PROJECT : THE SKYSUITES TOWER

LOCATION : 927 EDSA cor. Quezon Avenue, West Triangle, QC


SCOPE OF WORKS : ARCHITECTURAL WORKS
SUBJECT : WEEKLY SITE REPORT NO.2
PERIOD COVERED : March 17, 2017 - March 24, 2017
DATE : March 24, 2017

V. SAFETY

PREVIOUS THIS PERIOD TO-DATE


SAFE MANHOUR
6,864.00 1,232.00 8,096

VI. One Week lookahead Schedule (Mar. 25 to 31, 2017)


1 Enclosure of Drywalls at 2F Zone B
2 Installation of Ceiling Frames at Podium Loft Units
3 Installation of Drywalls at Laundry Area
4 Installation of Drywalls at 2F Zone C
5 Installation of Drywall Framings at Model Units in GF
6 Enclosure of Drywalls at Model Units in GF

VII. TOOLS AND EQUIPMENT

FRI SAT SUN MON TUE WED


DUBBEL TOOLS
3/17/2017 3/18/2017 3/19/2017 3/20/2017 3/21/2017 3/22/2017

Hilti Laser 1 1 1 1 1
Hilti Drill Chordless 2 2 2 2 2
Drill 7 7 7 7 7
Grinder 4" 2 2 2 2 2

SUB TOTAL 12 12 0 12 12 12

VIII. PICTURES

Installation of Drywall Partitions Installation of Ceiling Frames


(Framing)
PROJECT : THE SKYSUITES TOWER
LOCATION : 927 EDSA cor. Quezon Avenue, West Triangle, QC
SCOPE OF WORKS : ARCHITECTURAL WORKS
SUBJECT : WEEKLY SITE REPORT NO.2
Installation of
PERIOD COVERED : MarchDrywall Partitions
17, 2017 - March 24, 2017
(Framing)
DATE : March 24, 2017

Installation of Door Portals Installation of Water Meter Cover

IX. ISSUES AND CONCERN