Actual Audit
C : Part Specific Process Robustness Requirements Possible Score in %
Score
Score
Complience (3)
Avalability (1)
Aqequacy (2)
Check Point
- Yes / No
Applicable
(0)
Classification: Public
Is Supplier having "DM / RO" water plant facility for Die Sparay /
C1.23
Coolant water jackets
Facility Is Supplier is having 3D Compatable CMM Facility for
Management C1.24
Measurement
Is Supplier is having Software Simulation Facilites ( Like Magma
C1.25
Analysis )
C1.26 Is Supplier is having "X" - Ray Facility to detect the Blow Holes .
Is Supplier is having dedicated "Tool Room" facility to conduct
C1.27
Preventive Maintenance activities
Is all the PDC Machines having Closed Circuit of "Auto " Molten
C1.28
Material filling Facility
Is Supplier is having "Proof" Machining Facility ( If Supplies as
C1.29
Cast Condition )
Is Supplier is having "Spectrum " - Chemical Analyser to verify
C1.30
the Chemical Composition
Is Supplier is having Masters certified by "NABL" accredidated
C1.31 lab t for "Spectrum " - Chemical Analyser to verify the Chemical
Composition
Is Supplier is having the System of "Fixture Calibiration " for
C1.32
Machining Jigs / Fixtures
C1.33 Observation for inspection agreement
Material Dimension Inspection Result History management (
C1.34
cutting inspection )
Final Inspection
C1.35 Countermeasure & Availability status on Customer complaints.
Measurement Machine/equipment Management State (
C1.36
Calibration status )
Total
Non Availability
Complience (3)
Avalability (1)
Aqequacy (2)
Check Point
- Yes / No
Applicable
(0)
Class Check Points Remarks
C 2.4 Is Leak test facility available all the Machined Engine Parts
Complience (3)
Avalability (1)
Aqequacy (2)
Check Point
- Yes / No
Applicable
Classification: Public
NC parts storage activity in the process and analysis , action
C 3.13
and trend.
Final Inspection MISMATCH match between upper and lower shapes) (ex.,
C 3.23
within 0.5mm-material tolerance control)
C 3.28 Proper identification & Systematic First In-First Out ( Lot wise )
Availability of Working Standard and execution (matching with
C 3.29
actual working)
Identification , Management of major machining process which
C 3.30
effect product quality
C 3.31 Education, Skill of Workers
Inspection-facility operating Check / Using of Limit sample /
C 3.32
Keeping First , Middle , Last samples
Clamp , tools ( drills , taps etc., ) condition check &
C 3.33
replacement , recording , TOOL Counter management , tool life
Classification: Public
Illumination of Inspection place, installment of limit sample for
C 3.55
Good and Non-Confirming parts
4 ) Process name : Hot & Cold Forging Process - Applicable / Not Applicable
Complience (3)
Avalability (1)
Aqequacy (2)
Check Point
- Yes / No
Applicable
Class Check Points Remarks
Facility Control Is all the Machines having Closed Circuit of "Auto " Molten
C 4.23
Material filling Facility
Classification: Public
Is Supplier is having the System of "Fixture Calibiration " for
C 4.27
Machining Jigs / Fixtures
5) Process name : Steel ( Forging / Bars / Tubes / Sheets Etc ) Machining Process
Non Availability
Complience (3)
Avalability (1)
Aqequacy (2)
Check Point
- Yes / No
Applicable
(0)
Class Check Points Remarks
C 5.4 Is Leak test facility available all the Machined Engine Parts
Machiining
C 5.5 Is Auto Tool life Monitoring & Alram System Available
Complience (3)
Avalability (1)
Aqequacy (2)
Check Point
- Yes / No
Applicable
Remarks
Storing Mill Sheet for Raw Material &Inspection Report of 1st
C 6.1
sub-supplier
Classification: Public
Management Mould Temperature Management (Recording Actual
C 6.19
Temperature Data with tolerence )-in 5 degrees under 600ton ,
Using Chiller & Warmer, Temperature Standard, Mould
C 6.20
Temperature Adjuster
Setting & executing Sanding Standard for Embo(Polish ,
C 6.21
Luster&Color management )
Is Supplier si having adequate facility as below
C 6.22
1) MFI
Is Supplier is having 3D Compatable CMM Facility for
C 6.23
Measurement
Is Supplier is having adequate Software Simulation Facilites to
C 6.24
verify the Mold Flow Analysis
Facility Control
Is Supplier is having dedicated "Tool Room" facility to conduct
C 6.25
Preventive Maintenance activities
Is Supplier is having "Proof" Machining Facility ( If Supplies as
C 6.26
Cast Condition )
Is Supplier is having the System of "Fixture Calibiration " for Jigs
C 6.27
/ Fixtures
C 6.28 Inspection Agreement & Standard
Roughness Control, Finished part Inspection, Testing, Testing
C 6.29
Place
Final Inspection
C 6.30 Endurance Test, Measurement M/C, Calibration
Complience (3)
Avalability (1)
Aqequacy (2)
Check Point
- Yes / No
Applicable
Class Check Points Remarks
Classification: Public
Is Supplier is having the System of "Fixture Calibiration " for Jigs
C 7.27
/ Fixtures
Complience (3)
Avalability (1)
Aqequacy (2)
Check Point
- Yes / No
Applicable
Class Check Points Remarks
Classification: Public
C 8.27 Standardization of Pallets , Trolley & rust prevention
Non Availability
Complience (3)
Avalability (1)
Aqequacy (2)
Check Point
- Yes / No
Applicable
(0)
Class Check Points Remarks
Complience (3)
Avalability (1)
Aqequacy (2)
Check Point
- Yes / No
Applicable
Raw material
control C 10.2 Control of paint (First in First out, material property)
Classification: Public
Is condition standards for pretreatment- fluid executed (
C 10.5
Periodical condition record, Surface control , Film Membrane )
Complience (3)
Avalability (1)
Aqequacy (2)
Check Point
- Yes / No
Applicable
Classification: Public
Degrease management (temperature/thickness
C 11.5
analysis/process standard /washing pollution degree)
Marking & delimit color line for direct current, the anode, the
cathode/
C 11.18
delimit color line for cold water, warm water/water pipeline
heating facilities
Complience (3)
Avalability (1)
Aqequacy (2)
Check Point
- Yes / No
Applicable
Classification: Public
Management MILL SHEET receipt, actions in accordance with Oks & non-
C 12.3 Oks
(eachLOT/monthly/anytime)
Complience (3)
Avalability (1)
Aqequacy (2)
Check Point
- Yes / No
Applicable
(0)
Classification: Public
C 13.9 Observance and performance of Anodizing work standard
Anodizing process operation/thickness
C 13.10 control/Voltage/temperaturecondition/daily report history
management
Washing process operation/condition
C 13.11
management(concentration/OVER FLOW)
Complience (3)
Avalability (1)
Aqequacy (2)
Check Point
- Yes / No
Applicable
Classification: Public
Standardization and proportion for Glue application
C 14.13
Process control
for Shoe
Viscosity of FL47 / Specific Gravity - monitoring
Assembly Dip C 14.14
coating
Establishment of dip coating process , & handling method and
C 14.15
Drying time monitoring after dip coating process
Aesthetic C 14.19 Control of Trimming process for extra glue & burr.
correction
Process C 14.20 Grinding process establishment and control
Inspection facility for Shear test / Proof test of lined shoea ssy (
C 14.21
UTM / Fixtures )
C 14.22 Bonding fixture calibration freqency
15) Process name : Assembly Process ( Sub - Assembly Or Final Assy as Product )
Non Availability
Complience (3)
Avalability (1)
Aqequacy (2)
Check Point
- Yes / No
Applicable
(0)
Class Check Points Remarks
Complience (3)
Avalability (1)
Aqequacy (2)
Check Point
- Yes / No
Applicable
(0)
C 16.1
C 16.2
C 16.3
C 16.4
C 16.5
17) Process name : Electrical Parts Proces ( Winding / Soledering / Assembly / Testing Etc )
Classification: Public
Non Availability (0)
Complience (3)
Avalability (1)
Aqequacy (2)
Check Point
- Yes / No
Applicable
Class Check Points Remarks
C 17.3
C 17.4
C 17.5