Elevation columen m³ 8.06 2,046.75 16495.1676
b) Floor Beam m³ 13.88 2,046.75 28405.7175375
c) Roof Beam m³ 9.38 2,046.75 19191.888646875
d).Solid slab m³ 10.22 2,046.75 20922.901875
e) Stair Case m³ 0.25 2,046.75 511.6875
f) Gutter m³ 7.09 2,046.75 14504.776908
Total carried to summery Birr 100032.140067375
2. Form Work
2.1 Zigba wood or equivalent formwork to(here all material ecu.post, nail,
zigba or equvalent form work and any other necessary material are
diliverd by the contractor.
a) Elevation columen m² 114.04 121.32 13834.84752
b) Floor Beam m² 160.21 121.32 19,436.87
c) Roof Beam m² 272.90 121.32 33,108.41
d).Solid slab m² 63.81 166.98 10,654.99
e) Stair Case m² 18.43 121.32 2,235.38
f) Gutter m² 76.27 121.32 9253.0764
Total carried to summery Birr 88,523.58
2.2 Mild steel reinforcement accordiang to stractural drawing.price shall
include cutting.bending.placing in position and taying wire,concret
spacers and rainforcement bar chairs.
A. dia 6 plain bar kg 33.84
B. dia 8 defprmed bar kg 1,562.48 28.59 44,671.32
C.dia 10 deformed bar kg 160.23 28.59 4,581.12
D dia 12 defprmed bar kg 3,206.79 28.59 91,682.13
E. dia 14 defprmed bar kg 2,285.99 28.59 65,356.32
F. dia 16 defprmed bar kg 2,505.08 28.59 71,620.09
G. dia 20 defprmed bar kg 88.04 28.59 2,516.95
Total carried to summery Birr 280,427.93
3. Block work
200 mm thick hollow concrete block wall beded in cement sand mortar 319.49 39,049.22
3.1 m² 122.22
1:3 internally & externally left for plastering (class of H.C.B should be B)
150mm thick hollow concrete block wall beded in cement sand mortar 263.03 4,360.20
3.2 m² 16.58
1:3 internally & externally left for plastering (class of H.C.B should be B)
100 mm thick hollow concrete block wall beded in cement sand mortar 241.12 6,302.20
3.3 m² 26.14
1:3 internally left for plastering (class of H.C.B should be B)
Total carried to summery Birr 49,711.62
Prepared By:___________________ Checked By:____________________
Date &Sing:____________________ Date &Sing_____________________
Bill Of Quantity
Project :- Residence (G+1)
Location :- AKSUM-
Client:- Timnit G/senbet kahsay
Consultant :- Yalfal Engg PLC
Item Description Unit Quantity Rate Total
4.Roof work
4.1 Roof covering in G-30 corugated galvanized iron sheet including roof
ridge cover fixed to purlins with dome headed galvanized nailes,purlin
measured separately and roof cover measured in horizontal projection Unit 201.02 229.44 46122.25824
G-28 gavanized iron sheet gutter (devt-33 cms) welded at joints Provide
4.2 2% slope twards down DiDe & shall inchilde 3 coats of oilpaint ml 51.73 89.32 4,620.34
supply and fix 110mm P.V.C pipe for down pipe fixed to wall with metal
4.3 straps welded joints towards to ground and shall include elbow and 3
coat oil paint ml 55.62 52.23 2,905.03
Total carried to summery Birr 53,647.64
5.Carpentry and Joinery work
All structural members shall be well seasoned and free of harmful
defects Each truss shall bepainted anti- termite solution and firnly
fixed to RC beans with dia 6mm plain bars

___________ Checked By:____________________


___________ Date &Sing_____________________
Bill Of Quantity
Project :- Residence (G+1)
Location :- AKSUM-
Client:- Timnit G/senbet kahsay
Consultant :- Yalfal Egg PLC
Item Description Unit Quantity Rate Total
5.1 dia 10-12cm eucalyptus upper|& lower members of truss ml 336.56 24.35 8,195.33
5.2 dia 8-10 cm eucalyptus vertical & diagonal truss member ml 257.28 23.01 5,920.01
5.3 5*7 ziggba ,Tsid on equivalent wooden purlin ml 225.76 57.86 13,062.47
5.4 8 mm thick chip wood nailed to 4*5 ziggba wooden battens placed
c/c 60 cm price includes batten,cornerlist. m² 145.86 271.57 39,612.31
Total carried to summery Birr 27,177.82
6. Metal Work for hand rail and stair
Supply and fix according to the Dawing for stair case hand rail and
balustrade made of RHS tube 40*20*2mm for rows c/c 60 cm at
middle both side for horizontal 15*2.5cm and at the top 10*5*2.5 cm
wanzatimber hand rail supported by 4cm width 1.25mm thick metal
sheet including two coats varnish and oil paint with the with all the
accesssories m² 14.3536 731.17 10494.921712
Total carried to summery Birr 10,494.92
7. Frame work for window and door
7.1 Supply and fix aluminium doors thiknes 1.74 mm profile ,left for
glazing ,including ,hinges,handles withall its accessories m² 7.245 2524.71 18,291.52
7.2 Supply and fix aluminium window thiknes 1.74 mm profile ,left for
glazing ,including ,hinges,handles withall its accessories m² 46.7746 2509.06 117,360.28
7.3 supply and fixflush type wooden door of 40mm thick semi-solid both
side covered with 4mm kerkero play wood or equivalent ,price include
frame ,hinges cylinderical lock and handle and other accessories with
approved quality m² 16.8 1000.63 16,810.58
Total carried to summery Birr 152,462.39
8.Finishing works
8.1. Plastering
8.1 Apply 3 coat of plastering cement sand mortar(1:3) up to final finishe
to all indicated internal and external Hollow concrete block /HCB/,
columen beam lintel slab and stair case m² 593.12 89.15 52,876.50
8.2. painting
8.2 Apply 2 coat of approved type of plastic paint to all indicated internal
and external surface m² 593.1183 17.81 10563.436923
8.3. Floor finishing
8.3 Supply and lay 8.4 mm thick Non slippery ceramic for flooring including
bedded in (1:3) ratio (approved quality by the enginner) m² 76.92 615.63 47,354.26
Supply and lay 2.5cm thick' parquet including bedded
in cement sand mortal (1:3) ratio m² 105.06 412.96 43385.5776
Total carried to summery Birr m² 90,739.84
9. Glazzing work
9.1 5mm thick solar galss cutting and fixinng glazzed to metal beed with
putty m² 54.0196 482.93 26087.685428
Total carried to summery Birr m² 26087.685428
10. Electric Instalation
10.1 Supply, install and connect flush mountedmain-distribution board,
MDB.In sheet metal enclosur with lockable doors and with 3*50/25
mm² cable phase neutral and earth dia 50mm conduit bus bars of 100 A
vconsisting 1 pcs main MCCB of 80 a/3 PH ,
1 pcs ACB of Equivalent oof 32A/3PH
1 pcs ACB of 16A/1PH
complete with bus bar,earthing& other accessories.25% resere no. 0 12,234.90 -
10.2 a) supply and fix flush mounted single switch 0 56.97 -
a) supply and fix flush mounted double switch no. 0 56.97 -
c) supply and fix flush mounted two way switch no. 0 59.71 -
d) supply and fix flush mounted intermidate swith no. 0 127.54 -
d) supply and fix flush mounted push button no. 0 62.32 -
10.3 supply and instal light point fed through PVC insulated conductors of
3*2.5 mm² in the thermoplastic condits of dia 13.5 mm for recessed
including junction boxes with corves (screw type ) & insulating cups no. 0 651.10 -
10.4 supply and fix flush mounted TV socket no. 0 68.06 -
10.5 supply and fix flush mounted Telephon socket no. 0 64.93 -
10.6 a)supply and fix flush mounting socket out let 16-25 a/l ph no. 0 70.15 -
b)supply and fix flush mounting socket twin out let 16-25 a/l ph no. 0 91.02 -
c)supply and fix flush mounting water heater sicket no. 0 69.01 -
Supply and instal flush mounted socket outlet points of 16A single phase
and with earthing contact fed throught PVC insulated conductors of 3*6
mm² in the thermoplastic condits of dia 16mm for recessed instalation
including junction boses with covers & insulating caps all complet. no. 0 663.42 -
10.7 Supply and instal cable ,wire & condute
A.Cable (2.5 mm² wire) ml 0 13.37 -
B. Cable way( Diameter 21 mm pvc condute) ml 0 12.59 -
10.8 construct Manhole double bricks wall internall plastred with
removal renforced concrete cover thikness 8cm with lifting lug
A.600*600*600mm no. 0 2500 -
Total carried to summery Birr -
11. Sanitary Work
supply and instal PVC pipe for sewer,water-storm and water supply in
11.1 horizontal and vertical stacks of approved standard including the
necessary fittinggs as bends,Y.T clean outs,reducing pieces the
necessary accessories.(Approved quality by the enginer)
a) Diameter 50 mm P.V.C pipe ml 0 29.38 -
b) Diameter 110 mm P.V.C pipe ml 0 57.5 -
11.2 Supply and fix shawer try with all accessorise including chrome
plated brase,clips and screws.(80*80 cm) ml 0 1711.55 -
supply and fix low flush or high flush wash down water closest including
11.3 cistern,plastic seat & cover with all the accessories. ml 0 2222.78 -
11.4 Supply and fix hand wash basin size 500x405 with stand made of
white viteous china equiped with taps,concealed brackets of gr
ay malleable cast iron complite with plug,chain,and trap. ml 0 746.36 -
11.5 Supply and fix double bowle kitchen sink with all accessorise including
chrome plated brase,clips and screws. ml 0 951.43 -
11.6 supply and fix soap holder with all accessories ml 0 81.39 -
11.7 supply and fix soft holder with all accessories ml 0 146.61 -
11.8 supply and fix crystal glase mirror of size 500x400mm including
chrome plated brass clips and screws. ml 0 506.29 -
11.9 supply and install 20*20 cm floor drain incuding cast iron smell trap
and white enameled removabel grating. ml 0 361.42 -
11.1 supply and install vent cap made of rigid PVC to be connected to the
roof terminall PVC to be connected to the roof terminall of vent pipes.
.size dia.50mm. ml 0 300.00 -
10.11 constaction rectangular manhol on the sanitary sewer line of size 700 X
700 mm with 250mm thick double brick wall plastered in to coats of
cement sand mortar of 1:3 a reanforced concrete manhol 80mm
thickness with flat metal handle should also beprovided. Average depth
of manhol is 800mm. ml 0 3000.00 -
11.12 PPR pipe
a) 3/4 pipe ml
b) 1/2 pipe ml
11.13 supply and fix european made gate valve approved by the engineer
and complite with unions,elastic water proofing and hand wheels of
normal quality .
a) 3/4 pipe ml
b) 1/2 pipe ml
11.14 supply and fix plastic water tank 5000 litter with all accessory
(approvedquality by the engineer) ml 1 17818.09 17,818.09
Total carried to summery Birr 17,818.09
Summary
Project :- Residence (G+1)
Location :- Aksum
Client:- Tmnit G/Senbet
Consultant :- G4 Engineering PLC

ITEM DESCRIPTION

A, Sub Stracture
1 Excavation and earth work BIRR
2 Concrete work BIRR
3 Rainforcement works BIRR
4 Masonry works BIRR
5 Form work BIRR
BIRR
TOTAL (A)
B. Supper Stracture
1
2 Concrete works BIRR
3 Form work BIRR
4 Rainforcement works BIRR
5 Block work BIRR
6 Roof work BIRR
7 Carpentry and joinery BIRR
Metal Work for hand rail and
8 BIRR
stair
Frame work for window and
9 BIRR
door
9 Finishing works BIRR
10 Glazzing work BIRR

BIRR
TOTAL (B)
TOTAL
BIRR
(A+B)
Summary

AMOUNT

46,050.86
52,661.74
85,236.38
28,680.75
8,032.47
220,662.19

100,032.14
88,523.58
280,427.93
49,711.62
53,647.64
27,177.82
10,494.92

152,462.39
90,739.84
26,087.69

1,295,146.02

1,515,808.22
For Septic tank
Takeoff Sheet
Project :- Residence (G+1)
Location :- Akusm
Client:- Tmnit G/Senbet
Consultant :- G4 Engineering PLC
T.G L*W*H Squ Unit Description
1.Excavation and Earth work
1 3.60 1.1. Pit Excavation
2.30
2.50 20.70 m³ For Septic tank
2. Concrete Work
2.1. C-5 Lean Concrete
1 3.10 C. Under septic tank
1.80 5.58 m²
2.2. C-25 Concrete
1 3.10 Bottom slab
1.80
0.20 1.12 m³

2 2.10 vertical shear wall


3.10
0.20 2.60 m³
2 2.10
1.40
0.20 1.18 m³
1 3.10 Top slab
1.80
0.20 1.12 m³
1 0.80 Deduction from the top slab
0.80
0.10 0.06 m³ Cover for the Septic tank
4.83 m³ Total
4. Form Work
For the vertical shear wall
2 2.7
2.1 11.34 m²
2 1.4
2.1 5.88 m²
1 2.7
1.4 3.78 m² For the top slab
21 m² Total