Contractor:

Cluster/Project:

1. Previous Week Safety Achievement/Highlight:

 HDD Drilling (Ist portable water line )


 Pipe Welding Activity
 Safety Walk Through by Management
 In house training of PTW
Photo
 Equipment Inspection

Reminder: This form (Safety Manager Notes) shall be thoroughly prepared by the Sindalah Contractor’s Safety Manager. The completed form shall be converted
to a PDF file and then submitted to PMC Safety Lead every Friday (weekend), or before the scheduled Sindalah Safety Manager’s meeting on Saturday morning.
The Contractor’s submitted notes will be included as record of the weekly safety manager’s meeting. (PQP)
2. Significant Safety Challenges/Issues and Contractor Actions (Previous Week)

# Significant Safety Challenge /Issue (Previous Week) Action Taken


1 Man machine interface Conducted Training prior to start the activity
2 Lifting Activity Assigned Competent appointed persons
3 Lack of illumination at night work Provided more tower lights in night shift

3. Plan for the Week (P.F.T.W.)

 HDD drilling
 3rd party Inspection for all equipment
 Hydro statistics Test For water line
 Management Walkthrough
 Internal Site Inspection

Prepared by:

Reminder: This form (Safety Manager Notes) shall be thoroughly prepared by the Sindalah Contractor’s Safety Manager. The completed form shall be converted
to a PDF file and then submitted to PMC Safety Lead every Friday (weekend), or before the scheduled Sindalah Safety Manager’s meeting on Saturday morning.
The Contractor’s submitted notes will be included as record of the weekly safety manager’s meeting. (PQP)

You might also like