Quantity For Class
Page 1
Takeoff Sheet
Project :- Residence (G+1)
Location :- AKSUM-
Client:- Timnit G/senbet kahsay
Consultant :- G4 Engineering PLC
T.G L*W*H Squ Unit Description T.G L*W*H Squ Unit Description
1.5. Back Fill 1 4.51
1 179.375 m³ Detto as pie Excavation 0.7 3.16 m² along axis-2
1 107.45 m³ Detto as Bulk Excavation 1 3.81
1 80.87 m³ Detto as Trench Excavation 0.7 2.67 m² along axis-3
Deduction 1 1.35
23.376 m³ Total volume of concrete for footing pad 0.7 0.95 m² along axis-3'
2.21 m³ Total volume of concrete for footing columen 1 1.6
40.97 m³ Total volume of Masonry wall 0.7 1.12 m² along axis-4
301.139 m³ Total Volume of Backfill 1 3.61
246.81 m³ 1.6 cartaway 0.7 2.53 m² along axis-4'
2.concrete work 1 1.98
2.1 lean concrete 0.7 1.39 m² along -4'
7 2 A. under footing pad 74.86 m² Total
2 28 m² F1 2.2 C-25 concrete
1 1.4 A for pad
1.4 1.96 m² F2 7 2
2 1.8 2
1.8 6.48 m² LF1 0.5 14 m³ F1
3 1.2 1 1.4
1.2 4.32 m² LF2 1.4
1 1.2 0.4 0.784 m³ F2
1.2 1.44 m² LF3 2 1.8
1 1 1.8
1 1 m² LF4 0.7 4.536 m³ LF1
1 6.51 3 1.2
B. under masonry 1.2
1 6.51 0.6 2.592 m³ LF2
0.7 4.557 m² along axis-D 1 1.2
1 7.48 1.2
0.7 5.236 m² along axis-C' 0.6 0.864 m³ LF3
1 1.13 1 1
0.7 0.791 m² along axis-C 1
1 3.33 0.6 0.6 m³ LF4
0.7 2.331 m² along axis-B 23.376 m³ Total
1 5.93 B for foundetion column
0.7 4.151 m² along axis-A 3 0.2
1 3.99 0.4
0.7 2.793 m² along axis-1 2 0.48 m³ F1-C1
Page 2
Takeoff Sheet
Project :- Residence (G+1)
Location :- AKSUM-
Client:- Timnit G/senbet kahsay
Consultant :- G4 Engineering PLC
T.G L*W*H Squ Unit Description T.G L*W*H Squ Unit Description
1 0.2 1 5.13 Along axis-A
0.4 0.25
2 0.16 m³ F1-C3 0.4 0.513 m³ GFB7
3 0.3 1 6.29 Along axis-1
0.3 0.25
2 0.54 m³ F1-C6 0.4 0.629 m³ GFB8
1 0.2 1 11.11 Along axis-2
0.4 0.25
1 2.1 0.17 m³ F2-C1 0.4 1.11 m³ GFB9
0.2 1 10.86 Along axis-3
0.4 0.25
1.7 0.14 m³ LF1-C1 0.4 1.09 m³ GFB10
1 0.3 2 2.45 Along axis-3'
0.3 0.25
1.7 0.15 m³ LF1-C2 0.4 0.49 m³ GFB11
1 0.4 1 5.025 Along axis-4
0.4 0.25
1.8 0.29 m³ LF2-C8 0.4 0.5025 m³ GFB12
2 0.2 1 4.135 Along axis-4'
0.4 0.25
1.8 0.29 m³ LF2-C4 0.4 0.4135 m³ GFB13
2.21 m³ Total 9.16 m³ Total
2.3 Ground floor beam concrete work 2.4 Ground floor slab concrete
1 14.01 Along axis-D Total area of the ground floor
0.25 131.883 slab 131.883 m²
0.4 1.40 m³ GFB1 0.10 13.19 m³ Total
1 9.005 Along axis-C' 3 form work
0.25 A. forfooting pad
0.4 0.90 m³ GFB2 7 8.1
1 5.255 Along axis-C 0.5 28.35 m² F1
0.25 1 5.7
0.4 0.53 m³ GFB3 0.4 2.28 m² F2
1 10.93 Along axis-B 2 3.78
0.25 0.7 5.292 m² LF1
0.4 1.09 m³ GFB5 3 4.9
1 3.305 Along axis-B-C 0.6 8.82 m² LF2
0.25 1 4.9
0.4 0.33 m³ GFB4 0.6 2.94 m² LF3
1 5.8 Along axis-A 1 4.1
0.25 0.7 2.87 m² LF4
0.4 0.58 m³ GFB6 50.55 m² Total
Prepared By:___________________ Checked By:____________________
Page 3
Date & Sign:___________________ Date & Sign:____________________
Takeoff Sheet
Project :- Residence (G+1)
Location :- AKSUM-
Client:- Timnit G/senbet kahsay
Consultant :- G4 Engineering PLC
T.G L*W*H Squ Unit Description T.G L*W*H Squ Unit Description
B for foundetion column 1 4.8
3 1.3 0.4 1.92 m² along axis-3'
2 7.80 m² F1-C1 1 8.7
1 1.3 0.4 3.48 m² along axis-4
2 2.6 m² F1-C3 1 13.82
3 1.3 0.4 5.53 m² along axis-4'
2 7.8 m² F1-C6 69.31 m² Total
1 1.3 4.Hard Core
2.1 2.73 m² F2 1 129.676 Total area of hard core
1 1.3 0.25 32.42 m³ Total volme of hard core
1.7 2.21 m² LF1-C1 5. Masonry work
1 1.3 1 0.75 Along Axis -D
1.7 2.21 m² LF1-C2 8.01 6.01 m²
1 1.7 1 0.75 Along axis -C'
1.8 3.06 m² LF2-C8 5.78 4.34 m²
2 1.3 1 0.75 Along Axis-C
1.8 4.68 m² LF2-C4 2.13 1.60 m²
1 1.3 1 0.75 Along axis-B
1.8 2.34 m² LF3-C1 4.83 3.62 m²
1 1.7 1 0.75 Along Axis-A
1.8 3.06 m² LF4-C8 6.93 5.20 m²
35.43 m² Total 1 0.75 Along Axis-B&C
1 C form work for grade beeam 2.18 1.64 m²
26.97 1 0.75 Along Axis -1
1 0.4 10.79 m² along axis -D 4.44 3.33 m²
17.86 1 0.75 Along Axis-2
1 0.4 7.14 m² Along axis -c' 6.01 4.51 m²
9.535 1 0.75 Along Axis -3
1 0.4 3.81 m² Along-c 3.91 2.93 m²
20.16 1 0.75 Along Axis-3'
1 0.4 8.06 m² Along axis-B 1.6 1.20 m²
5.935 1 0.75 Along Axis-4
1 0.4 2.37 m² Along axis-B-C 2.1 1.58 m²
21.96 1 0.75 Along Axis-4'
1 0.4 8.784 m² Along axis-A 6.71 5.03
13.23 40.97 m² Total
1 0.4 5.292 m² Along axis-1
22.195
1 0.4 8.878 m² Along axis-2
21.92
0.4 8.77 m² Along axis-3
Prepared By:___________________ Checked By:____________________
Page 4
Date & Sign:___________________ Date & Sign:____________________
Takeoff Sheet
Project :- Residence (G+1)
Location :- AKSUM-
Client:- Timnit G/senbet kahsay
Consultant :- G4 Engineering PLC
T.G L*W*H Squ Unit Description T.G L*W*H Squ Unit Description
B SUPER STRUCTURE 1 12.03
1.CONCRETE WORK 0.3
1.2 Concrete work for column 0.3 1.0827 m³ FB4-Along axis-Along axis-B
10 0.2 1 11.16
0.4 0.275
2.76 2.21 m³ C1 0.55 1.68795 m³ FB5'' Along axis-A
2 0.3 1 5.33
0.3 0.3
2.76 0.50 m³ C2 0.3 0.48 m³ VERENDA
3 0.2 1 3.5
0.4 0.6
2.76 0.66 m³ C3 0.3 0.63 m³ FB6 Along axis-1
3 0.2 1 10.86
0.35 0.6
2.76 0.58 m³ C4 0.3 1.95 m³ FB7 Along axis-2
1 0.3 1 6.9
0.3 0.3
2.76 0.25 m³ C5 0.3 0.62 m³ FB7' Along axis-1-2
10 0.3 1 2.5
0.3 0.3
2.76 2.484 m³ C6 0.3 0.22 m³ FB8' Along axis-2-3
2 0.3 1 11.7
0.3 0.6
2.76 0.50 m³ C7 0.3 2.11 m³ FB8' Along axis-3
2 0.4 1 5.16
0.4 0.6
2.76 0.88 m³ C8 0.3 0.93 m³ FB9 Along axis-4
8.06 m³ Total 1 4.4
1.3 beam concrete work 0.6
1 5.07 0.3 0.79 m³ FB10 Along axis-4
0.3 1 4.4
0.3 0.46 m³ FB1 along axis-D 0.6
1 5.33 0.3 0.792 m³ FB10 along axis-4'
0.3 1 5.46
0.3 0.48 m³ fb1' along axis-D 0.3
1 9.28 0.2 0.3276 m³ FB9' Along axis-4'
0.3 13.88 m³ Total
0.3 0.84 m³ FB2 along axis-C' 1.4 Edge beam
1 5.33 1 3.6
0.3 0.2
0.3 0.48 m³ FB3-Along axis-C 0.3 0.22 m³ Along axis-2-3
1 2.18
Prepared By:___________________ Checked By:____________________
Page 5
Date & Sign:___________________ Date & Sign:____________________
Takeoff Sheet
Project :- Residence (G+1)
Location :- AKSUM-
Client:- Timnit G/senbet kahsay
Consultant :- G4 Engineering PLC
T.G L*W*H Squ Unit Description T.G L*W*H Squ Unit Description
0.2 1 4.525 RB-10 Along axis -4'
0.3 0.13 m³ Along axis-1-2 0.25
1 4.383 0.35 0.40 m³
0.2 1 5.535 RB-11 Along axis -4-4'
0.3 0.26298 m³ Along axis-3-4 0.25
0.61 m³ Total 0.35 0.4843125 m³
1.5 For Top Tile Beam 2 4.34 RB-12 above +11.12
2 5.23 RB-1 Along axis-D&C 0.25
0.25 0.35 0.7595 m³
0.35 0.91525 m³ 2 2.4 RB-13 above +11.12
1 7.3 RB-2 Along axis -C' 0.25
0.25 0.35 0.42 m³
0.35 0.64 m³ 9.38 m³ Total
1 12.03 RB-3 Along axis-B 1 1.6 First Floor Slab
0.25 68.15
0.35 1.05 m³ 0.15 10.2225 m³ Total volume of floor slab
1 10.67 RB-4Along axis-A 1.7 Roof Slab
0.25 9.43
0.35 0.93 m³ 0.15 1.4145 m³ Total volume of Roof slab at +8.18
1 4.295 RB-5 Along axis-A 11.64 m³ Total
0.25 1.8 Stair Case
0.35 0.375813 m³ Landing Beam
1 8.363 RB-6 Along axis -2 1 2.5 SCB-1 Along axis -4
0.25 0.25
0.35 0.73 m³ 0.4 0.25 m³ Total
1 4.1 RB-6' Along axis -1&2 1 2.5 landing
0.25 0.74
0.35 0.36 m³ 0.17 0.3145 m³ Total
1 4.035 RB-7 Along axis -2-3 bottom flight
0.25 1 3.08
0.35 0.353063 m³ 1.2
1 10.11 RB-8 Along axis -3 0.17 0.62832 m³ along section 1-1&2-2
0.25 0.62832 m³ Total
0.35 0.884625 m³ steps
1 12.26 RB-9 Along axis -4 9 0.023
0.25 1.2 0.2484 m³ section 1-1
0.35 1.07275 m³
Prepared By:___________________ Checked By:____________________
Page 6
Date & Sign:___________________ Date & Sign:____________________
Takeoff Sheet
Project :- Residence (G+1)
Location :- AKSUM-
Client:- Timnit G/senbet kahsay
Consultant :- G4 Engineering PLC
T.G L*W*H Squ Unit Description T.G L*W*H Squ Unit Description
9 0.023 2 1.3
1.2 0.2484 m³ section 2-2 2.7 7.02 m² C7
0.4968 m³ Total 2 1.7
1.9.Gutter 2.76 9.384 m² C8
1 5.23 Along Axis-D 114.036 m² Total
0.14 0.72 m³ B for intermidet beam
1 7.05 Along Axis-C' 1 13.16 FB -1
0.14 0.97 m³ 0.395 5.1982 m² Along axis-D
1 1.40 Along Axis-B 1 13.74 FB -1'
0.14 0.19 m³ 0.395 5.4273 m² Along axis-D
1 5.65 Along Axis-A 1 23.04 FB-2
0.14 0.77 m³ 0.65 14.976 m² Along axis-C
1 5.33 Along axis belo- A 1 12.89 FB-3
0.14 0.73 m³ 0.65 8.3785 m² Along axis-C
1 4.85 Along axis-1 1 31.09 FB-4
0.14 0.66 m³ 0.65 20.2085 m² Along axis-B
1 4.31 Along axis-2 1 5.33 FB-5'
0.14 0.59 m³ 0.395 2.10535 m² Along axis-A
1 4.40 Along axis-3 1 27.79 FB-5''
0.14 0.60 m³ 0.395 10.97705 m² Along axis-A
1 13.51 Along Axis -4' 1 10.7 FB-6
0.14 1.85 m³ 0.395 4.2265 m² Along axis-1
7.09 m³ Total 1 33.33 FB7
2 formwork 0.65 21.6645 m² Along axis-2
A for elvation column 1 21.53 FB7'
10 1.3 0.395 8.50435 m² Along axis-1-2
2.76 35.88 m² C1 1 36.93 FB-8
0.65 24.0045 m² Along axis-3
2 1.3 1 15.63 FB-9
2.76 5.52 m² C2 0.65 10.1595 m² Along axis-4
2 1.3 1 17.13 FB-9'
2.76 7.176 m² C3 0.395 6.76635 m² Along axis-4-4'
3 1.2 1 13 FB-10
2.76 9.936 m² C4 0.65 8.45 m² Along axis-4
1 1.2 1 14.1 FB-10'
2.7 3.24 m² C5 0.65 9.165 m² Along axis-4
10 1.3 160.2116 m² Total
2.76 35.88 m² C6 C.for edge beam
Page 7
Date & Sign:___________________ Date & Sign:____________________
Takeoff Sheet
Project :- Residence (G+1)
Location :- AKSUM-
Client:- Timnit G/senbet kahsay
Consultant :-G4 Engineering PLC
T.G L*W*H Squ Unit Description T.G L*W*H Squ Unit Description
1 10.83 EB-1 1 7 RB-13
0.395 4.27785 m² Along axis -2-3 0.85 5.95 m² Along axis-4
1 8.667 EB-2 272.9015 m² Total
0.395 3.423465 m² Along axis -1-2 E. form work for slab
1 12.346 EB-3 1 63.81 m² for slab
0.395 4.87667 m² Along axis-A-B 1 3.87 for slab of +8.18
12.57799 m² Total 2.6 10.062 m²
D.For Top Tile Beam 73.872 Total formwork of slab
1 14.565 RB-1 F. for stair case
1 14.565 m² Along axis-D For Landing Beam
1 21.957 RB-2 1 8.1 scB1
1 21.957 m² Along axis-c' 0.395 3.1995 m² Total
1 33.11 RB-3 Soffit form work
1 33.11 m² Along axis-B 1 2.5
1 13.965 RB-1 0.74 1.85 m² for landing
1 13.965 m² Along axis-C 2 3.1 For B.Flight along section 1-1 & 2-2
1 28.804 m² RB-4 1.2 7.44 m²
1 28.804 m² Along axis-A 9.29 m² Total
1 14.431 RB-5 For Steps
1 14.431 m² Along axis-blow-A Area of one Step=0.24 m²
1 25.105 RB-6 36 0.023 0.828 m² Along Section 1-1 & 2-2
1 25.105 m² Along axis-2 0.828 m² Total
1 12.03 RB-7 Side Form work for the flight
1 12.03 m² Along axis-b/n 2&3 4 3.1 Along section 1-1 and 2-2
1 36.67 RB-8 0.17 2.108 m² Total
1 36.67 m² Along axis-3 For Risers
1 36.78 RB-9 20 1.2 Along section 1-1 and 2-2
1 36.78 m² Along axis-4 0.15 3 m² Total
1 3.95 RB-10 G.formwork for gutter
1 3.95 m² Along axis-4' 8.61 m² Along axis-D
1 16.58 RB-11 11.57 m² Along axis-C'
1 16.58 m² Along axis-4' 2.41 m² Along axis-B
1 12.26 RB-12 9.29 m² Along axis-A
0.85 10.421 m² Along axis-C 7.94 m² Along axis-1
1 12.36 RB-12 7.13 m² Along axis-2
0.85 10.506 m² Along axis-B 7.27 m² Along axis-3
1 7.05 RB-13 22.05 m² Along axis-4'
0.85 5.9925 m² Along axis-3 76.27 m² Total
Page 8
Date & Sign:___________________ Date & Sign:____________________
Takeoff Sheet
Takeoff Sheet
Project :- Residence (G+1)
Location :- AKSUM-
Client:- Timnit G/senbet kahsay
Consultant :- G4 Engineering PLC
3.Block Work 3.2.For the First Floor
3.1.For the Ground Floor i. 20 cm thick HCB
i. 20 cm thick HCB A.External
A.External 1 35.46
1 29.14 2.76 97.8696 m²
2.76 80.4264 m² B.Internal
B.Internal 1 25.13
1 16.72 2.76 69.3588 m²
2.76 46.1472 m² 167.2284 m² Total
126.5736 m² Deducation
Deduction for Door and Window 5 0.9
1 0.9 2.1 9.45 m² Door
2.1 1.89 m² Door 2 0.86
1 0.1 0.6 1.032 m² window
0.6 0.06 m² window 2 0.76
1 1.5 0.6 0.912 m² window
1.6 2.4 m² window 11.394 m² Total
4.35 m² Total 155.8344 m² Net Area of 20cm HCB
122.2236 m² Net Area of 20cm HCB ii. 15Cm thick HCB
ii. 15Cm thick HCB A.Internal
A.Internal 1 24.13
1 8.93 2.76 66.5988 m²
2.76 24.6468 m² Deducation
Deduction 3 2.1
3 0.9 0.9 5.67 m² door
2.1 5.67 m² Door 1 1.25
1 1.5 2.1 2.625 m² door
1.6 2.4 m² window 1 1.5
8.07 m² Total 1.6 2.4 m² window
16.5768 m² Net Area of 15cm HCB 10.695 m² Total
iii. 10cm thick 55.9038 m² Net Area of 15cm HCB
External iii. 10 Cm thick HCB
1 3.62 1 External
2.76 9.9912 m² 8.51
internal 2.76 23.4876 m² Total
1 5.85
2.76 16.146 m²
26.1372 m² Total
Page 9
Date & Sign:___________________ Date & Sign:____________________
Takeoff Sheet
Takeoff Sheet
Project :- Residence (G+1)
Location :- AKSUM-
Client:- Timnit G/senbet kahsay
Consultant :- G4 Engineering PLC
4. Roof work 12 3.75 45 ml Vertical for Right Side
A. Along the left direction to the 12 6.51 78.12 ml Diagonal for Right side
front elevation direction having 257.28 ml Total
1 99.04 m² 5cm overlap in both directions. C. zigba purlin with 90cm
B. Along the Right direction to the spacing
front elevation direction having 16 14.11 225.76 ml Total
1 101.981 m² 5cm overlap in both directions. D. 8cm thick chipwood
201.021 m² Total area of decra required 1 Axis (D,C&3,4)
4.2.Gutter 4.577
Along axis -D 8.9 40.7353 m²
1 5.228 ml 1 Axis (C',B&1,2)
Along axis- C' 1.15
1 7.05 ml 4.202 4.8323 m²
Along axis-B Axis (C',B&2,3)
1 1.4 ml 1 5.348
Along axis-A 4.202 22.472296 m²
1 5.65 ml Axis (C,B&3,3')
Along axis-Below A 1 3.896
1 5.33 ml 2.45 9.5452 m²
Along axis-1 Axis (B,A&2,3)
1 4.85 ml 1 5.098
Along axis-2 8.016 40.865568 m²
1 4.31 ml Axis (B,A&3,4)
Along axis-3 1 3.896
1 4.4 ml 4.008 15.615168 m²
Along axis-4' Axis (B,A)
1 13.51 ml 1 0.382
51.728 ml Total 4.008 1.531056 m²
4.3 down pipe Axis (A&3,3')
9 6.18 55.62 Total 1 4.278
5.Carpentry and Joinery work 2.4 10.2672 m²
5.1 Truss and stractural members 145.864088 m² Total
A. dia 10-12cm eucalyptus for a 6. Metal Work for hand rail and stair
12 7.009 84.108 ml total of trusses having 1200 mm 6.1 Alumium hand rail
12 7.228 86.736 spacing 1 10.464 10.464 m² Total
ml Total Inclined truss meember 6.2 for stair case
12 13.81 165.72 ml Total horizontal truss member 1 2.21
336.564 ml Total 0.88 1.9448 m² along section 1-1
B.dia 8-10 cm eucalyptus 1 2.21
Page 10
12 4.59 55.08 ml Vertical for Left Side 0.88 1.9448 m² along section 2-2
12 6.59 79.08 ml Diagonal for Left side 14.3536 m² Total
2.1 1.89 m² 1 49.17 For the First Floor including the RB face
0.9 2.43 m² 2.95 154.9045 m² C. Three coat of soffit floor and roof slabs
1 1.15 W(1.15*1.5 1 68.15 m² Total area of plastering
1.5 1.725 m² 593.1183 total
1 0.66 W(0.66*0.7) 8.2. Painting
0.7 0.462 m² 264.8916 m² A. External wall painting including
1 2.09 W(2.09*1.50) outerface of columen Detto as
1.5 3.135 m² External wall Plastering for the
1 0.86 W(0.86*0.9) ground and first floors.
0.9 0.774 m² 260.0767 m² B.Internal wall painting including
1 3.61 W(3.61*2.76) inner face of columen Detto as
2.76 9.9636 m² internal wall plastering for both
1 1.5 W(1.5*1.5) first and ground floors.
1.5 2.25 m²
Page 11
Takeoff Sheet
Takeoff Sheet
Project :- Residence (G+1)
Location :- AKSUM-
Client:- Timnit G/senbet kahsay
Consultant :- G4 Engineering PLC
Page 12
1 L*W*H Squ Unit Description T.G L*W*H Squ Unit Description
Page 13
Page 14
(54.33)
Page 15
Bar Schedule
Project :- Residence (G+1)
Location:- AKSUM
Client:- Timnit G/senbet kahsay
:- Ephi Engineering
Consultant Consultant PLC PLC
:- Y G4 Engginering
Type of No of Total length
Item Location Dia No.bar T.Length Shape
stracture Element Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20
Bar Schedule
Project :- Residence (G+1)
Location :- AKSUM
Client:- Timnit G/senbet kahsay
G4 yalfal Engineering
Consultant :- Engineerig PLC PLC
Type of No of Total length
Item Location Dia No.bar T.Length Shape
stacture Element Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20
1 Gutter sec-3 1 12 31 1 2.75 85.25
2 2 12 31 1 8.5 263.50
3 sec-4' 1 12 91 1 2.75 250.25
4 2 12 91 1 8.5 773.50
Total length(m) 0.00 1372.50 0.00 0.00
Unit Weight(Kg) 0.222 0.395 0.617 0.888 1.21 1.578 2.466
Total weight(Kg) 0.00 0.00 0.00 1218.78 0.00 0.00 0.00
Checked By:____________________
Date & Sign:____________________
For The Septic Tank
Bar Schedule
Project :- Residence (G+1)
Location :- Aksum
Client:- Timnit G/Slase
Consultant :- G4 Engineering PLC
Type of No of Total length
Item Location Dia No.bar T.Length Shape
Stracture Element Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20
1 1 10 7 1 1.48 --- 10.36
2 1' 12 7 2 1.48 --- 20.72
3 Top 2 10 6 1 1.05 --- 6.27
4 slab 3 10 9 1 4.95 --- 44.55
5 3' 10 6 1 3.43 --- 20.58
6 Septic 4 12 18 1 3.41 --- 61.38
7 Tank 5 10 13 1 5.07 --- 65.91
8 Bottom 6 10 13 1 4.69 --- 60.90
9 Slab 7 12 22 1 1.77 --- 38.94
10 8 12 22 1 2.99 --- 65.78
11 Man hole Cover 12 10 5 2 0.91 --- 9.10
12 10 14 22 2 3.47 --- 152.68
13 Shear wall Section A-A 11 14 22 2 3.48 --- 153.12
14 13 10 15 2 3.07 --- 92.10
15 10 14 13 2 3.47 --- 90.22
16 Shear wall Section B-B 11 14 13 2 3.48 --- 90.48
17 13 10 15 2 1.77 --- 53.10
Total length(m) 4.68 0.00 362.88 186.82 486.50 3144.26 17600.31
Unit Weight(Kg) 0.222 0.395 0.617 0.888 1.208 1.578 2.466
Total weight(Kg) 0.81 0.00 223.89 165.90 587.69 4961.64 43402.37
Prepared By:___________________ Checked By:____________________
Date & Sign:___________________ Date & Sign:____________________
Bill Of Quantity
Project :- Residence (G+1)
Location :- AKSUM-
Client:- Timnit G/senbet kahsay
Consultant :- G4 Engineerig PLC
Item Description Unit Quantity Rate Total
A. SUB STRACTURE
1.Excavation and Earth work
1.1 Clear off the site to remove the top soil to an average depth of 200 mm. m² 261.12 2.00 522.25
1.2 Bulk excavation in ordinary soil to adepth of 500 mm from raduced. m³ 107.45 20.00 2,148.93
Pit excavation in ordinary soil for isolated footing to a depth not
1.3
exceeding 2500 mm from the reduced level. m³ 179.375 50.00 8,968.75
Trenches excavation in ordinary soil for foundation to adepth of
1.4
1500 mm starting from the reduced ground level. m³ 80.87 50.00 4,043.70
Back fill under pit and hard core and for the bulk excavated with
1.5
selected materiyal and well compacted at every 200mm. m³ 301.14 50.00 15,056.95
Cart away surplus excavated materiyals from the site as per the
1.6
engineers instraction(Distance not exceeding 2 Km from the site) m³ 246.81 20.00 4,936.20
250mm thick basaltic or equivalent stone hard core well core well
1.7
rolled consolidated and blinded with well rolled m³ 129.68 80.00 10,374.08
Total carried to summery Birr 46,050.86
2. Concrete work
2.1 50 mm lean concrete c-5 (150kg cement/m3)
a) Under Footing pad m² 43.2 40.00 1,728.00
b) Under stone masonary m² 74.86 40.00 2994.44
2.2 Reinforced concrete in c-25 (360kg cement/m3) filled in to form work
and vibrated around reinforcment steel.form work measured
a) In footing pad m³ 23.376 1000.00 23,376.00
b) Foundation column m³ 2.21 1000.00 2,213.00
c) In Ground floor beam m³ 9.16 1000.00 9,162.00
d) 100mm thick mass concrete floor slab m³ 13.19 1000.00 13,188.30
Total carried to summery Birr 52,661.74
2.3 Mild steel reinforcement accordiang to stractural drawing.price shall
include cutting.bending.placing in position and taying wire,concret
spacers and rainforcement bar chairs.
A. dia 6 plain bar Kg
B. dia 8 defprmed bar kg 667.21 28.00 18,681.74
C.dia 10 deformed bar kg
D dia 12 defprmed bar kg 396.23 28.00 11,094.32
E. dia 14 defprmed bar kg 1208.77 28.00 33,845.50
F. dia 16 defprmed bar kg 771.96 28 21,614.81
G. dia 20 defprmed bar kg
Total carried to summery Birr 85,236.38
3.Masonry Work
3.1 500mm thick trachytic or equivalent roughly dressed masonary
foundation wall beded in cement sand mortar(1;3)ratio m³ 40.97 700 28,680.75
Total carried to summery Birr 28,680.75
4. Form work
4.1 Zigba wood or equivalent formwork to(here all material ecu.post, nail,
zigba or equvalent form work and any other necessary material are
diliverd by the contractor.
Prepared By:___________________ Checked By:____________________
Date &Sing:____________________ Date &Sing_____________________
Bill Of Quantity
Project :- Residence (G+1)
Location :- AKSUM-
Client:- Timnit G/senbet kahsay
Consultant :- Yalfal Egg PLC
Item Description Unit Quantity Rate Total
a) To footing m² 50.55 45.44 2,297.08
b) To fundation m² 35.43 34.21 1,212.20
c) To grade beam m² 69.31 65.26 4,523.19
Total carried to summery Birr 8,032.47
B. SUPER STRACTURE
1. Concretework
1.1
and vibrated around reinforcment steel.form work measured
a) Elevation columen m³ 8.06 2,046.75 16495.1676
b) Floor Beam m³ 13.88 2,046.75 28405.7175375
c) Roof Beam m³ 9.38 2,046.75 19191.888646875
d).Solid slab m³ 10.22 2,046.75 20922.901875
e) Stair Case m³ 0.25 2,046.75 511.6875
f) Gutter m³ 7.09 2,046.75 14504.776908
Total carried to summery Birr 100032.140067375
2. Form Work
2.1 Zigba wood or equivalent formwork to(here all material ecu.post, nail,
zigba or equvalent form work and any other necessary material are
diliverd by the contractor.
a) Elevation columen m² 114.04 121.32 13834.84752
b) Floor Beam m² 160.21 121.32 19,436.87
c) Roof Beam m² 272.90 121.32 33,108.41
d).Solid slab m² 63.81 166.98 10,654.99
e) Stair Case m² 18.43 121.32 2,235.38
f) Gutter m² 76.27 121.32 9253.0764
Total carried to summery Birr 88,523.58
2.2 Mild steel reinforcement accordiang to stractural drawing.price shall
include cutting.bending.placing in position and taying wire,concret
spacers and rainforcement bar chairs.
A. dia 6 plain bar kg 33.84
B. dia 8 defprmed bar kg 1,562.48 28.59 44,671.32
C.dia 10 deformed bar kg 160.23 28.59 4,581.12
D dia 12 defprmed bar kg 3,206.79 28.59 91,682.13
E. dia 14 defprmed bar kg 2,285.99 28.59 65,356.32
F. dia 16 defprmed bar kg 2,505.08 28.59 71,620.09
G. dia 20 defprmed bar kg 88.04 28.59 2,516.95
Total carried to summery Birr 280,427.93
3. Block work
200 mm thick hollow concrete block wall beded in cement sand mortar 319.49 39,049.22
3.1 m² 122.22
1:3 internally & externally left for plastering (class of H.C.B should be B)
150mm thick hollow concrete block wall beded in cement sand mortar 263.03 4,360.20
3.2 m² 16.58
1:3 internally & externally left for plastering (class of H.C.B should be B)
100 mm thick hollow concrete block wall beded in cement sand mortar 241.12 6,302.20
3.3 m² 26.14
1:3 internally left for plastering (class of H.C.B should be B)
Total carried to summery Birr 49,711.62
Prepared By:___________________ Checked By:____________________
Date &Sing:____________________ Date &Sing_____________________
Bill Of Quantity
Project :- Residence (G+1)
Location :- AKSUM-
Client:- Timnit G/senbet kahsay
Consultant :- Yalfal Engg PLC
Item Description Unit Quantity Rate Total
4.Roof work
4.1 Roof covering in G-30 corugated galvanized iron sheet including roof
ridge cover fixed to purlins with dome headed galvanized nailes,purlin
measured separately and roof cover measured in horizontal projection Unit 201.02 229.44 46122.25824
G-28 gavanized iron sheet gutter (devt-33 cms) welded at joints Provide
4.2 2% slope twards down DiDe & shall inchilde 3 coats of oilpaint ml 51.73 89.32 4,620.34
supply and fix 110mm P.V.C pipe for down pipe fixed to wall with metal
4.3 straps welded joints towards to ground and shall include elbow and 3
coat oil paint ml 55.62 52.23 2,905.03
Total carried to summery Birr 53,647.64
5.Carpentry and Joinery work
All structural members shall be well seasoned and free of harmful
defects Each truss shall bepainted anti- termite solution and firnly
fixed to RC beans with dia 6mm plain bars
ITEM DESCRIPTION
A, Sub Stracture
1 Excavation and earth work BIRR
2 Concrete work BIRR
3 Rainforcement works BIRR
4 Masonry works BIRR
5 Form work BIRR
BIRR
TOTAL (A)
B. Supper Stracture
1
2 Concrete works BIRR
3 Form work BIRR
4 Rainforcement works BIRR
5 Block work BIRR
6 Roof work BIRR
7 Carpentry and joinery BIRR
Metal Work for hand rail and
8 BIRR
stair
Frame work for window and
9 BIRR
door
9 Finishing works BIRR
10 Glazzing work BIRR
BIRR
TOTAL (B)
TOTAL
BIRR
(A+B)
Summary
AMOUNT
46,050.86
52,661.74
85,236.38
28,680.75
8,032.47
220,662.19
100,032.14
88,523.58
280,427.93
49,711.62
53,647.64
27,177.82
10,494.92
152,462.39
90,739.84
26,087.69
1,295,146.02
1,515,808.22
For Septic tank
Takeoff Sheet
Project :- Residence (G+1)
Location :- Akusm
Client:- Tmnit G/Senbet
Consultant :- G4 Engineering PLC
T.G L*W*H Squ Unit Description
1.Excavation and Earth work
1 3.60 1.1. Pit Excavation
2.30
2.50 20.70 m³ For Septic tank
2. Concrete Work
2.1. C-5 Lean Concrete
1 3.10 C. Under septic tank
1.80 5.58 m²
2.2. C-25 Concrete
1 3.10 Bottom slab
1.80
0.20 1.12 m³