Professional Documents
Culture Documents
Weekly Scaffolding Walkthrough
Weekly Scaffolding Walkthrough
LAB#4 PROJECT
WEEKLY SCAFFOLDING WALKTHROUGH OBSERVATION REPORT
PRIORITY/ RISK - H (High- Immediate action to be taken), M (Medium- Action to be taken within 3 days), L (Low- Action to be taken as specified), I (Improvement- Action to be taken before being
classified as a non-compliance), G (Good Practice- constant compliance to EHS requirements)
General Comments:- Stock pile High to be reduced to avoid unexpected collapse of soil near utilities /Temporary facilities
All U-ditch shall be cleaned and clear the blockage to ease the water flow
1 OBSERVATION SUMMARY
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1 0 0 0 0 0
0
Total Open Ongoing Closed Positive
CATOGARY SUMMARY
0.8
0.4
0 0 0 0 0 0 0 0 0 0
0
Observation of CAT R/R Photo Corrective Close-out Photo Action By/Company Status
Hazard/Deviation Action/Recommendation
RUNNERS
GUARDRAILS BASE/
(LEDGERS/BEA Tags/
PLATE FORM ACCESS STABILITY & TOE COUPLERS FOUNDATIO
RERS/POSTS & Inspection
BOARDS N
TRANSOMES
0 0 0 0 0 0 0 0
OBSERVATION SUMMARY
1
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0 0 0 0
0
Total Open Ongoing Closed
CATOGARY SUMMARY
1
0.8
0.6
IX X 0.4
0.2
0 0 0 0 0 0 0
Unauthori 0
zed
Unsecured
Erection/
materials
Modificati
on
0 0
ON SUMMARY
0 0 0
Ongoing Closed Positive
Y SUMMARY
0 0 0 0 0