FARABI YANBU PETROCHEMICALS

LAB#4 PROJECT
WEEKLY SCAFFOLDING WALKTHROUGH OBSERVATION REPORT

PRIORITY/ RISK - H (High- Immediate action to be taken), M (Medium- Action to be taken within 3 days), L (Low- Action to be taken as specified), I (Improvement- Action to be taken before being
classified as a non-compliance), G (Good Practice- constant compliance to EHS requirements)

General Comments:- Stock pile High to be reduced to avoid unexpected collapse of soil near utilities /Temporary facilities
All U-ditch shall be cleaned and clear the blockage to ease the water flow

1 OBSERVATION SUMMARY
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1 0 0 0 0 0
0
Total Open Ongoing Closed Positive

CATOGARY SUMMARY
0.8
0.4
0 0 0 0 0 0 0 0 0 0
0

Observation of CAT R/R Photo Corrective Close-out Photo Action By/Company Status
Hazard/Deviation Action/Recommendation

ATTENDANCE SHEET WALKTHROUGH OPENING MEETING WALKTHROUGH CLOSEOUT MEETING


Total Open Ongoing Closed Positive
0 0 0 0 0

I II III IV V VI VII VIII

RUNNERS
GUARDRAILS BASE/
(LEDGERS/BEA Tags/
PLATE FORM ACCESS STABILITY & TOE COUPLERS FOUNDATIO
RERS/POSTS & Inspection
BOARDS N
TRANSOMES

0 0 0 0 0 0 0 0
OBSERVATION SUMMARY
1
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0 0 0 0
0
Total Open Ongoing Closed

CATOGARY SUMMARY
1
0.8
0.6
IX X 0.4
0.2
0 0 0 0 0 0 0
Unauthori 0
zed
Unsecured
Erection/
materials
Modificati
on

0 0
ON SUMMARY

0 0 0
Ongoing Closed Positive

Y SUMMARY

0 0 0 0 0