You are on page 1of 7

FUGRO GEOTECH(INDIA) PVT. LTD.

WORK PROCEDURE FOR CONDUCTING STANDARD PENETRATION


TEST (SPT)
GHAVP/FUGRO/PT-134/WP-04 R0 Page 1 of 7

NUCLEAR POWER CORPORATION OF INDIA LIMITED


(A GOVT. OF INDIA ENTERPRISE)

DOCUMENT ACCEPTANCE NOTE

PROJECT : GORAKHPUR HARYANA ANU VIDYUT


PARIYOJANA
DOCUMENT NO. : GHAVP/FUGRO/PT-134/WP-04

NAME OF DOCUMENT: WORK PROCEDURE FOR CONDUCTING STANDARD


PENETRATION TEST (SPT)

REVISION NO. : R (0)

DATE OF SUBMISSION: 29/05/2021

TOTAL NO. OF PAGES:


(Including Cover Sheet)

Registration No :

SIGNATURE
NPCIL NAME AND DESIGNATION
WITH DATE

CHECKED BY

REVIEWED BY

CONCURRED
BY

ACCEPTED BY

NOT FOR UNAUTHORISED PUBLICATION / PRESENTATION OUTSIDE NPCIL


FUGRO GEOTECH(INDIA) PVT. LTD.
WORK PROCEDURE FOR CONDUCTING STANDARD PENETRATION
TEST (SPT)
GHAVP/FUGRO/PT-134/WP-04 R0 Page 2 of 7

FUGRO GEOTECH (INDIA) PVT. LTD.

PROJECT: GORAKHPUR HARYANA ANU VIDYUT


PARIYOJANA
NAME OF WORK PROCEDURE FOR CONDUCTING
DOCUMENT: STANDARD PENETRATION TEST (SPT)

DOCUMENT NO.: GHAVP/FUGRO/PT-134/WP-04

SIGNATURE
FUGRO NAME AND DESIGNATION
WITH DATE

PREPARED BY Aamir Kazi

Mohanamurthy.R, Senior Engineering


REVIEWED BY
Geologist
PROOF
Phalguni Sur; Service Line Manager - LSC
CHECKED BY

APPROVED BY K K Jha, Business Delivery Manager

NOT FOR UNAUTHORISED PUBLICATION / PRESENTATION OUTSIDE NPCIL


FUGRO GEOTECH(INDIA) PVT. LTD.
WORK PROCEDURE FOR CONDUCTING STANDARD PENETRATION
TEST (SPT)
GHAVP/FUGRO/PT-134/WP-04 R0 Page 3 of 7

REVISION CONTROL SHEET

PROJECT: GORAKHPUR HARYANA ANU VIDYUT


PARIYOJANA
NAME OF DOCUMENT: WORK PROCEDURE FOR CONDUCTING
STANDARD PENETRATION TEST (SPT).

DOCUMENT NO.: GHAVP/FUGRO/PT-134/WP-04

REVISION NO: R0

REV. DATE OF
NO. REV. DETAIL OF REVISIONS

NOT FOR UNAUTHORISED PUBLICATION / PRESENTATION OUTSIDE NPCIL


FUGRO GEOTECH(INDIA) PVT. LTD.
WORK PROCEDURE FOR CONDUCTING STANDARD PENETRATION
TEST (SPT)
GHAVP/FUGRO/PT-134/WP-04 R0 Page 4 of 7

NPCIL PROPRIETARY CLAUSE

This document contains confidential and protected information and that the
same are the intellectual property of Nuclear Power Corporation of India Limited
(NPCIL). No part of this document including notably any editorial elements, verbal
and figurative marks and images included herein, shall be reproduced or
transmitted or utilized or published or stored in any form or by any means now
known or hereinafter invented, electronic, digital or mechanical, including
photocopying, scanning, recording or by any information storage or retrieval
system, without prior written permission from NPCIL, by any person or entity.
Unauthorized use, disclosure or copying is strictly prohibited and may constitute
unlawful act and can attract legal action.

NOT FOR UNAUTHORISED PUBLICATION / PRESENTATION OUTSIDE NPCIL


FUGRO GEOTECH(INDIA) PVT. LTD.
WORK PROCEDURE FOR CONDUCTING STANDARD PENETRATION
TEST (SPT)
GHAVP/FUGRO/PT-134/WP-04 R0 Page 5 of 7

CONTENTS
CONTENTS..........................................................................................................................5

1. Introduction ...............................................................................................................6

2. Aim ................................................................................................................................6

2. Refrence ......................................................................................................................6

3. Principle .......................................................................................................................6

4. Apparatus: - ...............................................................................................................6

5. Procedure: ..................................................................................................................7

NOT FOR UNAUTHORISED PUBLICATION / PRESENTATION OUTSIDE NPCIL


FUGRO GEOTECH(INDIA) PVT. LTD.
WORK PROCEDURE FOR CONDUCTING STANDARD PENETRATION
TEST (SPT)
GHAVP/FUGRO/PT-134/WP-04 R0 Page 6 of 7

1. Introduction

This method covers the determination of the resistance to soils at the base of
a borehole to the penetration of the split-barrel sampler when driven
dynamically in a standard manner and obtaining disturbed sample for
identification purposes. The test is used mainly in non-cohesive and cohesive
soils.

2. Aim

To determine penetration resistance and consistency of the of soil.


3. Reference

IS: 2131
4. Principle

 The basis of the test include dropping with a free fall a hammer of
mass 63.5 kg on to a drive head from a height of 750 mm.
 The number of such blows (N) necessary to achieve a penetration of
the split-barrel sampler of 300 mm (after its penetration under
gravity and below the seating drive) is regarded as the penetration
resistance (N).
5. Apparatus

 Split barrel sampler assembly.


 Drive rods.
 Drive assembly: Free fall hammer weighing 63.5kg, a pick-up and
release mechanism to ensure that the hammer has a free fall of
75cm.
 Casing
 Other tools such as rope, screw jack etc.

NOT FOR UNAUTHORISED PUBLICATION / PRESENTATION OUTSIDE NPCIL


FUGRO GEOTECH(INDIA) PVT. LTD.
WORK PROCEDURE FOR CONDUCTING STANDARD PENETRATION
TEST (SPT)
GHAVP/FUGRO/PT-134/WP-04 R0 Page 7 of 7

6. Procedure

 The split spoon sampler resting on the bottom of borehole is


allowed to sink under its own weight; then the split spoon sampler
is seated 15 cm with the blows of the hammer falling through 75 cm.
 Thereafter, the split spoon sampler is further driven by 30 cm or 50
blows (except that driving shall cease before the split spoon sampler
is full).
 The number of blows required to affect each 150 mm of penetration
is recorded. The first 15 cm of drive may be considered to be seating
drive. The total blows required for penetration after seating drive is
termed as penetration-resistance.
 If the split spoon sampler is driven less than 45 cm (total), then the
penetration resistance is for the last 30 cm of penetration. If less than
30 cm is penetrated, the number of blows and the depth penetrated
is recorded.
 Standard Penetration Test (SPT) is carried out inside the borehole
below asper specifications or at change of stratum whichever is
earlier.
 In case of sands, there are possibility of instability without casing,
advancement of casing will be done by slowly turning to cause
minimum disturbance.

NOT FOR UNAUTHORISED PUBLICATION / PRESENTATION OUTSIDE NPCIL