Professional Documents
Culture Documents
Safety Manager Notes
Safety Manager Notes
Cluster/Project:
Reminder: This form (Safety Manager Notes) shall be thoroughly prepared by the Sindalah Contractor’s Safety Manager. The completed form shall be converted
to a PDF file and then submitted to PMC Safety Lead every Friday (weekend), or before the scheduled Sindalah Safety Manager’s meeting on Saturday morning.
The Contractor’s submitted notes will be included as record of the weekly safety manager’s meeting. (PQP)
2. Significant Safety Challenges/Issues and Contractor Actions (Previous Week)
HDD drilling
3rd party Inspection for all equipment
Hydro statistics Test For water line
Management Walkthrough
Internal Site Inspection
Prepared by:
Reminder: This form (Safety Manager Notes) shall be thoroughly prepared by the Sindalah Contractor’s Safety Manager. The completed form shall be converted
to a PDF file and then submitted to PMC Safety Lead every Friday (weekend), or before the scheduled Sindalah Safety Manager’s meeting on Saturday morning.
The Contractor’s submitted notes will be included as record of the weekly safety manager’s meeting. (PQP)