You are on page 1of 48

cleaning of school Grounds, roofs, gutters, walls and ceilings

BUTAC INTEGRATED SCHOOL

BEFORE

DURING

AFTER
pruning, weeding, landscaping

BEFORE

DURING

AFTER
Repair of School Furnitures

BUTAC INTEGRATED SCHOOL

DURING

AFTER
Provision of 4 Electric Fans, 2 Fire Extinguishers and 3 Blackboards

Provision of 4 Electric Fans, 2 Fire Extinguishers and 3 Blackboards


Replacement of Broken Pipes and leaking faucets

BEFORE

DURING

AFTER
Renovation of School Entrance

BEFORE

DURING

AFTER
Repair of School Gates (Entrance and Exit)

BEFORE

DURING

AFTER
Levelling and Riprapping of the Proposed site of Junior High School and
Extension Site of Reading Resort.

Junior High School

BEFORE

DURING

AFTER
Levelling and Riprapping of the Proposed site of Junior High School and
Extension Site of Reading Resort.

Reading Resort

BEFORE

DURING

AFTER
Kalinga sa Pagbasa
Putting of Steel Fence in the Middle Portion of the school, back of Marcos
Building, Bagong Lipunan Building, and Reading Resort

DURING

AFTER
Construction of Handwashing Facility (Eastern Portion of the School)

BEFORE

DURING

AFTER
Procurement of ready-made handwashing facilities in the school entrance

BUTAC
INTEGRATED
SCHOOL
Putting of Bulletin Board

BEFORE

DURING

AFTER
Construction of Kiosk in the Reading Resort

BEFORE

DURING

AFTER
Operation Gupit Handog ng mga Pulis
Painting of Rhymes, Riddles, poems in the Reading Resort
Provision of Reading Materials in the Reading Resort
Construction of PTA Nook

BEFORE

DURING

AFTER
Procurement of Tables, Chairs and Office Cabinet

BUTAC
INTEGRATED
SCHOOL
Procurement of Television

BUTAC
INTEGRATED
SCHOOL
Construction of the Damaged Kindergarten Wall

BEFORE

DURING

AFTER
Painting of Walls, Windows, and Roofs

BEFORE

DURING

AFTER
Salwadak Salun-at Mo Program
Putting of School Signages
Putting of School Signages

BEFORE

DURING

AFTER
Distribution of Health Supplies (Face Masks)

BUTAC
INTEGRATED
SCHOOL
Procurement of Electrical Wirings for the Grade 9 Extension Classroom

BUTAC
INTEGRATED
SCHOOL
Construction of the Grade 9 Extension Classroom

BEFORE

DURING

AFTER
Project Igarden

BUTAC
INTEGRATED
SCHOOL
Establishment of Gulayan sa Paaralan

BEFORE

DURING

AFTER
Establishment of Material Recovery Facility

BEFORE

DURING

AFTER
Improvement of the School Herbary

BEFORE

DURING

AFTER
Riprapping and Digging of Drainage in front of Grade 7 and 8

BEFORE

DURING

AFTER
Pulvoron Making
Establishment of SPG and MAPEH Parks

SPG Park

BEFORE

DURING

AFTER
Establishment of SPG and MAPEH Parks

MAPEH Park

DURING

AFTER
Putting of 2 Group Handwashing Facilities

BEFORE

DURING

AFTER
Landscaping of School Grounds
Distribution of school supplies, hygiene supplies, and emergency kits to learners
Establishment of Math Park

BEFORE

DURING

AFTER
Improvement of Park

BUTAC
INTEGRATED
SCHOOL

You might also like