BIM

BASED ON ISO 19650


BIM
PRESENTATION OUTLINE
1. BIM DEFINITION

2. WORKFLOW OF A BIM PROJECT

3. BIM 3D LEVEL

4. BIM 4D&5D LEVEL


2
1 BIM DEFINITION
BIM
Building Information Modelling is a system
which integrates information into the model of
the building.

4
DIMENSION LEVEL OF BIM

Geometry Money Facility


2D + an 4D + Quantity 6D + Holistic
additional take off, cost facility
dimension of estimation and management
z. budget information for
analysis. entire life cycle
of a project.

2D 4D 6D 8D

3D 5D 7D
2D Drawing Time Sustainability Safety
Regular 3D + Timeline, 5D + self 7D + Building
drawing with x scheduling sustainability safety,
and y and the and energy security, and
dimension. duration of the efficient and emergency
project. analysis. plans

5
BIM MATURITY LEVEL
Fully Integrated to all parties

Collaborative Model

2D and 3D

Paper based 2D Cad

Level 3
Level 2
Level 1
Level 0

Minimal Collaboration Partial Collaboration Full Collaboration Full Integration

6 ISO : 19650
BIM PROJECTS
2 WORKFLOW
PROJECT WORKFLOW

PIC Activities Notes

Start
OIR
Owner made a FS for the
Assessment project based on OIR,
Owner PIR PIR, AIR which later
and needs
become EIR.
AIR
When the project is
deemed feasible Owner
Invitation to
Owner will then spread the
Tender invitation to tender to
potential Contractor

BEP
PTPP joined the tender by
PP Tender PTPP Joined
submitting BEP Pre
Team Risk Contract, Risk
the Tender Management and its
Mob. mobilization Plan.
Plan

A
PROJECT WORKFLOW

PIC Activities Notes

After the process of


Tender, owner will then
Owner Appointment appoint a winner to the
selected Contractor

BEP
Selected project team will
Project start to mobilize to the
Mobilization project, update its BEP,
Team MIDP
and produce the
Respon Responsibility Matrix and
. Matrix MIDP.

A
PROJECT WORKFLOW

PIC Activities Notes

The Information will then be


Information produced and delivered to
Project
Production owner based on the BEP,
Team All information regarding
& Delivery
the project will be archived.

Project Lesson The archived information


Project will serve as a lesson
Close Out Learned
Team learned for references in
future similar projects

Finish
INFORMATION WORKFLOW

BIM ENGINEER Create WIP


Review Model Notify unresolved
for Task Team Implement
Issue
Changes

SEM
Instruct Team Internal
Input for BEP and TIDP Share Reference Data Internal to Resubmit QA for
Internal QA Revison
Assurance

OWNER

Initiate CDE Respond Submit to


Formation of MIDP, Project to Issue
wide QA Authorize Model Appointing Party
Responsibility Matrix

11
COMMON DATA ENVIRONMENT

2. Shared 3. Published
Information approved for Information that has been
sharing with other parties authorized for use in more
for reviewing and detailed design, for
authorizing purposes construction or asset
management

1. Work in Progress 4. Archive


Information being Journal of information,
developed by its originator providing an audit trail of
or task team, not visible or information container
accessible by anyone else development
3 BIM 3D LEVEL
CIVIL 3D OVERVIEW
SITE
CREATION

Road & Railway Material Takeoff Piping Network


Site Design
Creation Creation

Civil 3D dapat Civil 3D dapat digunakan


Civil 3D dapat digunakan Civil 3D dapat digunakan digunakan untuk dalam pembuat piping
dalam membuat trase jalan, dalam membuat grading memperhitungkan network serta sistim
gambar potongan, pada site, perencanaan kebutuhan cut & fill dari drainase pada proyek
alinyemen horizontal dan galian, timbunan serta site desain site dan jalan dengan site layout yang
vertical pada jalan maupun development lainnya. yang sudah dibuat. masif.
rel.

14
INFRAWORKS OVERVIEW
SITE
VISUALIZATION

3D
Model

Aesthetic
15 Visualization
4 BIM 4D & 5D LEVEL
APPLICATION
COMPARISON

VS
Bexel Manager Autodesk Navisworks Manage

17
APPLICATION OVERVIEW

Features
IFC format supported
Wide Arrays of Import formats
Clash detection
Material takeoff
4D schedule simulation
4D auto connect schedule to model
Custom selection sets based on API coding
Supports 7D BIM
Adaptive 5D cost analysis from models

18
BEXEL ADVANTAGES

Advanced Color Advanced 5D Cost


Auto Connecting 4D
Code Selection Sets Analysis
simulation

Supported for 7D Better Visualization


Facility Management for Data Presentation
19
BEXEL
DISADVANTAGES

Manpower Compatibility
Additional Cost
Readiness
Navisworks is a part of AEC Navisworks is a part of AEC BIM.
Bexel Manager is a very So any formats produced by any
BIM which is already in use
powerful and versatile BIM Autodesk application would work
by PTPP, so its utilization
Application. But, its seamlessly on Navisworks. In
requires no additional cost.
complexity would require other hand you need to convert any
The utilization of Bexel
an advanced training for its format to IFC before importing it
Manager would cost PTPP to Bexel Manager, which if not
staff in order to utilize it
an additional 2400€ /year done properly would cause some
optimally.
for each users. loss of information

20