CONSTRUCTION OF PROPOSED Doc.

No: LHP/MS/022
RESIDENTIAL PROJECT AT 104 CHITHRA Revision:0
LANE, COLOMBO 5
FOR Date: 17//07/2017
ASIA BROADCASTING (PVT) LTD

METHOD STATEMENT FOR REPAIRING OF UNUSUAL FORMATION OF

CONCRETE WALLS & COLUMNS


OBJECTIVES: To formulate guide lines for covering up, surface defects in concrete without
compromising the quality of concrete.

REFERANCE: Inspection

Method statement for Mapefill GP

EQUIPMENTS: Cement pan

Mason trowel

Sponge

Chisel & hammer

High pressure gun

Hand gloves

No Procedure Responsibility Checked by Records


1 Remove the loose material in concrete surface Foreman AE
by using a chisel & hammer. TO
2 Clean the surface with high pressure gun & Foreman AE
allow to drying for about 30 minutes. TO
3 Request for inspection Foreman TO

4 Prepare the MAPEFILL GP mix by using a Foreman TO


cement pan by adding water & stair well

5 Apply the mix using a mason trowel & finish the AE SM


surface with a wet sponge’
6 Request for inspection TO AE
7 Ensure the HSE during the entire process Safety officer SM

OUTPUT RECORDS:

1 Inspection

Prepared by Approved by
Signature
Name Haritha Jayasinghe Rohith Thirimavithana
Designation AE PM
Date 17-07-2017 17-07-2017