(a) Normal Rate: This rate is calculated by dividing the actual overheads by
actual base. It is also known as actual rate.
सामा दर: इस दर क गणना वावक ओवरहेस को वावक आधार से वभाजत
करके क जाती है। इसे वावक दर के प म भी जाना जाता है ।
(c) Blanket Overhead Rate: Blanket overhead rate refers to the computation of
one single overhead rate for the whole factory. It is to be distinguished from
the departmental overhead rate which refers to a separate rate for each
individual cost centre or department.
केट ओवरहेड दर: कंबल ओवरहेड दर पूरे कारखाने के लए एक एकल ओवरहे ड दर क
गणना को संदभत करती है। इसे वभागीय ओवरहेड दर से अलग कया जाना है जो ेक
गत लागत क या वभाग के लए एक अलग दर को संदभत करता है ।
𝑻𝒐𝒕𝒂𝒍 𝒐𝒗𝒆𝒓𝒉𝒆𝒂𝒅𝒔 𝒇𝒐𝒓 𝒕𝒉𝒆 𝒇𝒂𝒄𝒕𝒐𝒓𝒚
Blanket Rate =
𝑻𝒐𝒕𝒂𝒍 𝒏𝒖𝒎𝒃𝒆𝒓 𝒐𝒇 𝒖𝒏𝒊𝒕𝒔 𝒐𝒇 𝒃𝒂𝒔𝒆 𝒇𝒐𝒓 𝒕𝒉𝒆 𝒇𝒂𝒄𝒕𝒐𝒓𝒚
Under-absorption: When the amount of overheads absorbed is less than the amount
of overheads actually incurred, it is called under-absorption or under-recovery. This
has the effect of under-stating the cost because the overheads incurred are not fully
recovered in the costs of jobs, processes etc.
Over-absorption: When the amount of overheads absorbed is more than the amount
of actual overheads incurred, it is known as over-absorption or over-recovery. It has
the effect of over-stating of the cost of jobs, processes etc.
Example:
Pre-determined overhead rate = Rs 5 per machine hour
Actual machine hours = 1,500 hours
Actual overheads = Rs 9,000
Overheads absorbed = 1500 hours × Rs 5
अ या ओवर-अवशोषण के कारण
As regards the treatment of such debit or credit balances, the general view is that
if the balances are small they should be transferred to the Costing Profit and Loss
Account and the cost of individual products should not be increased or reduced as
these would be representing normal cost.
जहां तक ऐसे डेबट या ेडट बैलस के उपचार का संबंध है, सामा कोण यह है क यद
शेष राश छोटी है तो उ लागत लाभ और हान खाते म ानांतरत कया जाना चाहए और
Example: A company absorbs overheads on predetermined rates. For the year ending
31st December 2021, factory overheads absorbed were Rs 3,66,250. Actual amount of
overheads incurred totalled Rs 4,26,890. The following figures are also derived from
the trial balance.
Work-in-progress Rs 1,41,480
एक कंपनी पूव नधारत दर पर ओवरहे स को अवशोषत करती है । 31 दसंबर 2021को समा वष
के लए , फैी ओवरहेस अवशोषत 3,66,250 पये थे। खच क वावक राश कुल 4,26,890
पये थी। नलखत आंकड़े भी परीण संतल
ु न से ा होते ह ।
(iv) Actual capacity: It is the capacity actually achieved during a given period. It
is presented as a percentage of installed capacity.
(v) Idle capacity: It is that part of the capacity of a plant, machine or equipment
which cannot be effectively utilised in production.
(a) Normal Idle Capacity: It is the difference between Installed capacity and
Normal capacity.
(b) Abnormal Idle Capacity: It is the difference between Normal capacity and
Actual capacity utilization where the actual capacity is lower than the normal
capacity.
Treatment of Idle capacity costs: Idle capacity costs can be treated in product
costing, in the following ways:
(a) If the idle capacity cost is due to unavoidable reasons such as repairs,
maintenance, changeover of job etc. a supplementary overhead rate may be
used to recover the idle capacity cost. In this case, the costs are charged to the
production capacity utilised.
(b) If the idle capacity cost is due to avoidable reasons such as faulty planning,
power failure etc.; the cost should be charged to costing profit and loss account.
(c) If the idle capacity cost is due to seasonal factors, then, the cost should be
charged to the cost of production by inflating overhead rates.
(i) संापत/रे टेड मता: यह वुओ ं के उादन या सेवाएं दान करने क अधकतम मता
को संदभत करता है। ापत मता या तो तकनीक वनदश के आधार पर या तकनीक
मूांकन के माम से नधारत क जाती है । इसे सैांतक मता के प म भी जाना जाता है
और सामा ऑपरे टग परतय म ा नह कया जा सकता है।
(iii) सामा मता सामा मता उादन या सेवाओं क माा है साधारत रखरखाव के
परणामप मता म कमी को ान म रखते ए सामा परतय म एक अवध म
औसतन ा या ा करने यो।
(iv) वावक मता यह कसी नत अवध के दौरान वाव म ा क गई मता है।
यह ापत मता के तशत के प म ुत कया गया है।
(ए) सामा नय मता: यह ापत मता और सामा मता के बीच का अंतर है ।
(ख) असामा नय मता यह सामा मता और वावक मता उपयोग के बीच
का अंतर है जहां वावक मता सामा मता से कम है।
नय मता लागत का उपचार: नय मता लागत को उाद लागत म नलखत
तरीक से इलाज कया जा सकता है:
(ए) यद नय मता लागत अपरहाय कारण जैसे मरत, रखरखाव, नौकरी म
परवतन आद के कारण है, तो नय मता लागत को पुना करने के लए एक पूरक
ओवरहेड दर का उपयोग कया जा सकता है । इस मामले म, लागत का उपयोग क गई उादन
मता से शु लया जाता है।
(ग) यद नय मता लागत मौसमी कारक के कारण है, तो उपर दर को बढ़ाकर
लागत को उादन लागत म भारत कया जाना चाहए।
Example: Maximum capacity of a plant = 500 units per day of 8 hours each.
Normal loss time is 10%. Actual capacity is only 360 units per day.
उदाहरण: एक संयं क अधकतम मता = 8 घंटे क त दन 500 इकाइयाँ। सामा हान
का समय 10% है। वावक मता त दन केवल 360 यूनट है।