Section VIII.

Bill of Quantities
Project: PROPOSED CONSTRUCTION OF 2-STOREY, 6-CLASSROOM SCHOOL
BUILDING IN MALUPA ELEMENTARY SCHOOL, BARANGAY
MALUPA, CONCEPCION, TARLAC
Project Duration: Two Hundred Three (203) calendar days
Approved Budget for the Contract: Php 16,277,703.99

Bill of Quantities

Pay Item Description/Scope of Works Unit Quantity Unit Price Contract Cost
No.
Part II Other General Requirements
B.5 Project Billboard/Signboard each 1.00 (in Figure) (in Figure)
(in Words) (in Words)
B.7(1) Occupational Safety and Health Program month 6.77 (in Figure) (in Figure)
(in Words) (in Words)
B.9 Mobilization/Demobilization l.s. 1.00 (in Figure) (in Figure)
(in Words) (in Words)
Sub-Total “Part II” (in Figure) (in Figure)
(in Words) (in Words)
Part III Civil, Mechanical, Electrical and
Sanitary/Plumbing Works
Part A Earthworks
801(1) Removal of Structures and Obstruction l.s. 1.00 (in Figure) (in Figure)
(in Words) (in Words)
803(1)a Structure Excavation (Common Soil) cu.m. 295.57 (in Figure) (in Figure)
(in Words) (in Words)
804(1)b Embankment (from Borrow) cu.m. 63.17 (in Figure) (in Figure)
(in Words) (in Words)
804(4) Gravel Fill cu.m. 49.41 (in Figure) (in Figure)
(in Words) (in Words)
Sub-Total “Part III, Part A” (in Figure) (in Figure)
(in Words) (in Words)
Part B Plain and Reinforced Concrete Works
900(1)c1 Structural Concrete (Ready Mix, Class A, 28 cu.m. 200.13 (in Figure) (in Figure)
days) (in Words) (in Words)
900(1)c2 Structural Concrete, Footings and Slab on Fill cu.m. 58.44 (in Figure) (in Figure)
(Class A, 28 days) (in Words) (in Words)
902(1)a Reinforcing Steel (Deformed, Grade 40) kg. 21,306.76 (in Figure) (in Figure)
(in Words) (in Words)
902(1)b Reinforcing Steel (Deformed, Grade 60) kg. 29,405.17 (in Figure) (in Figure)
(in Words) (in Words)
903(2) Formworks and Falseworks sq.m. 707.39 (in Figure) (in Figure)
(in Words) (in Words)
Sub-Total “Part III, Part B” (in Figure) (in Figure)
(in Words) (in Words)
Part C Finishing and other Civil Works
1000(1) Soil Poisoning li. 39.00 (in Figure) (in Figure)
(in Words) (in Words)
1046(2)a1 100 mm. Thick CHB Non-Load Bearing sq.m. 185.39 (in Figure) (in Figure)
(including Reinforcing Steel) (in Words) (in Words)
1046(2)a2 150 mm. Thick CHB Non-Load Bearing sq.m. 509.97 (in Figure) (in Figure)
(including Reinforcing Steel) (in Words) (in Words)
1003(17) Carpentry and Joinery Works l.s. 1.00 (in Figure) (in Figure)
(in Words) (in Words)
1004(2) Finishing Hardware l.s. 1.00 (in Figure) (in Figure)
(in Words) (in Words)
1005(1) Residential Casement (Steel) sq.m 69.12 (in Figure) (in Figure)
(in Words) (in Words)
1005(5) Steel Window l.s. 1.00 (in Figure) (in Figure)
(in Words) (in Words)
1009(1)a Glass Jalousie Windows sq.m. 28.80 (in Figure) (in Figure)
(in Words) (in Words)
1010(4) Wooden Doors l.s. 1.00 (in Figure) (in Figure)
(in Words) (in Words)
1003(1)a1 Carpentry and Joinery Works (Ceiling) sq.m. 401.55 (in Figure) (in Figure)
(in Words) (in Words)

33
1016(1)a Cement Base Waterproofing sq.m. 265.10 (in Figure) (in Figure)
(in Words) (in Words)
1018(1) Glazed Tiles and Trims sq.m. 104.20 (in Figure) (in Figure)
(in Words) (in Words)
1018(2) Unglazed Tiles sq.m. 25.01 (in Figure) (in Figure)
(in Words) (in Words)
1021(1)c Cement Floor Finish sq.m. 612.03 (in Figure) (in Figure)
(in Words) (in Words)
1027(1) Cement Plaster Finish sq.m. 1,692.09 (in Figure) (in Figure)
(in Words) (in Words)
1038(1) Reflective Insulation sq.m. 336.30 (in Figure) (in Figure)
(in Words) (in Words)
1051(6) Railing l.s. 1.00 (in Figure) (in Figure)
(in Words) (in Words)
1032(1)a Painting Works (Masonry/Concrete) sq.m. 2,316.12 (in Figure) (in Figure)
(in Words) (in Words)
1032(1)b Painting Works (Wood) sq.m. 163.02 (in Figure) (in Figure)
(in Words) (in Words)
1032(1)c Painting Works (Steel) sq.m. 807.18 (in Figure) (in Figure)
(in Words) (in Words)
1013(1) Corrugated Metal Roofing sq.m. 350.58 (in Figure) (in Figure)
(in Words) (in Words)
1013(2)a1 Fabricated Metal Roofing Accessory (Ridge/Hip ln.m. 33.00 (in Figure) (in Figure)
Roll) (in Words) (in Words)
1013(2)a2 Fabricated Metal Roofing Accessory (Flashings) ln.m 44.00 (in Figure) (in Figure)
(in Words) (in Words)
1013(2)b1 Fabricated Metal Roofing Accessory (Gutters) ln.m 6.00 (in Figure) (in Figure)
(in Words) (in Words)
1003(11)a1 Fiber Cement Fascia Board m. 5.00 (in Figure) (in Figure)
(in Words) (in Words)
1047(1) Structural Steel (Fire Escape) l.s. 1.00 (in Figure) (in Figure)
(in Words) (in Words)
1047(2)a Structural Steel (Trusses) kg. 6,440.82 (in Figure) (in Figure)
(in Words) (in Words)
1047(2)b Structural Steel (Purlins) kg. 3,792.20 (in Figure) (in Figure)
(in Words) (in Words)
1047(3)c Metal Structure Accessories (Turnbuckle) each 26.00 (in Figure) (in Figure)
(in Words) (in Words)
1047(4) Metal Structure Accessories (Cross-Bracing) kg. 331.45 (in Figure) (in Figure)
(in Words) (in Words)
1047(6) Metal Structure Accessories (Steel Plates) kg. 1,335.57 (in Figure) (in Figure)
(in Words) (in Words)
1047(7)a Metal Structure Accessories (Bolts) kg. 135.46 (in Figure) (in Figure)
(in Words) (in Words)
1047(7)b Metal Structure Accessories (Sagrods) kg. 413.08 (in Figure) (in Figure)
(in Words) (in Words)
1001(5)b Catch Basin each 17.00 (in Figure) (in Figure)
(in Words) (in Words)
1001(8) Sewer Line Works l.s. 1.00 (in Figure) (in Figure)
(in Words) (in Words)
1001(9) Storm Drainage and Downspout l.s. 1.00 (in Figure) (in Figure)
(in Words) (in Words)
1001(11) Septic Vault l.s. 1.00 (in Figure) (in Figure)
(in Words) (in Words)
1002(4) Plumbing Fixtures l.s. 1.00 (in Figure) (in Figure)
(in Words) (in Words)
1002(24) Cold Water Lines l.s. 1.00 (in Figure) (in Figure)
(in Words) (in Words)
Sub-Total “Part III, Part C”
Part D Electrical (in Figure) (in Figure)
(in Words) (in Words)
1100(10) Conduit, Boxes and Fittings l.s. 1.00 (in Figure) (in Figure)
(in Words) (in Words)
1101(33) Wires and Wiring Devices l.s. 1.00 (in Figure) (in Figure)

34
(in Words) (in Words)
1102(1) Panelboard with Main and Branch Breakers l.s. 1.00 (in Figure) (in Figure)
(in Words) (in Words)
1103(1) Lighting Fixtures and Lamps l.s. 1.00 (in Figure) (in Figure)
(in Words) (in Words)
Sub-Total “Part III, Part D” (in Figure) (in Figure)
(in Words) (in Words)
Part E Mechanical
1202 Fire Protection System l.s. 1.00 (in Figure) (in Figure)
(in Words) (in Words)
1208(1) Fire Alarm System l.s. 1.00 (in Figure) (in Figure)
(in Words) (in Words)
Sub-Total “Part III, Part E” (in Figure) (in Figure)
(in Words) (in Words)
GRAND TOTAL (in Figure) P

T O T A L (in Words)

_______________________________________
Name and Signature of Bidder
______________________________________
Name of Company