Presentation Outline

01 02 03
CY 2023 Feasibility Summary of Program Of Works
Study and Detailed Preliminary Feasibility
Engineering Proposal Report/ Project
Identification
LIST OF CY 2023 PROJECTS UNDER FEASIBILITY
STUDY AND DETAILED ENGINEERING
MODE OF
MUNICIPALITY/ ALLOCATION IMPLEMENTATION SUBMITTED DOCUMENTARY
NAME OF PROJECT PROVINCE TYPE OF STUDY (‘000) REQUIREMENT
Old Feasibility Study Report (1992)
Aliabon SRIP Dinalupihan, Bataan Feasibility Study 19,000 By Contract POW Submitted
(Revised POW – Nov. 28, 2022)
Upper Bagsit RIS Palauig, Zambales NIS Modernization 6,500 FAW Pre-Feasibility Report (April 29, 2022)

TOTAL 25,500

Note: Include Projects under Modernization and Watershed Program


Summary of Preliminary FS Report and Project
Identification Report
ALIABON SRIP (1992)
Project Description: Aliabon Dam will be constructed along the Aliabon River, about 5 ½ km
from the Poblacion of Dinalupihan, Bataan
Scheme of Development: Construction of a storage reservoir of homogeneous earth fill structure –
height: 30.0m above streambed and a crest length of 91m at El. 112m.
Potential Service Area : 350 hectares (as per old FSR)
(new, rehab/restore) 600 hectares as reported by PAMBAT IMO
Result of the Preliminary FS
Report/ Project Identification Technically feasible and economically viable with an EIRR=16.54%
Project Layout (if available)
Aliabon
SRIP:
Project
Layout
Summary of Preliminary FS Report and Project
Identification Report
UPPER BAGSIT RIS (Modernization 2022)
Project Description: Modernization of existing NIS to provide sustainable irrigation water
services to the farmers and optimize the utilization of water resources of
the existing dam of UBRIS
Scheme of Development: Rehabilitation of structures; telemetry; gate automation & solar power;
gauging stations; and discharge measurement structures
Potential Service Area :
(new, rehab/restore) Restoration: 809 ha
Result of the Preliminary FS
Report/ Project Identification Passed the preliminary economic evaluation
Project Layout (if available)
Timeline of Submission
Programmed Commitment Date
Project Allocation Document
Activity
<insert commitment for not yet completed requirements such as POW, Pre-FS Report, Project-ID Report>
Pre-FS (Old FSR) Submitted
Aliabon SRIP FS 19,000 POW (P20M) Submitted
Revised POW Nov. 28, 2022
Submitted
Pre-FS (April 29, 2022)
Upper Bagsit RIS NIS Modernization 6,500
POW Nov. 28, 2022
PROGRAM OF WORKS

Proposed Schedule of Activities: Aliabon SRIP