You are on page 1of 10

Contract Engagement

Agreement (CEA)
1. PARTIES TO THE AGREEMENT
This agreement is entered between

6. PAYMENT SCHEDULE
st

1 payment
40% upon commencement of course
Akademi Binaan Malaysia Wilayah Tengah
nd
And
2 payment
SEGI Management Sdn Bhd
40% in mid course
rd

Herein after referred to as the Client as identifies


3 payment
in the signature section below :
20% before end of course
2. PURPOSE OF THE AGREEMENT

7. CONFIRMATION

SEGI wishes to engage the services of ABM


Theas
contract confirmed and mutually agreed.
stipulated in Annex 2.
8. LIASON OFFICER
3. PROGRAM DESCRIPTION
SEGI
Title
: Construction Technique
Name 1 : Nancy Wong
(Manager, Group Special Projects)
Location : ABM Wilayah Tenggah
017-208 0831
Name 2 : Kelvin Koay
Participants : Annex 1 List of participants
(Senior Manager, Group Marketing &
Project)
Course
: Sept November 2014 (TBC)
012-532 7995
Dates
ABM
4. LIST OF PARTICIPANTS
Name 1 : Mazlan Bin Musman
(Ketua Unit, Kerja Awam & Structure)
As above in clause 3.
016-677 9088
Name 2 : Aswat Bin Hj Ahmad
5. FEES refer Annex 3 as attached below
(Unit Head, Promotion & Corporate)
012-598 5727
Ringgit Malaysia seventy three thousand only
RM 73,000.00 only

AKADEMI BINAAN MALAYSIA WILAYAH TENGAH


SEGI MANAGEMENT SDN BHD
(ABM)
(SEGI)
Verified and agreed by :
Request and agreed by :

Name :
Position :
Date :

Name :
Position :
Date :

ANNEX 1 LIST OF PARTICIPANTS

ANNEX 2 Programme
1. Construction Technique

MODULE

Learning Package
Domain of Training
Target Candidates:
Performance Objective

:
:
:
:

Training Duration
Method of Delivery

:
:

Training Approach

Training Content

Assessment
Certification

:
:

TRAINING CONTENTS

TOPIC

TASK
NO

01

READ AND UNDERSTAND


TECHNICAL DRAWING

PREPARE ESTIMATIONS
REQUIRED FOR PROJECTS

SUGGESTED
DURATION
(HOURS)

CONTENTS

01.03

Adhere to site safety equipment

01.04

Demonstrate the use of fire fighting equipment

01.05

Apply emergency first aid techniques

02.01

Draw basic technical drawing


Identify various symbols in technical drawing &
building plan
Interpret
Draw
approval
detail
building
drawing
plans
for given jobs

02.03

10

02.04
02.05

03

Prepare progress charts

01.02

02.02
02

COSTRUCTION TECHNIQUE

Use safety attires & gears while performing


various job
Comply with tools & equipment safety rules

01.01
PRACTICE SAFETY
PRECAUTION

Construction Technique
Vocational Skills Upgrading Construction
Vietnamese Vocational Training Instructors
To enhance acquired vocational skills in
Construction
3 months Vocational Skills Upgrading
Classroom Experience (Theory/ Demonstration/
Simulation/ Role Play),
Lab-place Experience (Practical Session/ HandsOn Training)
1. Competency-based Training System (CBT)
2. Project Based.
Based on Malaysian National Occupational Skills
Standard (NOSS),
and/ or Malaysian National Competency Standard
(NCS)
Continuous assessment and final test
1. Malaysian Skills Certification/ Malaysian
Statement of Achievement

03.01
03.02

Draw & submit amendment

drawings for

PHUIRUP WaNLQJ RII IURP JLYHQ GUaZLQJV

10
8

04

05

06

PREPARE FOUNDATION

PERFORM FORMWORK

ERRECT SCAFFOLDING

03.03

Prepare schedule to order materials & costs

03.04

Prepare estimation of man-days/ costs

03.05

Identify machineries needed & costs

04.01

Perform piling works

04.02

Excavate trenches

04.03

Provide pest control services

04.04

Construct timbering & shoring

04.05

Pour & screed lean concrete on the trenches bed

04.06

Perform pile cap works

05.01

Identify materials & fabricate


members to required shapes & sizes

05.02

Erect formwork for stump

05.03

Erect & dismantle formwork for lintel

05.04

Erect formwork for ground beam

05.05

Erect formwork for column

05.06

Erect formwork for upper floor beam/ roof

05.07

Erect formwork for floor slab

05.08

Dismantle formwork accordingly

05.09

Erect formwork for arches

05.10

Erect formwork for staircase

05.11

Install necessary fasteners needed

06.01

Identify & select scaffolding


Prepare, erect & dismantle
Place
& compact concrete
scaffolding

06.02

07

06.04

Prepare, erect & dismantle dependent scaffolding

07.01

Identify types of materials & prepare for required


reinforcement

07.03

Fabricate & place reinforcement up to 2-storey


building
Make spacer blocks

07.04

Install necessary spacers

07.05

Lay damp proof course membrane

07.07

08

08.01
08.02
08.03

22

independent

Prepare, erect & dismantle suspended scaffolding

07.06

PERFORM CONCRETE
WORKS ACCORDING TO
SPECIFICATIONS

formwork

06.03

07.02
FABRICATE
REINFORCEMENT
ACCORDING TO
SPECIFICATIONS

12

Fabricate & place reinforcement in position up to


4-storey building
moreconcrete
Mix
than 4-storey
according
building
to proportions
Fabricate & place reinforcement in position for
Identify materials for concrete mixtures

10

18
18

09

10

11

CONSTRUCT ROOF
STRUCTURE INSTALL ROOF
COVERING AND CEILING

INSTALL FRAMES AND


PANELS

LAY BRICKS ACCORDING


TO SPECIFICATIONS
REQUIRED

08.04

Perform curing concrete

08.05

Perform concrete test

08.06

Identify types of building services required

08.07

Install outlet traps

09.01

Select & prepare materials for roof structures

09.02

Select & prepare materials for roof covering

09.03

09.05

Fix roof structures


Fix roof covering complete with
insulation materials
Prepare structures & fix ceilings

10.01

Select frames & fix fasteners on frames

10.02

Prepare & fix frames

10.03

Erect lintel over frames

11.01

Identify & select materials

11.02

Prepare mortar according to proportions

11.03

Construct stretcher, English & Flemish bond wall


in various forms with pointing & jointing

11.04

Construct door & window opening on brick wall

11.05

Construct rough arches

11.06

Construct axe arches

11.07

Construct isolated piers

11.08

Construct attached piers

11.09

Construct decorative brickworks

11.10

Construct
Erect
gabion
reinforced
masonrybrickworks
walls

11.11

Construct brick footings

11.12

Construct pavior

11.13

Construct block & slab pavior

11.14

Erect coping & capping on brickwork

11.15

Construct curve wall

11.16

Construct brick step

11.17

Construct hollow block walls


Construct hollow block reinforcement wall &
columns
Lay off damp proof course in brickwork
Construct
ashlars
type
random
rubble
retaining
walls
walls
Identify
&masonry
select masonry
materials

09.04

11.18
11.19
12.01

foil and

12.02
12

PERFORM / CONSTRUCT
MASONRY WALL

12.03
12.04
12.05

Construct decorative masonry walls including

16

34

18

13

14

15

INSTALL INTERNAL
ELECTRICAL CABLE
SYSTEM

PREPARE LAY OUT OF


INTERNAL SANITATION
SYSTEM

INSTALL INTERNAL WATER


SUPPLY SYSTEM

13.01

Install cable running in conduit

13.02

Install cable running in conduit laid inside wall

13.03

Install electricity meter

13.04

Install control panel

13.05

Install control panel inside wall

13.06

Install circular lamp

13.07

Install fluorescent lamp

14.01

Identify & select material

14.02

Perform installation of sanitation system

15.01

Read drawing (study design document)

15.02

Prepare tools, equipments and materials

15.03

Mark and locate pipe route

15.04

Dig trenches to lay pipe

15.05

Fabricate pipe

15.06

Install pipe and joint

15.07

Install water meter

16.01

Identify & select materials

16.02

Prepare mortar according to required proportion

16.03

Prepare plain vertical surface


Perform plastering on plain vertical surfaces with
finishers
Prepare curve vertical surfaces for plastering
Perform plastering on curve vertical surfaces with
finishers
Set out & lay pre cast terrazzo
Perform rough cost finish on plastered works

16.04
16.05
16

PERFORM PLASTERING
AND RENDERING WORKS

16.06
16.07
16.08
16.09
16.10

17

PERFORM WALL AND


FLOOR FINISHING

Perform plastering works on non masonry


structures & special purpose

17.01

Identify & select materials

17.02

Prepare vertical backing surface

17.03

Prepare adhesive for tiling & mosaic fixing

17.04

Set out & lay tiles on walls


Perform
Set
out &rendering
lay mosaic
tile on&floor
on
apply
floor
wall
for backing surface

17.06
17.07
17.08
17.09

16

22

Prepare overhead surfaces for plastering


Prepare plastering for overhead works with
finishers
PHUIRUP VKaQJKaL ILQLVK RQ SOaVWHUHG ZRUNV

16.11

17.05

16

26

17.10

Set out & perform cast in-site terrazzo

17.11

Perform grinding & polishing work on terrazzo

17.12

Set out & lay square marble

17.13

17.19

Set out & lay broken marble


Perform grinding & polishing work on marble
floor
Set out & lay parquet on floor
Perform grinding & polishing work on parquet
floor
Set out & lay polyvinyl chloride tiles
Identify, select & prepare materials for painting
works
Prepare background surfaces for painting works

17.20

Perform water based painting works

17.21

Perform oil based painting works

18.01

Draw decorative form

18.02

Read decoration drawing

18.03

Cover with flat pattern on plain surface

18.04

Cover with concave pattern on plain surface

18.05

Cover with letter on plain surface

18.06

Cover with concave letter on plain surface

18.07

Decorate pier cap

19.01

19.03

Identify & select materials


Set the gradient & excavate trenches for sewerage
system
Begin, joint and end the welding process
Prepare bed for laying sewerage drain pipe

19.04

Lay & joint pipes

19.05

Set out & construct manholes

19.06

Set out & construct septic tank & disposal system

19.07

Set out the gradient & dig trenches for drainage

19.08

Lay & joint drains

19.09

Lay & joint culverts

19.10

Construct sump trap

20.01

Identify & select materials

17.14
17.15
17.16
17.17
17.18

18

DECORATE WALL SURFACE

19.02

19

20

INSTALL DRAINAGE AND


SEWERAGE SYSTEM

INSTALL FENCES

20.02
20.03
21.01

21

WELD BY ELECTRIC ARC


WELDING METHOD

21.02
21.03

Set out & construct chain fences with valid steel


pipe
post electric from arc reaction
post gate
Make
welding
Set out & construct brick work & masonry gate
Operate electric arc welding machine

12

20

18
6

22

23

PERFORM REPAIRING AND


EXTENSION WORKS

PERFORM SUPERVISORY
FUNCTIONS

21.04

Joint steel

21.05

Joint steel with backing bar

21.06

Joint steel with backing sheet

21.07

Cut steel

22.01

Detect & repair minor defects

22.02

Detect & repair major structural defects

22.03

Make preparation & planning for extensions &


renovation works

22.04

Describe demolishing works

23.01

Handle subordinate attendance

23.02

Supervise subordinate discipline

23.03

Conduct In - House training

23.04

Conduct sectional Meeting

23.05

Conduct motivational activities

23.06

Supervise teamwork

12

SEMINAR AND FINAL ASSESSMENT


TOTAL HOURS

12
360

a) Training Location

: Akademi Binaan Malaysia (Wilayah Tengah) ABM


Lot 8, Seksyen 91, Jalan Chan Sow Lin, 55200 Kuala Lumpur.

b) No.of trainees

: 14 pax

c) Interpreter

: 1 pax

d) Coordinator

: 1 pax

e) Training Materials
ABM need to provide the soft copy of the training material (info sheets, PPTs, work sheet /
practical sheets, assessment) at least 1 week in advance before initialing the training course for
translating purpose. One set of hard copy of training material for interpreters and also one set
for SEGI.
f) Certification

: xxx

g) Reports

: 1. Assessment reports (for each trainees)


2. Attendance reports (for each trainees)

h) Industrial visits

: TWO (2) industrial visits within 3 months of programme

i) Accommodation

1. Accommodation for 14 trainees + 1 interpreter + 1 coordinator


2 units (6 persons per house)
1 units (4 persons)
*Remarks : Interpreter and coordinator should stay separate room with trainees, no room
sharing for interpreter and coordinator, 1 single room each for convenient working.
2. Accommodation facilities :
Air condition
Shower heater
Television
Refrigerator
Kettle
Stove with gas tank
Sufficient cutlery (plate, bowl, spoon, fork, knife)
Flying pan / Pot
Bed sheet
Towel
Unlimited Wifi service
Once a week house cleaning service
j) Personal

Protective Equipment
3 training t-shirt
1 pair of safety shoes
Safety goggle
Safety helmet

ANNEX 3 FEES
No
Fees (RM)
1
Course fees (14 pax)
- Trainers
- Module / note / teaching materials
- Stationery
- Classroom for theory
- Practical training bay
- Consumables during practical
- Personal protective equipment
- Opening & closing ceremony
RM 3,500 / month
- 2 industrial visit with transportation
2

Accommodation (16 pax)


- 3 units apartment with 3 bedroom
RM 500.00 / month
each
- Unlimited Wifi
Transportation (16 pax)
- Airport pick up & back to airport
- Weekly trip to convenience stall /
supermarket / mall during weekends
(12 weekends)

GRAND TOTAL

Payment will be addressed to :


Akademi Binaan Malaysia (ABM)
Bank : xxx
Bank acc no. : xxx

Amount (RM)

RM 49,000.00

RM 24,000.00

RM 73,000.00

You might also like