Package - 08 U-Ditch Works

DRAINAGE
DRAINAGE (( PRECAST
PRECAST SYSTEM
SYSTEM ))

SYSTEM PRECAST

Fabrication Precast Fabrication Precast Stock yard Precast

Delivery to site Excavation Installing

Form Work

Finish

WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT


2
Package - 08 U-Ditch Works

The
The Stages
Stages of
of Drainage
Drainage Works
Works (U
(U Ditch)
Ditch)

1). Place a project fence, Rubber Cone, Concrete Barrier to protect and separate the works from
1
existing traffic, and ensure adequate safe distance needs to work. Check elevation, coordinates
of drainage inlet and outlet according to the line, elevation, slope and size that is drawn in shop
drawing.

2). Excavation by Excavator


2
and Finishing by man
power.
3

3). Compaction the bottom of Drainage and


spreading the blinding stone.

4 5 6 7

4). Pouring the concrete Class 5). Installation of precast drainage by 6). Finishing the drainage 7). Install Cover Concrete.
K-250 by Truck Mixer. using a unique crane. (Backfill, Cleaning, etc). Works is complete.