Professional Documents
Culture Documents
DRAWINGS
DECEMBER, 2019
Start ch:109+300
End ch:113+400
END OF KASARGOD DISTRICT Start ch:128+550
START OF KANNUR DISTRICT
KM : 104+000
Payannur Bypass
End ch:134+200
Length - 4.10 Km Start ch:139+400
Thaliparambha Bypass
Length - 5.65 Km
End ch:166+200
Kannur Bypass Start ch:170+150
Length - 26.80 Km
End ch:188+300
Thalaserry Bypass
Mahe Bypass
Length - 18.15 Km
THALIPARAMBA (KUTTIKKOL)
CONSULTANTS:
LENGTH OF
PACKAGE-II SECTION-2
KM 32.700
PROJECT:-
DWG NO.: - AECOM/HW/DELD15170/DPR/ LIST
CONSULTANCY SERVICES FOR PREPARATION OF DPR FOR
NATIONAL HIGHWAYS AUTHORITY OF INDIA KERALA/KARNATAKA BORDER TO VENGALAM SECTION FROM
(Ministry of Road Transport & Highways)
LIST OF DRAWINGS DATE:- DECEMBER, 2019 PAPER :- A2
9th Floor, Infinity Tower C, DLF Cyber City, KM 17.200 TO KM 230.000 OF NH-17 (NEW NH-66)
Dwarka, New Delhi - 10075 DLF Phase II,Gurgaon-122002, Haryana, India. DRAWN (A) DESIGN (B) CHECKED (C) APPROVED (D)
(PACKAGE-KL/17/I)
Package II, Section 2 ( From Exist. Km 137+900 to 170+600)
( Design Ch. 134+650 to 164+958) JB TP AG APS
PROJECT:-
DWG NO.: - AECOM/HW/DELD15170/DPR/ LIST
CONSULTANCY SERVICES FOR PREPARATION OF DPR FOR
NATIONAL HIGHWAYS AUTHORITY OF INDIA KERALA/KARNATAKA BORDER TO VENGALAM SECTION FROM
(Ministry of Road Transport & Highways)
LIST OF DRAWINGS DATE:- DECEMBER, 2019 PAPER :- A2
9th Floor, Infinity Tower C, DLF Cyber City, KM 17.200 TO KM 230.000 OF NH-17 (NEW NH-66)
Dwarka, New Delhi - 10075 DLF Phase II,Gurgaon-122002, Haryana, India. DRAWN (A) DESIGN (B) CHECKED (C) APPROVED (D)
(PACKAGE-KL/17/I)
Package II, Section 2 ( From Exist. Km 137+900 to 170+600)
( Design Ch. 134+650 to 164+958) JB TP AG APS
TYPICAL CROSS SECTION
45000
C
L OF PROPOSED MEDIAN
13750 13750
500 500 1500 10500 500 500 500 10500 1500 500 500
LEFT CARRIAGEWAY RIGHT CARRIAGEWAY
SHYNESS
SHYNESS
KERB SHYOFF
KERB SHYOFF
PS PS
1500 250
7000 2.5% 2.5% 7000
LEFT SERVICE ROAD RIGHT SERVICE ROAD FOOTPATH
1500 CUM
FOOTPATH UTILITY
CUM CORRIDOR
UTILITY
CORRIDOR
~
~
~
RAILING
~
OGL
~
2.5%
2.5%
~
EXISTING CARRIAGEWAY
~
~
OGL
TCS 1: TYPICAL CROSS SECTION FOR MAIN CARRIAGEWAY AND SERVICE /SLIP ROAD AT DIFFERENT LEVEL
WITH REWALL IN BETWEEN (SERVICE ROAD AT LOWER LEVEL WITH ARRANGEMENT
FOR CUT AND FILL.)
45000
1500 7000 500 500 1500 10500 500 500 10500 1500 500 500
KERB SHYOFF
KERB SHYOFF
SERVICE ROAD LEFT CARRIAGEWAY RIGHT CARRIAGEWAY
SHYNESS
SHYNESS
FOOTPATH PS PS 250
7000 1500
CUM SERVICE ROAD
UTILITY FOOTPATH
CORRIDOR CUM
UTILITY
CORRIDOR
C
L OF PROPOSED MEDIAN RAILING
02
2.5% 2.5% 2.5% 2.5%
~
~
EXISTING CARRIAGEWAY
~
OGL
NOTES:
TCS 1A: TYPICAL CROSS SECTION FOR MAIN CARRIAGEWAY AND SERVICE /SLIP ROAD AT SAME LEVEL
1. ALL DIMENSIONS ARE IN MILLIMETRE
WITHOUT RETAINING STRUCTURE IN BETWEEN.(ARRANGEMENT FOR CUT AND FILL)
2. GENERAL ARRANGEMENT IS SHOWN FOR CUT AND FILL SECTION FOR EACH TYPE
OF CROSS SECTION. AS PER SITE CONDITION APPLICABLE ARRANGEMENT OF CUT /
FILL ON LHS/RHS/BHS TO BE DECIDED DURING EXECUTION.
3.CUT SLOPE SHALL BE SUITABLY PROTECTED.
SCALE : - CLIENT:- DESIGN CONSULTANT:- PROJECT:- TITLE:
DWG NO.: - AECOM/HW/DELD15170/DPR/ TCS/01
CONSULTANCY SERVICES FOR PREPARATION OF DPR FOR
NATIONAL HIGHWAYS AUTHORITY OF INDIA KERALA/KARNATAKA BORDER TO VENGALAM SECTION FROM TYPICAL CROSS SECTION DATE:- December, 2019 PAPER :- A2
(Ministry of Road Transport & Highways) 9th Floor, Infinity Tower C, DLF Cyber City,
NTS KM 17.200 TO KM 230.000 OF NH-17 (NEW NH-66)
Dwarka, New Delhi - 10075 DLF Phase II,Gurgaon-122002, Haryana, India. DRAWN (A) DESIGN (B) CHECKED (C) APPROVED (D)
(PACKAGE-KL/17/I)
Package II, Section 2 ( From Exist. Km 137+900 to 170+600)
REV DATE DESCRIPTION OF REVISION JB TP AG APS
( Design Ch. 134+650 to 164+958)
C:\Users\royuk\appdata\local\temp\AcPublish_12156\Typical Cross Section -As perSchedule_Section-2.dwg
45000
C OF PROPOSED MEDIAN
13750 L 13750
1500 7000 LEFT CARRIAGEWAY RIGHT CARRIAGEWAY 7000 1500 250
FOOTPATH LEFT SERVICE ROAD RIGHT SERVICE ROAD FOOTPATH
CUM 500 500 1500 10500 500 500 500 10500 1500 500 500
CUM
UTILITY LEFT CARRIAGEWAY RIGHT CARRIAGEWAY
KERB SHYOFF
KERB SHYOFF
UTILITY
SHYNESS
SHYNESS
PS PS
CORRIDOR CORRIDOR
RAILING
2.5%
2.5%
EXISTING CARRIAGEWAY
~
2.5% 2.5%
~
~
~
TCS:-2 : TYPICAL CROSS SECTION FOR MAIN CARRIAGEWAY AND SERVICE /SLIP ROAD AT DIFFERENT LEVEL WITH OGL
RCC RETAINING WALL IN BETWEEN (MAIN CARRIAGEWAY AT LOWER LEVEL WITH ARRANGEMENT
FOR CUT AND FILL.)
45000
13750 13750
1500 7000 500 500 1500 10500 500 500 500 10500 1500 500 500 7000 1500 250
RIGHT SERVICE ROAD LEFT CARRIAGEWAY RIGHT CARRIAGEWAY RIGHT SERVICE ROAD
KERB SHYOFF
KERB SHYOFF
FOOTPATH FOOTPATH
SHYNESS
SHYNESS
PS PS
CUM CUM
UTILITY UTILITY
CORRIDOR CORRIDOR
C
L OF PROPOSED MEDIAN
02
RAILING
2.5% 2.5% 2.5%
2.5%
~
EXISTING CARRIAGEWAY
~
~
NOTES: TCS:-3 : TYPICAL CROSS SECTION FOR MAIN CARRIAGEWAY AND SERVICE /SLIP ROAD AT SAME OR UP 2.0M LEVEL
1. ALL DIMENSIONS ARE IN MILLIMETRE DIFFERENT WITHOUT RETAINING STRUCTURE IN BETWEEN. (ARRANGEMENT FOR CUT AND FILL)
2. GENERAL ARRANGEMENT IS SHOWN FOR CUT AND FILL SECTION FOR EACH TYPE
OF CROSS SECTION. AS PER SITE CONDITION APPLICABLE ARRANGEMENT OF CUT /
FILL ON LHS/RHS/BHS TO BE DECIDED DURING EXECUTION.
3.CUT SLOPE SHALL BE SUITABLY PROTECTED.
SCALE : - CLIENT:- DESIGN CONSULTANT:- PROJECT:- TITLE:
DWG NO.: - AECOM/HW/DELD15170/DPR/ TCS/02
CONSULTANCY SERVICES FOR PREPARATION OF DPR FOR
NATIONAL HIGHWAYS AUTHORITY OF INDIA KERALA/KARNATAKA BORDER TO VENGALAM SECTION FROM TYPICAL CROSS SECTION DATE:- December, 2019 PAPER :- A2
(Ministry of Road Transport & Highways) 9th Floor, Infinity Tower C, DLF Cyber City,
NTS KM 17.200 TO KM 230.000 OF NH-17 (NEW NH-66)
Dwarka, New Delhi - 10075 DLF Phase II,Gurgaon-122002, Haryana, India. DRAWN (A) DESIGN (B) CHECKED (C) APPROVED (D)
(PACKAGE-KL/17/I)
Package II, Section 2 ( From Exist. Km 137+900 to 170+600)
REV DATE DESCRIPTION OF REVISION JB TP AG APS
( Design Ch. 134+650 to 164+958)
C:\Users\royuk\appdata\local\temp\AcPublish_12156\Typical Cross Section -As perSchedule_Section-2.dwg
C
L OF PROPOSED MEDIAN
500 500 1500 10500 500 500 500 10500 1500 500 500
LEFT CARRIAGEWAY RIGHT CARRIAGEWAY
KERB SHYOFF
KERB SHYOFF
SHYNESS
SHYNESS
PS PS
27500
~
~
~
~ RAILING
~
OGL
~
2.5%
2.5%
~
EXISTING CARRIAGEWAY
~
TCS 4: TYPICAL CROSS SECTION FOR APPROACHES OF GRADE SEPARATOR
~
OGL
34000
500 4000 500
KERB SHYOFF
KERB SHYOFF
MEDIAN
LEFT CARRIAGEWAY C
ES PS 10500 RIGHT CARRIAGEWAY PS ES
1500 2500 10500 2500 1500 150mm THK.
GRANULAR
MATERIAL
OGL OGL
EXISTING CARRIAGEWAY
TCS - 5 : TYPICAL CROSS SECTION FOR STRETCHES WITHOUT SERVICE ROAD IN FILL ON BOTH SIDES (NO RETAINING STRUCTURE)
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETRE
2. GENERAL ARRANGEMENT IS SHOWN FOR CUT AND FILL SECTION FOR EACH TYPE
OF CROSS SECTION. AS PER SITE CONDITION APPLICABLE ARRANGEMENT OF CUT /
FILL ON LHS/RHS/BHS TO BE DECIDED DURING EXECUTION.
3.CUT SLOPE SHALL BE SUITABLY PROTECTED.
SCALE : - CLIENT:- DESIGN CONSULTANT:- PROJECT:- TITLE:
DWG NO.: - AECOM/HW/DELD15170/DPR/ TCS/03
CONSULTANCY SERVICES FOR PREPARATION OF DPR FOR
NATIONAL HIGHWAYS AUTHORITY OF INDIA KERALA/KARNATAKA BORDER TO VENGALAM SECTION FROM TYPICAL CROSS SECTION DATE:- December, 2019 PAPER :- A2
(Ministry of Road Transport & Highways) 9th Floor, Infinity Tower C, DLF Cyber City,
NTS KM 17.200 TO KM 230.000 OF NH-17 (NEW NH-66)
Dwarka, New Delhi - 10075 DLF Phase II,Gurgaon-122002, Haryana, India. DRAWN (A) DESIGN (B) CHECKED (C) APPROVED (D)
(PACKAGE-KL/17/I)
Package II, Section 2 ( From Exist. Km 137+900 to 170+600)
REV DATE DESCRIPTION OF REVISION JB TP AG APS
( Design Ch. 134+650 to 164+958)
C:\Users\royuk\appdata\local\temp\AcPublish_12156\Typical Cross Section -As perSchedule_Section-2.dwg
500 MEDIAN 500
4000
KERB SHYOFF
KERB SHYOFF
C
ES PS LEFT CARRIAGEWAY RIGHT CARRIAGEWAY PS ES
1500 2500 10500 10500 2500 1500 150mm THK.
GRANULAR
MATERIAL
3.0% 3.0%
2.5% 2.5%
3.0% 3.0%
45000
OGL
LEFT CARRIAGEWAY Median RIGHT CARRIAGEWAY
1500 2500 10500 500 4000 500 10500 2500 1500
ES PS CL PS ES
Embedment
Embedment
TCS 8: TYPICAL CROSS SECTION OF EMBANKMENT ARRANGEMENT AND GROUND IMPROVEMENT WORKS
TS =134786.29
SC =134841.29
4911.51
134+700
134+800
.51
MATC
.63
134+900
34966
CS =13
34991
H LIN
ST =1
00
PROW
PROW PROW
PROW
T S =1
PROW
PROW PROW
PROW
135+0
PROW
PROW PROW
PROW PROW
PROW PRO
PROW
W PR
PROW
OW
PR
PROW
OW
E
W
PROOW
PR
W
PPRROOW
OFC
OFC
W
PPRROOW
W
PPRROOW
PPRROOWW
40.000
OFC
OFC
OFC
OFC
PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW
38.000 PROW
PROW
PROW
PROW
36.000 PROW
MATC
34.000
LINE H
32.000
30.000
28.000
26.000
24.000
22.000
20.000
18.000
Str. No: -
Chainage=134933.588m
16.000
Imp proposal:-
Prop. type of Str.:-
Prop. span arrangement:-
14.000
Exi.Ch.(as per Km post) 137+978
Design.Ch.(Km) 134+734
Chainage=134726.088m
12.000
Level=7.195m
10.000
8.000
Datum = 6.000
Proposed FRL
10.049
10.703 10.839
11.703 11.725
12.703 12.703
13.703 13.703
14.703 14.703
15.703 15.703
16.703 16.703
7.195
7.195
7.195
7.195
7.218
7.334
7.545
7.853
8.258
8.758
9.356
LME
Proposed FRL
5.150
5.150
5.150
5.150
5.175
5.351
5.693
6.202
6.878
7.720
8.703
9.703
RME
Ground below
10.616 10.550
4.263
2.089
2.283
3.122
3.461
5.016
5.076
4.383
3.588
3.917
5.638
6.196
6.792
7.381
7.884
8.384
9.060
9.736
Proposed LME
Ground below
4.843
4.794
4.952
5.041
5.024
5.018
4.991
4.905
4.926
5.253
5.750
6.228
6.784
7.354
7.857
8.373
9.061
9.776
Proposed RME
Level @ 15m
11.048 10.294
1.879
1.820
1.531
1.594
1.626
1.550
1.363
1.859
2.782
2.899
3.067
3.668
4.390
5.623
7.303
8.472
8.868
9.113
LHS
10.097
Level @ 15m
4.366
3.936
3.828
4.055
1.665
2.200
2.634
2.598
2.740
3.625
4.100
4.854
6.000
6.583
8.311
9.457
9.993
RHS
R=700.000m
Horizontal L=55.000m L=55.000m
Alignment L=136.287m L=70.220m L=25.122m
R=4150.000m
Vertical L=76.088m
L=207.500m
G=-0.000
Alignment
Superelevation Q=2.500 Q=2.500 Q=2.500 Q=4.100 Q=2.500 Q=2.500
(%)
Q=4.100
134650
134660
134680
134700
134740
134760
134780
134800
134820
134840
134860
134880
134900
134920
134940
134960
134980
135000
135020
Chainage (KM)
SC =135521.87
AL
581.78
.6 7
AM
7
14
36
CS =135
135+500
=1
00
91.87
PC
135+6
1353
400
1.78
0
10
PROW
PROW
135+
PRO W
PROW PRO
PROW
W
TS =
W
PROOW
6+
W
571
PR PPRROOW
OW
0
W
PPRROOW PRS37
13
W
PPRROOW
+70
OFC
56.79
W T
.77
PPRROOW TS33
.51
=13
MATC
2 OWW
WTS3 PPRRO
KMS
.63
300
W
PPRROO
135
OFC
43
WW
34966
ROO
W PPRRO
OWW
139 PPR
0
ST
W
PPRROO
1352
34991
MA
135+
36
5.86
1.79
WW OWW
PPRROO
=1
SC =135096.63
PPRRO
H LIN
WW
ROO
OFC
TC
ST =1
00
W W PPR
PPRROO
ST =
PT
0
OWW
581
PPRRO
TS =1
CS =13515
800
+00
00
135+0
H
W
PPRROO
OFC
PROW WW
OFC
PROW
135+2
PROW OWW
ROO
=1 3
LIN
W W PPRRO
E
PPRROO PROW
136
PPR
135+100
PROW
135
OFC
PROW
OFC
W
PPRROOW W W
PPRROO PROW OWW
OFC
OFC
PPRRO
OW
135+900
E
PROW
OFC
1
PC
OFC
W TS3
OFC
WW
W
PPRROOW
W
PPRROO ROO PR
OFC
PPR
W
W
PPRROOW W PRO OWW
W PRO PPRRO
W
PPRROOW PPRROOW W W
W PRO PRO OWW OOWW OW
PPRROOW PPRR PR
W
PPRROOW PPRRO
OFC
W
W
PROOW PRO
W
PROOW
PR PR PRO
W
TS3 W W
PR
PROW W
PROW PPRROO
WW
OW PROW
PROW PRO W 4 PPRROO
PRO W W OW
W
PRO
PPRROOW PROOW
PR PR
W PRO
PROW W
PROW
PRO
PRO W
OFC
OFC
W OW
PRO PR
OW
PROW
PRO
W W PR
PROW PRO
OFC
W
PRO
OFC
PROW OW
PR
W
PRO
PROW TS30 PROW
PROW PROW PRO
W
PRO
W
PROW PROW
PROW PROW PROW TS3
PROW PROW
5 6
MA
TS3
MATC
PROW PROW
PROW PROW
TC
HL
H LIN
Str. No: -
INE
Ext. type of Str. :-
Ext. span arrangement :- BA
E
RHS
RME
Vertical
DATE
Horizontal
Alignment
Alignment
Datum = 6.000
Level @ 15m
Level @ 15m
10.000
12.000
14.000
16.000
18.000
20.000
22.000
24.000
26.000
28.000
30.000
32.000
34.000
36.000
38.000
40.000
8.000
Ground below
Ground below
Proposed FRL
Proposed FRL
Proposed LME
Proposed RME
Superelevation
Chainage (KM)
135000 10.097 9.113 9.776 9.736 15.703 15.703
Q=2.500
135040 12.282 11.274 11.427 11.336 17.703 17.703
DESCRIPTION OF REVISION
G=5.000
0
0
L=216.328m
Str. No: -
135060 13.404 10.802 11.972 11.888 18.703 18.703
L=105.000m
Imp proposal:-
SCALE : -
Design.Ch.(Km)
2
Ext. type of Str. :-
20
Prop. type of Str.:-
135080 12.613 10.106 12.494 12.425 19.703 19.703
4
40
135100 11.302 7.573 13.078 13.008 20.703 20.703
6
60
135120 9.784 11.887 13.686 13.650 21.703 21.703
135+110
Exi.Ch.(as per Km post) 138+347
Q=5.000
Q=5.000
10m
100m
135160 14.334 13.290 15.035 14.947 23.699 23.699
CLIENT:-
135200 17.315 15.553 16.469 16.369 25.610 25.610
L=105.000m
135240 19.603 16.890 17.738 17.629 27.403 27.403
Q=2.500
135300 23.354 18.932 19.697 19.660 29.869 29.869
L=337.500m
R=-13500.000m
L=135.077m
135360 24.534 20.748 21.280 21.214 32.068 32.068
Q=2.500
135400 26.538 23.227 22.671 22.640 33.387 33.387
DESIGN CONSULTANT:-
135460 28.196 26.269 24.720 24.727 35.142 35.142
L=130.000m
135480 28.521 28.218 25.347 25.411 35.668 35.668
Chainage=135487.417m
Level=35.855m
G=2.500
Chainage=135520.810m
L=33.393m
135520 29.613 29.617 27.148 27.228 36.670 36.670 Level=36.690m
PROJECT:-
Imp proposal:-
Chainage=135670.810m
Level=38.565m
135680 30.277 29.623 29.886 29.895 38.565 38.565
135+705
Exi.Ch.(as per Km post) 138+942
Q=2.500
L=57.866m
Q=2.500
TITLE:
JB
Chainage=135992.227m
Level=33.135m
DESIGN (B)
PR
OOW
W
OW
REV
(%)
LHS
LME
PPRRO
RHS
RME
PRO
OWW
Vertical
TS36
DATE
Horizontal
Alignment
Alignment
Datum = 26.000
PPRROO
Level @ 15m
Level @ 15m
W
28.000
30.000
32.000
34.000
36.000
38.000
40.000
42.000
44.000
Ground below
Ground below
W
Proposed FRL
Proposed FRL
Proposed LME
PROW
Proposed RME
Superelevation
Chainage (KM)
OF
C
PR
MATCH L INE
MATCH L
PROW
OW
PROW
136+000
136020 27.400 27.657 27.606 27.683 32.292 32.292
PROW
PROW
PROW
136040 27.379 27.242 27.632 27.709 31.778 31.778
DESCRIPTION OF REVISION
PT =136043.77
0
0
PRO
OF
C
136060 27.527 27.284 27.740 27.795 31.340 31.340 OF
C
PROW
W
PROW
SCALE : -
2
20
136080 27.649 27.387 27.841 27.876 30.979 30.979
PRO
PROW
W
PROW
4
40
136100 27.725 27.477 27.913 27.935 30.694 30.694 136+100
PRO
L=200.000m
PROW
R=5203.623m
W
L=103.899m
PROW
6
60
136120 -999.000 27.564 27.986 28.014 30.487 30.487
TS37
80
PROW
136140 -999.000 27.619 28.022 28.040 30.357 30.357
10m
100m
136160 27.541 27.903 28.084 28.100 30.303 30.303 OF
C
PROW
PROW
CLIENT:-
Chainage=136192.227m
Level=30.378m
136200 27.505 27.781 28.223 28.146 30.421 30.421
PROW
136+200
PROW
OF
C
PROW
OF
C
OF
C
PROW
BAKKALA
M
PROW
PROW
Q=2.500
PROW
PROW
PROW
06
PT =136357.
136360 30.302 28.154 28.979 28.925 31.290 31.290
OF
C
PROW
PROW
Q=2.500
136+400
PROW
G=0.543
L=421.592m
136420 29.101 28.674 29.518 29.446 31.616 31.616
PROW
PROW
DESIGN CONSULTANT:-
PROW
TS39
PROW
L=246.875m
136+500
PROW
PROW
PROW
OF
C
PROW
136+600
PROW
94
TS =136603.
Chainage=136613.819m
OF OF
C C
TS40
Level=32.670m
136620 30.723 30.676 31.068 30.989 32.706 32.706
PROW
PROW
PROJECT:-
136640 30.688 30.802 31.134 31.056 32.859 32.859
PROW
PROW
PROW
L=115.000m
FCC
L=200.000m
R=7255.515m
Exi.Ch.(as per
Design.Ch.(Km
Imp proposal:-
)
Prop. type of St
Ext. type of Str.
Str. No: -
(PACKAGE-KL/17/I)
r.:-
PROW
Imp proposal:-
Q=5.000
Q=5.000
Design.Ch.(Km)
ngement:-
R=500.000m
PROW
Km post) 140+
72.54
136+782
031
PROW
136+80
0
CONSULTANCY SERVICES FOR PREPARATION OF DPR FOR
Chainage=136813.819m
PROW
Level=36.513m
136820 30.533 31.129 31.557 31.522 36.717 36.717
PROW
PROW
TITLE:
L=115.000m
G=3.300
L=51.454m
OF
C
136860 29.795 31.487 32.072 32.014 38.037 38.037 Chainage=136865.273m
PROW
Level=38.211m
PROW
ST =
13
136900 30.411 32.526 32.837 32.838 39.256 39.256 6887
.54
PRO
136+
W
900
PLAN AND PROFILE
PRO
L=89.238m
ASAL
TS42
JB
A
PRO
DHAR
PRO
W
Q=2.500Q=2.500
L=198.000m
W
TS =
ASAL
INE
R=-6000.000m
.
Prop
1369
.
Ext.
OF
CH L
PRO
C
Ch.(
TP
A
76.78
Str.
MAT
W
s
N
prop
DESIGN (B)
r
Prop type of
INE
DATE:- DECEMBER, 2019
Ext. o: -
PRO
CH L
er K
W
S
:-
OF
C
a
MAT
of S
t
137+
PRO
000
Exi. span a tr.:-
W
as p rangem
AG
ost)
osal ngemen
PRO
m p nt:-
OF
C
W
t :-
PRO
W
OF
C
VENGALAM
L=115.000m
PRO
W
APS
PRO
W
PAPER :- A2
TS =137416.76
76
ST =137387.13
SC =137536.
72.13
9
137+500
05.8
137+400
2
137+300
CS =137
1376
MAN
CS = 0
GAD
60
HM-600
137+
Str. No: -
200
PROW PROW PROW PROW PROW
PROW PROW
OFC
PROW
Ext. type of Str. :-
PROW PROW
137+
PROW PROW
5.89
PROW
PROW
TS45
TS46 PROW Ext. span arrangement :-
0
Imp proposal:-
W
PRO
772
+70
OFC
PRO
OFC
OFC
W
Prop. type of Str.:-
W
PRO
OFC
137
=13
W
PRO
Prop. span arrangement:-
OFC
W
PRO
.7
W
PRO Exi.Ch.(as per Km post) 141+208
91
ST
OFC
W
TS47 PRO
0
0
OW 4 Design.Ch.(Km) 137+961
OFC
10
TS4
37
PR PROW PROW PROW PROW
MANGAD
OFC
PROW PROW PROW PROW W
7+
PROW PROW PRO
=1
7.90
0
PROW
OFC
OW
+80
PROW
13
PROW
PR
SC
W
PROW
PROW PRO
7 84
OFC
137
OFC
OW W W
PC =138085.68
MATCH LINE
PRO PRO W
PR PRO
= 13
PT =137990.58
OFC
3 W
PRO
W
T S4 PRO W
PRO
OW
PR
OFC
PC
W
0
PRO
OW PR
138+100
W
138+000
PRO
137+9
M
W W W TS4
RO RO PRO 8
AT
P P OWPR
0
OFC
00
OFC
CH
OFC
OW PRO
8
W
PR
7+
PRO
6.7
OW Str.
PR o: - :-
Str. N pe of Str. ment :-
LI
N
3
W
Ext. o: -
W
PRO
97
PRO
1
OW
NE
. ty n ge type PROW
6
Ext.
W PROW
span of S PROW PROW
PRO
OW
PROW
Ext. oposal:- s
PR Imp pan ar tr. :-
=
TS50 TS51
OW r.:-
OFC
r
TS
ra
W
p of St ement:- prop PRO
PR Imp Prop osa ngeme
OFC
OW . type ng - . l: nt :-
Prop pan arra st) 230 Prop type o -
W
PRO
PR
OW .s m po 137+ f Str
PR Prop .(as per K Exi.
. sp
an a . :-
OFC
W
C PRO TS49
h
OFC
) r
OW Exi.C .Ch.(Km Des h.(as p rangem W
PR n ign. er K e PRO
OW Desig Ch.( m p nt:-
OFC
42 - t r. : eme 2
AT
TS o: of S ang 32
MATCH LINE
OW
PR
r. N e rr 0+ 80
CH
OW n o
PR Ex p pro pe o arra m p
NE
y
Im p. t pan er K
o
OW Pr p. s (as p Km)
PR o . (
Pr i.Ch .Ch.
Ex sign
De
A
SAL
A MANGAD
RM
D HA
RHS
RME
Vertical
DATE
Horizontal
Alignment
Alignment
Datum = 12.000
Level @ 15m
Level @ 15m
14.000
16.000
18.000
20.000
22.000
24.000
26.000
28.000
30.000
32.000
34.000
36.000
38.000
40.000
42.000
Ground below
Ground below
Proposed FRL
Proposed FRL
Proposed LME
Proposed RME
Superelevation
Chainage (KM)
137000 31.437 33.470 34.072 34.023 41.144 41.144
DESCRIPTION OF REVISION
Str. No: -
L=115.000m
0
0
Chainage=137063.273m
Imp proposal:-
137060 33.230 33.420 33.366 33.282 41.477 41.477
Design.Ch.(Km)
Level=41.478m
Ext. type of Str. :-
SCALE : -
2
20
137080 33.021 33.123 33.291 33.173 41.478 41.478 Chainage=137086.032m
Ext. span arrangement :-
G=0.000
Prop. span arrangement:-
Level=41.478m
L=22.759m
4
40
137100 32.288 33.339 33.221 33.160 41.462 41.462
137+080
Exi.Ch.(as per Km post) 140+322
6
60
137120 31.289 33.225 33.246 33.170 41.382 41.382
CLIENT:-
Q=5.000
Q=5.000
L=180.354m
R=490.000m
137200 32.201 33.502 33.762 33.771 40.396 40.396
L=198.000m
R=-6000.000m
137220 30.588 33.120 33.704 33.705 39.982 39.982
Str. No: -
Imp proposal:-
Design.Ch.(Km)
Ext. type of Str. :-
Level=38.211m
L=115.000m
137360 33.116 -999.000 34.098 34.077 35.704 35.704
Q=2.500
L=29.625m
137420 33.428 -999.000 33.720 33.634 33.724 33.724
DESIGN CONSULTANT:-
137460 32.787 32.564 33.077 32.956 32.404 32.404
L=120.000m
137500 31.561 31.445 31.532 31.638 31.084 31.084
G=-3.300
137540 29.183 29.181 29.269 29.250 29.764 29.764
L=480.496m
137560 27.539 27.744 27.824 27.724 29.104 29.104
Q=5.000
Q=5.000
L=69.133m
R=480.000m
PROJECT:-
137640 22.227 22.121 22.225 22.342 26.464 26.464
Str. No: -
Design.Ch.(Km)
Ext. type of Str. :-
Design.Ch.(Km)
Ext. type of Str. :-
JB
APS
PAPER :- A2
DWG NO.: - AECOM/HW/DELD15170/DPR/ PP/122A
REV
58
PR
A
(%)
9 0.
LHS
LME
RHS
RME
TC
79 H
OW
3
Vertical
PR
OW
=1
LI
N
0
PR
DATE
PT E
Horizontal
00
Alignment
Alignment
+
1 38
Datum = 14.000
OW
M
Level @ 15m
Level @ 15m
16.000
18.000
20.000
22.000
24.000
26.000
28.000
30.000
Ground below
Ground below
TS
PR
Proposed FRL
Proposed FRL
Proposed LME
Proposed RME
Superelevation
50
Chainage (KM)
AN
G
W
O
138000 -999.000 15.467 15.331 15.375 20.351 20.351
W
O
PR
AD
PR
W
O
138020 -999.000 15.740 15.605 15.682 20.712 20.712 8
PR
.6
85
Q=2.500
0
O
8
PR
W
13
O
M =
PR
138040 14.822 16.239 16.110 16.183 21.157 21.157 A
PC 0
DESCRIPTION OF REVISION
W
0
TC
O
H +1
PR
8
L=95.101m
O
13
0
0
LI
PR
N
138060 16.368 17.124 16.815 16.840 21.685 21.685 Chainage=138064.528m
E
W
O
Level=21.816m
PR
E
TS
x
OW
SCALE : -
51
t.
PR
2
20
Q=2.500
s
W
Prop.
p
O
Ext. typ
Imp pro
a
Prop. s
PR
ty
: -
Design
n
C
a
a
OF
OW
as
n
rr
.Ch
4
PR
40
a
p
a
e of Str
OW
e
G=2.941
rr
pe of S
r
. :-
PR
L=67.732m
K
Exi.Ch.( .(Km)
tr.:-
M
OW
6
p
60
Str. No: -
gement
PR
o
AN
s
OW
:-
PR
G
Chainage=138132.260m
nt:-
Imp proposal:-
Design.Ch.(Km)
Level=23.808m
W
AD
80
O
OF
PR
00
PR
+2
138
1+461
10m
W
100m
138160 -999.000 24.540 23.088 23.204 24.595 24.595
W
PRO
PRO
138+214
Exi.Ch.(as per Km post) 141+461
W
CLIENT:-
W
PR O
Q=5.000
Q=5.000
PRO
L=201.316m
R=265.000m
PROW
PROW
PT =138287.00
138260 -999.000-999.000 25.116 25.168 26.960 26.960
PROW
TS =138379.08
PROW
L=92.084m
138360 26.568 27.276 27.577 27.559 28.584 28.584 138+400
PROW
PROW
Q=2.500
138380 -999.000 27.982 27.997 27.919 28.820 28.820
Q=2.500
PROW
PROW
PROW
MAN
G
AD
PROW
L=105.000m
DESIGN CONSULTANT:-
SC =13
8 484.08
138460 26.978 26.817 27.763 27.739 29.467 29.467
PROW
L=638.075m
OF
138+5
PROW
00
R=-13500.000m
138480 26.984 26.444 27.557 27.434 29.555 29.555
ROW
W
P
PRO
W
PRO
CS
=1 3
GAD
PRO
Q=5.000
Q=5.000
0.60
TS5
L=56.515m
4
W
R=330.000m
W
PRO
OW
+6
O
00
W
PRO
OW
PR
OF
L=105.000m
Q=2.500
ST
= 13
138620 28.640 -999.000 28.987 28.916 29.340 29.340
OW
86
45
PR
OW
. 60
PR
PROJECT:-
C
OF
C
OF
PR
OW
PR
PC
138660 -999.000 27.552 28.502 28.577 29.012 29.012 13 =13
8+
OW
70 869
Q=2.500
0
PR
OW
6.3
4
TS5
PR
5
W
PR
C
OF
PRO
W
OF
PRO
(PACKAGE-KL/17/I)
Str. No: -
PROW
138+8
00
Imp proposal:-
PROW
Prop. type of Str.:-
Chainage=138770.335m
Level=27.492m
PROW
PROW
Str. No: -
L=190.221m
R=-385.000m
Imp proposal:-
Design.Ch.(Km)
PT =138886.56
Ext. type of Str. :-
138+900
C C
TITLE:
OF OF
138+878
Exi.Ch.(as per Km post) 142+116
PROW
C
VENGALAM
OF
PROW
PROW
MATCH LINE
138940 -999.000-999.000 18.803 18.889 24.463 24.463
C
JB
PROW
TP
DESIGN (B)
PROW
PROW
139+100
TS57
PROW
PROW
APS
DWG NO.: - AECOM/HW/DELD15170/DPR/ PP/123
PAPER :- A2
PROW
PROW
Imp proposal:-
Design.Ch.(Km)
Ext. type of Str. :-
Exi.Ch.(as per Km p
Ext. span arrangeme
REV
(%)
LHS
LME
RHS
RME
Vertical
PROW
DATE
PROW
Horizontal
Alignment
Alignment
Datum = 6.000
Level @ 15m
Level @ 15m
10.000
12.000
14.000
16.000
18.000
20.000
22.000
24.000
26.000
8.000
Ground below
Ground below
Proposed FRL
Proposed FRL
Proposed LME
Proposed RME
Superelevation
Chainage (KM)
PROW
PROW
MANGAD
139000 -999.000 18.880 20.770 20.760 23.391 23.391 MATCH L
INE
INE
MATCH L
C
OF
139+000
PROW
139020 -999.000 19.560 21.337 21.353 23.034 23.034
PROW
139040 23.139 19.838 21.705 21.713 22.677 22.677
DESCRIPTION OF REVISION
PROW
PROW
0
0
139060 22.562 -999.000 21.864 21.887 22.320 22.320
MANGAD
PROW
PROW
SCALE : -
2
20
139080 21.863 19.197 21.613 21.664 21.962 21.962
PROW
4
PROW
40
139100 20.891 18.436 20.810 20.848 21.605 21.605
TS57
139+100
6
60
PROW
Str. No: -
Imp proposal:-
Design.Ch.(Km)
PROW
10m
100m
139160 -999.000 18.383 18.783 18.862 20.534 20.534
Imp proposal:-
Design.Ch.(Km)
PROW
Prop. type of Str.:-
Prop. span arrange
PROW
Ext. span arrangeme
ment:-
CLIENT:-
139+201
Exi.Ch.(as per Km post) 142+439
PROW
PROW
L=607.521m
139+200
139+201
post) 142+439
C
OF
PROW
Q=2.500
139220 -999.000-999.000 19.009 19.098 19.462 19.462
PROW
C
OF
Q=2.500
C
G=-1.786
C
L=945.403m
139260 20.677 20.529 20.467 20.585 18.748 18.748
PROW
PROW
139+300
PROW
TS59
PROW
Str. No: -
Str. No: -
Imp proposal:-
Design.Ch.(Km)
PROW
Design.Ch.(Km)
PROW
DESIGN CONSULTANT:-
139460 17.193 -999.000 17.302 17.201 15.177 15.177
Ext. span arrangement :-
PROW
PROW
C
OF
PROW
PROW
C
OF
PROW
C
OF
L=95.000m
139560 13.701 12.875 13.752 13.614 13.391 13.391
PROW
OF
PROW
SC =139589.08
PROW
PROW
C
OF
C
OF
PROW
I
PROJECT:-
139640 9.205 9.231 8.822 8.783 11.962 11.962
PROW
PROW
L=133.156m
PROW
R=-550.000m
PROW
00
KALLI
139+7
PROW
PROW
CS =
SSER
Level=10.610m
I
PROW
PROW
TS61
143
Ext .
Im
Pr
W
t
D
p
(PACKAGE-KL/17/I)
.
pr
PRO
s
o: -
PRO
span
ig
h
. sp
n
a
a
r r
W
ang
. :-
of St
PRO
PRO
Exi.C .Ch.(Km
Ext. oposal:- .:-
)
Km
L=100.000m
+80
o
L=95.000m
Str. N pe of Str ement :-
R=7777.540m
139
W
OF
s
.24
PRO
PRO
817
139
type rrangem t) -
Chainage=139815.738m
C
Level=9.467m
PRO
854
PRO
Design.Ch.(Km)
Ext. type of Str. :-
TITLE:
PRO
OF
PRO
PRO
139+854
0
139880 6.750 6.732 6.903 6.818 9.146 9.146 +90
139
W
W
PRO
PRO
W
PRO
W
PRO
PRO
JB
W
PRO
DRAWN (A)
HL TC
INE
0
W
+00
W
PRO
3
PRO
TP
C
OF
DESIGN (B)
MA
PRO
TC
PRO
HL
INE
140020 8.063 7.324 8.309 8.215 8.446 8.446
AG
W
W
PRO
PRO
C
OF
W
W
PRO C
OOFFC
PRO
APS
DWG NO.: - AECOM/HW/DELD15170/DPR/ PP/124
0
PAPER :- A2
+10
140
W
W
PRO
PRO
KERALA/KARNATAKA BORDER VENGALAM
KE
EC
HE
TS67
RI
OFC
TS66
OFC
ER
CH
KM
E S
14
KE TS 4
68
OFC
OFC
65
TS
OFC
-
No: tr. :- nt :-
Str. ype of S ngeme
t a
Ext. pan arr -
s l:
Ext. roposa tr.:- t:-
p p o fS men
Im
p . type arrange ost)
Pr o an r Km p
. sp e
Prop h.(as p
RI
OFC
KE C m)
E Exi. n.Ch.(K
H EC No:
- :- e s ig
EC Str. ment :- D
Str. e of ge
E HE . t y p a n
0.84
K Ext pan arr
RI s
Ext. roposal: tr.:-
-
KE335 ECHERI
OFC
nt:-
4109
p S
Imp type of eme 144+ 60
rang post)
MATCH
. r 9
P r o p n a 140+
MAT
. spa r Km
1
141+ 02.29
Prop h.(as pe )
CS =
000
C m
Exi. n.Ch.(K
CH L
ig
140+000
Des
141 0
LINE
.29
PRO
INE
SC =
40942
W
140+100
PRO
W
PROW 64
TS
PRO
00
PROW W
TS =1
PROW PRO
140+200
140+9
W
PROW
PROW PROW
OFC
.97
PROW PROW
PROW
FC
OOFC
140+300
PROW TS
40754
00
PROW
OFC
69
461.36
PROW
OFC
PROW
140+8
PROW
OFC
659.97
PROW
OFC
PROW
140+400
SC =140556.36
PROW
ST =1
PROW PRO
PROW W
TS =140
00
PROW PROW PROW PRO
OFC
W
PROW PROW
140+500
CS =140
140+7
PROW PROW PROW
PROW
TS70
140+600
PROW PROW PROW PROW
PROW PROW
PROW PROW
PROW PROW
TS63 PROW PROW PROW PROW
PROW PROW
MAT
PROW PROW
MATCH
PROW PROW
PROW PROW PROW
PROW PROW
PROW PROW
PROW PROW PROW PROW
CH L
PROW PROW PROW
PROW PROW
PROW
PROW PROW
LINE
PROW
Str. No:
INE
PROW
- PROW
Ext. type PROW PROW
of Str. :- PROW
Ext. spa PROW PROW
n arrang PROW
ement :-
PROW
Imp prop PROW
osal:- PROW
PROW
Prop. typ PROW PROW
e of Str.: PROW PROW
- PROW PROW
Prop. sp
PROW
an arran
HERI
Exi.Ch.( gement: Str. No
as per K - : -
Design.C
h.(Km)
m post)
- Ext. typ
Ext. sp
e of Str
. :-
KEEC
140+230 an
Imp pro arrangement
posal:- :-
Prop. ty : -
pe of S Str. No of Str. :- :-
Prop. s tr.:- x t. ty pe ement
Exi.Ch
pan arr
angem
E
sp a n arrang
.(as pe ent:- Ext. -
Design r Km p posal:
.Ch.(Km ost) - Imp pro e of Str.:-
) p nt:-
Prop.
ty ngeme
140+42
0 p . s p an arra p o st) - 00
Pro
.( a s per K
m 140+7
Exi. C h )
K m
.Ch.(
Design
OFC
SCALE : - CLIENT:- DESIGN CONSULTANT:- PROJECT:- TITLE:
DWG NO.: - AECOM/HW/DELD15170/DPR/ PP/125
0 20 40 60 80 100m CONSULTANCY SERVICES FOR PREPARATION OF DPR FOR
NATIONAL HIGHWAYS AUTHORITY OF INDIA PLAN AND PROFILE
KERALA/KARNATAKA BORDER TO VENGALAM SECTION FROM DATE:- DECEMBER, 2019 PAPER :- A2
HORIZONTAL SCALE 1:2000 (Ministry of Road Transport & Highways) 9th Floor, Infinity Tower C, DLF Cyber City, KM 17.200 TO KM 230.000 OF NH-17 (NEW NH-66) CH. 140+000 to 141+000
0 2 4 6 8 10m Dwarka, New Delhi - 10075 DLF Phase II,Gurgaon-122002, Haryana, India. DRAWN (A) DESIGN (B) CHECKED (C) APPROVED (D)
(PACKAGE-KL/17/I)
(SHEET 1 OF 2)
VERTICAL SCALE 1:200 Package II, Section 2 ( From Exist. Km 137+900 to 170+600)
REV DATE DESCRIPTION OF REVISION JB TP AG APS
( Design Ch. 134+650 to 164+958)
O:\Projects\2016\06-Highways\DELD15170 DPR Kerala Karnataka Border NH17-NH66\05_Cad\5.1_Draft Cad\Package-II\Package-II Plan-Profile\Drawings\PP-120-140.dwg
REV
(%)
LHS
LME
RHS
RME
Vertical
DATE
Horizontal
Alignment
Alignment
Datum = 2.000
Level @ 15m
Level @ 15m
10.000
12.000
14.000
16.000
18.000
20.000
22.000
24.000
26.000
28.000
30.000
32.000
34.000
36.000
4.000
6.000
8.000
Ground below
Ground below
Proposed FRL
Proposed FRL
Proposed LME
Proposed RME
Superelevation
Chainage (KM)
140000 8.988 7.889 8.284 8.076 8.546 8.546
DESCRIPTION OF REVISION
0
0
140060 6.631 7.212 6.905 6.951 8.246 8.246
SCALE : -
2
20
140080 6.168 6.024 6.362 6.329 8.146 8.146
4
40
140100 5.772 5.763 5.871 5.861 8.046 8.046
6
60
G=-0.500
140120 5.519 5.528 5.480 5.491 7.946 7.946
L=582.447m
L=583.657m
10m
100m
140160 5.459 5.294 5.380 5.372 7.746 7.746
Imp proposal:-
Design.Ch.(Km)
Ext. type of Str. :-
CLIENT:-
Ext. span arrangement :-
140+230
140220 5.429 5.225 5.335 5.295 7.446 7.446
Design.Ch.(Km)
Ext. type of Str. :-
5.225
Chainage=140398.186m
140+420
DESIGN CONSULTANT:-
140460 5.199 4.850 5.033 5.017 6.628 6.628
L=95.000m
140480 5.199 4.854 5.033 5.017 6.815 6.815
L=150.000m
R=5000.000m
140500 5.199 4.857 5.036 5.020 7.082 7.082
L=95.619m
140560 5.182 4.841 5.019 5.003 8.350 8.350
L=102.702m
Q=5.000
140620 Q=5.000 5.098 4.761 4.938 4.922 9.850 9.850
Imp proposal:-
Design.Ch.(Km)
Ext. type of Str. :-
PROJECT:-
Prop. type of Str.:-
Chainage=140650.888m
Prop. span arrangement:-
Level=10.622m
L=95.000m
Exi.Ch.(as per Km post) -
TITLE:
Q=2.500
Design.Ch.(Km)
Q=2.500
Ext. type of Str. :-
DESIGN (B)
s pe
MATC
142+002010.77
Exi.Ch.(a 141+860
29
m )
2.29
Design.Ch.(K
CS =141090.84
TS =140942.
ST =141150.84
0
PC =141238.15
SC =1410000
PT =141353.19
63
77
0
CS =141829.63
H
SC =141810.81
TS =141720.81
141+
SC =14
9.
TS =141920.
LINE
141+100
91
141+200
141+300
141+900
141+400
E
ST =141
141+500
141+600
KMS 145
141+700
141+800
W
PRO
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW PROW PROW PROW PROW PROW PROW
PROW
PROW PROW PROW PROW
PROW PROW PROW PROW PROW
PROW PROW PROW PROW
OFC
PROW PROW PROW PROW PROW PROW
PROW PROW PROW PROW PROW PROW PROW PROW
PROW PROW PROW
TS 7
OFC
OFC
OFC
OFC
OFC
OFC
OFC
OFC
OFC
OFC
OFC
W
PRO
OFC
PROW
OFC
OFC
PROW
PROW
OFC
OFC
PROW
OFC
OFC
PROW
OFC
PROW
PROW PROW TS71
OFC
PROW PROW PROW
PROW
OFC
PROW
TS73
OFC
PROW PROW PROW
PROW PROW PROW TS72
PROW PROW PROW PROW PROW PROW PROW PROW
PROW
TS76
PROW PROW PROW PROW PROW PROW PROW
PROW PROW PROW PROW PROW PROW PROW
PROW PROW PROW
MATC
TS75
MATCH LIN
TS74
H LINE
Str. No: -
Ext. type of Str. :-
Ext. span arrangement :-
E
Imp proposal:-
Prop. type of Str.:-
KEECHE Prop. span arrangement:-
RI Exi.Ch.(as per Km post) -
Design.Ch.(Km) 141+340
VELAPURAM
VELAPURAM
RHS
RME
Vertical
DATE
Horizontal
Datum = 0.000
Level @ 15m
Level @ 15m
10.000
12.000
14.000
16.000
18.000
20.000
22.000
24.000
26.000
28.000
30.000
32.000
34.000
2.000
4.000
6.000
8.000
Ground below
Ground below
Proposed FRL
Proposed FRL
Proposed LME
Proposed RME
Superelevation
Chainage (KM)
AlignmentL=80.000m
141000 5.687 6.099 6.269 6.186 14.836 14.836
L=675.000m
AlignmentR=-13500.000m
141020 5.528 5.588 5.956 5.883 14.804 14.804
DESCRIPTION OF REVISION
0
0
Q=2.500
Q=2.500
141060 5.439 5.373 5.834 5.732 14.651 14.651
Str. No: -
L=61.215m
SCALE : -
R=-1200.000m
2
20
Imp proposal:-
141080 5.469 5.333 5.714 5.679 14.530 14.530
Design.Ch.(Km)
Ext. type of Str. :-
4
40
141100 5.286 5.298 5.591 5.579 14.380 14.380
6
60
141120 4.906 5.262 5.546 5.530 14.199 14.199
141+112
CLIENT:-
141200 5.216 5.012 5.392 5.403 13.182 13.182
L=71.092m
141220 5.263 5.040 5.389 5.389 12.854 12.854
Imp proposal:-
L=115.035m
R=-10000.000m
141320 5.204 3.664 5.527 5.504 10.768 10.768
Chainage=141325.888m
Ext. span arrangement :-
Level=10.622m
Exi.Ch.(as per Km post) -
G=-2.500
L=154.452m
141420 5.236 5.239 5.441 5.403 8.269 8.269
DESIGN CONSULTANT:-
Q=2.500
141460 5.125 5.376 5.379 5.298 7.269 7.269
Q=2.500
141500 5.292 5.215 5.243 5.161 6.305 6.305
L=367.623m
L=120.000m
R=5454.546m
141560 4.694 5.069 5.157 5.065 5.351 5.351
PROJECT:-
141640 4.862 4.667 4.935 4.900 4.962 4.962
G=-0.300
L=79.367m
Chainage=141679.707m
141680 4.191 4.254 4.595 4.544 4.842 4.842 Level=4.843m
Chainage=141779.707m
141780 3.719 3.597 3.845 3.754 4.844 4.844 Level=4.843m
Str. No: -
Q=2.800
Q=2.800
L=18.815m
R=-1000.000m
TITLE:
Q=2.500
L
Chainage=142014.286m
Level=5.547m
142020 4.513 3.538 4.867 4.893 5.562 5.562
AG
APS
PAPER :- A2
DWG NO.: - AECOM/HW/DELD15170/DPR/ PP/126A
0
+10
Prop. type of Str.:-
ST = 1920. 77
3
19. 6
143
SC =142451.83
MAT
TS =142346.83
490.96
Exi.Ch.(as per Km post) -
3
.77
1419
2.7
MA
Design.Ch.(Km) 142+130
14
CH L
PAP
42010
KANNUR BYPASS
143 4301
TS =
142+400
TC
ST =142198.82
PIN
CS =142
SC =1000
CS =142103.82
0
0
142+300
OW
ISS
+0 0
PR
142+50
HL
=1
600 5.96
INE
E
142+200
142+
W
0. 02
PRO
RI
142+100
W
ST
O
INE
PRO PR
142+=14259
3
W
142+ 42907.7
PRO W
RO
1426
W P
PROW PROW PROW PROW PROW
PROW
715.02
PROW PROW
PROW PROW OW
PROW
PROW PROW PR
TS =
ST
PROW
900
PROW PROW PROW
1
PROW PROW
PROW OW
CS =
PROW PROW PROW PRO PR
0
W
SC =142
142+70
PRO W OW
142+800
W PRO PR
OFC
W
PRO PRO
W W W
PRO PRO PRO PRO
W W
W
PRO PRO PRO
OFC
W PROW PROW W OW
PROW PROW PR
PROW PROW PROW PROW PROW PROW
PROW PROW PROW PROW
PROW PROW PROW OW
PROW PROW PROW PR
OFC
OFC
PROWS77
PROW PROW
OFC
PROW PROW
OW
MA
Str. No: - PRO PR
W
MAT
PRO
Ext. type of Str. :-
OFC
W W
PRO
TC
PRO
Ext. span arrangement :- W W
HL
PRO
CH L
PRO
Imp proposal:- W
W
PROW PRO
INE
Prop. type of Str.:- PROW PROW
INE
OFC
TS C K
78 an
Imp pro arrangeme PA Exi. n.Ch.(
ig
Prop.
posal:
-
nt :- P PI Des
Prop.
type o
f Str.:- N IS
sp
Exi.Ch an arrangem
.(a ent:-
SE
Design s per Km p R
OFC
.Ch.(K
m)
ost)
-
I
142+5
7 5
PAP
P INIS
SE RI
Chainage=142122.935m
10.000
Chainage=142452.753m
Chainage=142552.753m
Level=5.547m
Level=5.435m
8.000
Level=3.770m
Level=3.668m
6.000
4.000
2.000
0.000
Datum = -2.000
Proposed FRL
5.504
5.562
5.599
5.606
5.584
5.532
5.450
5.349
5.248
5.147
5.046
4.945
4.844
4.743
4.642
4.541
4.440
4.340
4.239
4.138
4.037
3.936
3.835
3.736
3.663
3.622
3.613
3.636
3.690
3.750
3.810
3.870
3.930
3.990
4.050
4.110
4.170
4.230
4.290
4.350
4.410
4.470
4.530
4.590
4.650
4.710
4.770
4.830
4.890
4.950
5.010
5.070
LME
Proposed FRL
5.504
5.562
5.599
5.606
5.584
5.532
5.450
5.349
5.248
5.147
5.046
4.945
4.844
4.743
4.642
4.541
4.440
4.340
4.239
4.138
4.037
3.936
3.835
3.736
3.663
3.622
3.613
3.636
3.690
3.750
3.810
3.870
3.930
3.990
4.050
4.110
4.170
4.230
4.290
4.350
4.410
4.470
4.530
4.590
4.650
4.710
4.770
4.830
4.890
4.950
5.010
5.070
RME
Ground below
-0.016
4.773
4.893
4.692
3.670
3.331
4.126
3.000
2.799
2.602
2.531
2.621
2.711
2.395
2.251
2.070
1.820
2.202
2.200
2.037
2.003
1.148
0.937
1.125
0.719
0.856
0.518
0.307
1.207
0.461
0.817
0.844
0.777
0.475
0.362
0.118
0.163
0.332
0.249
0.479
0.636
0.652
0.637
0.562
0.482
0.401
0.325
0.246
0.165
0.219
0.310
0.401
Proposed LME
Ground below
-0.062
4.795
4.867
4.950
4.406
3.348
4.125
2.989
2.787
2.590
2.568
2.658
2.741
2.415
2.270
2.089
1.843
2.179
2.205
2.049
1.994
1.165
0.922
1.099
0.708
0.827
0.514
0.398
1.303
0.470
0.817
0.841
0.796
0.494
0.349
0.040
0.115
0.278
0.211
0.429
0.642
0.658
0.645
0.569
0.488
0.407
0.331
0.251
0.167
0.223
0.314
0.405
Proposed RME
Level @ 15m
2.929
3.538
3.412
3.256
3.425
3.335
3.115
2.825
2.458
2.274
2.251
2.341
2.226
2.063
1.882
1.592
1.913
2.144
1.989
2.086
1.101
1.049
1.254
1.233
1.143
0.984
1.225
1.969
0.068
0.191
0.958
0.706
0.583
0.499
0.448
0.418
0.587
0.710
0.651
0.617
0.596
0.592
0.560
0.490
0.415
0.341
0.279
0.212
0.145
0.179
0.271
0.364
LHS
Level @ 15m
-0.110
-0.122
-0.193
-0.362
-0.264
-0.363
-0.154
4.341
4.513
4.217
4.469
4.696
4.868
3.670
3.235
3.917
2.922
3.029
2.860
2.613
2.459
2.278
2.017
2.108
2.119
2.099
2.000
1.059
0.723
0.767
0.516
0.251
1.802
0.561
0.459
0.787
1.052
0.705
0.402
0.234
0.426
0.718
0.546
0.549
0.472
0.425
0.357
0.271
0.193
0.262
0.354
0.445
RHS
R=450.000m
Horizontal R=-550.000m L=105.000m
L=39.124m L=105.000m
Alignment L=95.000m L=148.014m L=14.068m L=105.000m R=-450.000m
L=93.046m L=192.703m L=105.000m
R=12425.376m G=0.300
Vertical L=100.000m L=503.523m
L=108.649m
Alignment R=-13500.004m
L=329.818m
G=-0.505
Superelevation Q=5.000 Q=2.500 Q=2.500 Q=5.000 Q=2.500 Q=2.500 Q=5.000
(%)
Q=5.000 Q=5.000 Q=5.000
142000
142020
142040
142060
142080
142100
142120
142140
142160
142180
142200
142220
142240
142260
142280
142300
142320
142340
142360
142380
142400
142420
142440
142460
142480
142500
142520
142540
142560
142580
142600
142620
142640
142660
142680
142700
142720
142740
142760
142780
142800
142820
142840
142860
142880
142900
142920
142940
142960
142980
143000
143020
Chainage (KM)
6
3380.0
143+500
00
.48
143+4
4
SC =1
600
632
143+
143
.06
PROW PROW PROW PROW
PROW PROW
=
275
300
PROW PROW
CS
W PROW
PRO
143
+
143
W PRO
PRO W
1.2 8
W PRO
TS
PRO
1
+70
37437.4
W
W
PRO
143
OW
PR
=14437
200
W
PRO PROW PROW PROW
W
TST =1
PROW RO
+
PROW PROW P
143
W
PRO PROW
PROW W
S
PRO RO
W W P
PRO PRO W
W PRO
W PRO W
W
0
PRO
O
1.21
PR
+8 0
0
W W
PRO PRO
+1 0
W
PRO
143
OW
4386
PR
MATCH LINE
W
PRO
143
W
W
3
RO
PRO
Str. No: -
P
12.7
MA
100
OW
W Str. :-
Ext. type of
PR
PRO
1
W
PRO
W
:-
rangement
SC =
RO
00
144+
T CH
P
Ext. span ar
430
W OW
PRO
144+000
W PR
143+9
PRO
0
al :-
Imp propos
+00
OW
1
W PR
PRO
W
of Str.:-
W PRO
=
PRO
LIN
Prop. type
143
t:-
T
W
arrangemen
OW PRO
W PRO
S
Prop. span
PR W
PRO W PRO
st) -
E
pe r K m po PRO
Exi.Ch.(as
W
PRO
W PRO 143+450 OW
PR
W
PROW
PROW
(Km) PROW
W PRO
W Design.Ch. PROW
PROW PROW PROW
PRO OW
PR
W
PRO
W PRO
W O
W PR
PRO
W PRO
W
W W PRO
PR O PRO
PRO
W W
PRO
W PRO
KANNUR BYPASS
PROW
W PROW PROW
PRO PROW PROW
PROW PROW PROW
W
PRO
W Str. No: -
PRO
Ext. type
MA
of Str. :-
MATCH LINE
W
PRO
Ext. span
arrangem
TCH
PROW ent :-
Imp prop
osal:-
Prop. typ
e of Str.:-
LIN
Prop. spa
n arrange
o: - Exi.Ch.(a ment:-
. :-
E
Chainage=144020.351m
Prop. type of Str.:- Prop. type of Str.:-
Prop. span arrangement:- Imp proposal:-
Prop. span arrangement:-
10.000 Exi.Ch.(as per Km post) - Prop. type of Str.:-
Exi.Ch.(as per Km post) -
Chainage=143785.485m
Prop. span arrangement:-
Level=5.890m
Design.Ch.(Km) 143+000 Design.Ch.(Km) 143+450
Chainage=143685.485m
Exi.Ch.(as per Km post) -
8.000 Design.Ch.(Km) 143+900
Level=4.009m
Chainage=143056.276m
Level=3.534m
Level=5.178m Chainage=143137.276m Chainage=143851.601m
Level=5.179m Level=4.835m
6.000
4.000
2.000
0.000
Datum = -2.000
Proposed FRL
5.010
5.070
5.130
5.189
5.229
5.239
5.219
5.170
5.110
5.050
4.990
4.930
4.870
4.810
4.750
4.690
4.630
4.570
4.510
4.450
4.390
4.330
4.270
4.210
4.150
4.090
4.030
3.970
3.910
3.850
3.790
3.730
3.670
3.610
3.550
3.507
3.523
3.601
3.741
3.943
4.190
4.440
4.690
4.938
5.160
5.354
5.517
5.651
5.755
5.830
5.875
5.890
LME
Proposed FRL
5.010
5.070
5.130
5.189
5.229
5.239
5.219
5.170
5.110
5.050
4.990
4.930
4.870
4.810
4.750
4.690
4.630
4.570
4.510
4.450
4.390
4.330
4.270
4.210
4.150
4.090
4.030
3.970
3.910
3.850
3.790
3.730
3.670
3.610
3.550
3.507
3.523
3.601
3.741
3.943
4.190
4.440
4.690
4.938
5.160
5.354
5.517
5.651
5.755
5.830
5.875
5.890
RME
Ground below
0.310
0.401
0.492
0.585
0.681
0.750
0.766
0.782
0.797
0.843
0.644
0.504
0.559
0.645
0.731
0.817
0.903
1.057
0.929
1.238
1.286
1.232
1.407
1.061
1.143
1.129
1.063
1.021
1.003
1.029
1.120
1.118
1.070
1.102
1.123
1.085
1.022
1.020
1.027
1.215
1.244
1.093
0.675
0.796
0.755
0.729
0.708
0.697
0.794
0.869
0.885
0.909
Proposed LME
Ground below
0.314
0.405
0.496
0.588
0.683
0.762
0.778
0.794
0.809
0.860
0.662
0.503
0.560
0.646
0.732
0.818
0.904
1.050
0.943
1.253
1.295
1.236
1.398
1.207
1.138
1.126
1.061
1.027
0.998
1.020
1.111
1.116
1.047
1.078
1.100
1.064
1.001
1.010
1.016
1.201
1.251
1.065
0.698
0.815
0.749
0.727
0.718
0.689
0.787
0.857
0.872
0.896
Proposed RME
Level @ 15m
0.271
0.364
0.458
0.559
0.615
0.631
0.647
0.663
0.678
0.716
0.627
0.771
0.548
0.634
0.720
0.808
0.970
1.058
0.790
1.133
1.280
1.355
1.320
1.175
1.160
1.150
1.139
1.053
1.055
1.173
1.171
1.084
1.087
1.126
1.179
1.201
1.206
1.213
1.205
1.141
1.087
1.130
1.098
0.522
0.638
0.703
0.769
0.765
0.865
0.969
1.012
1.268
LHS
Level @ 15m
0.354
0.445
0.536
0.627
0.717
0.809
0.897
0.913
0.954
0.954
0.743
0.567
0.691
0.888
0.950
0.828
0.913
0.998
1.082
1.440
1.379
1.322
1.319
1.180
1.175
1.239
1.104
1.092
0.947
0.931
1.019
1.089
1.032
0.977
0.946
0.933
0.869
0.867
0.873
0.980
1.094
0.979
0.918
0.809
0.856
0.768
0.694
0.627
0.697
0.729
0.745
0.789
RHS
R=450.000m
Horizontal L=105.000m
L=252.424m L=105.000m
Alignment L=262.335m L L=120.000m R=-400.000m
L=319.064m
R=6451.613m G=1.250
Vertical L=100.000m L=66.115m
L=81.000m L=168.750m
Alignment L=548.210m R=-13500.000m
R=-13500.000m G=-0.300
Superelevation Q=2.500 Q=2.500 Q=5.000 Q=2.500 Q=2.500 Q=5.000
(%)
Q=5.000 Q=5.000
143000
143020
143040
143060
143080
143100
143120
143140
143160
143180
143200
143220
143240
143260
143280
143300
143320
143340
143360
143380
143400
143420
143440
143460
143480
143500
143520
143540
143560
143580
143600
143620
143640
143660
143680
143700
143720
143740
143760
143780
143800
143820
143840
143860
143880
143900
143920
143940
143960
143980
144000
144020
Chainage (KM)
00
7
30.9
14
145+1
PR
CS =
MA
O
KERALA/KARNATAKA BORDER VENGALAM
1450
AT
TCH
PR
CH
=
O
+00
W
C
W
PRO
LIN
LI
S
.97
145
0
W
NE
PRO
00
PR
.27
935
PR
OW
E
Str. No: -
4+
W
PRO
O
W
915
14
Ext. type of Str. :-
144
W
PR PRO
Ext. span arrangement :-
144
PR OW
=
O W
PRO
0
KANNUR BYPASS
W Imp proposal:-
S
+90
=
20.27
T
W
PR Prop. type of Str.:- PRO
T
OW
S
144
4180.27
PR
0
OW Prop. span arrangement:- W
+10
PRO
93
W
ST =144300.27
PRO
1448
PR
TS =144642.93
OW Exi.Ch.(as per Km post) - W
SC =144737.
144
PRO PRO
W
00
PR
O
Design.Ch.(Km) 144+315
=
PR W W
CS =14
W PRO
144+200
PRO
144+8
O W
S
144+400
144+300
144+500
144+700
144+600
C
W
PR PRO P ROW PRO
OW W
W
PRO
W o: -
PRO
W PRO Str. N
M
PR PROW
MA
PRO W
A
OW W PRO
PROW
TC
PROW
PROW
TCH
PROW W
PR PROW PRO
H
PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW
OW PROW PROW PROW PROW PROW PROW PROW PROW
LI
W
PR PRO
NE
L IN
O W W
PRO
PRO
E
W W
PRO
PRO
W W
PRO
PROW
PROW PROW
PROW PROW
PROW PROW PROW PROW PROW
PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW
- :- :-
No: Str. ent
Str. ype of angem
. t r r
Ext pan a :-
s l
Ext. roposa Str.:- t:-
p p o f men - 00
I m t y p e a nge st) +9
-
p .
Pro . span
a r r
mp
o 144
Str. No: - Str. No: . :- p er K
e of Str Pro h.(as p m)
Ext. type of Str.
:- Ext. typ rr a ngemen
t :- C
Exi. n.Ch.(
K
an ge ment :- s p a n a
sp an arr E x t. ig
Ext.
posal:- Des
Imp propo sa l:- Imp pro tr.:-
type of S nt:-
Prop. type of Str.:- Prop .
a rr angeme
gement:- Prop. s
p a n t) -
Prop. span arran m p o s
144+76
0
18.000 as pe r Km post) - x i. C h .( as per K
Exi.Ch.( 145+635
E K m )
.Ch.(
Design.Ch.(Km ) Design
Str. No: - Str. No: -
18.000 Ext. type of Str. :-
Ext. type of Str. :-
Ext. span arrangement :- Ext. span arrangement :-
Imp proposal:- Imp proposal:-
16.000 Str. No: - Prop. type of Str.:- Prop. type of Str.:-
Ext. type of Str. :- Prop. span arrangement:- Prop. span arrangement:-
Ext. span arrangement :- Exi.Ch.(as per Km post) - Exi.Ch.(as per Km post) -
14.000 Imp proposal:- Design.Ch.(Km) 144+760 Design.Ch.(Km) 144+900
Prop. type of Str.:-
Chainage=144799.526m
Prop. span arrangement:-
12.000 Exi.Ch.(as per Km post) -
Chainage=144749.463m
Level=8.405m
Design.Ch.(Km) 144+315
Chainage=144020.351m
Chainage=144599.463m
Level=7.398m
10.000
Level=5.890m
Level=5.890m
8.000
6.000
4.000
2.000
0.000
-2.000
-4.000
-6.000
Datum = -8.000
Proposed FRL
10.051 10.051
10.290 10.290
10.499 10.499
10.678 10.678
10.828 10.828
10.948 10.948
11.038 11.038
5.875
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.918
6.000
6.136
6.325
6.568
6.864
7.214
7.610
8.012
8.414
8.801
9.158
9.486
9.783
LME
Proposed FRL
5.875
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.890
5.918
6.000
6.136
6.325
6.568
6.864
7.214
7.610
8.012
8.414
8.801
9.158
9.486
9.783
RME
Ground below
10.298 10.054
16.201 16.054
17.348 17.176
17.722 17.681
18.246 18.204
18.228 18.288
15.744 15.820
13.688 13.797
12.323 12.387
12.009 12.362
13.878 13.951
14.794 14.703
-0.559
-2.567
-3.493
-4.250
-4.976
-5.701
-6.405
-6.992
-7.102
-7.040
-6.988
-6.936
-6.884
-6.831
-6.778
-6.726
-6.319
-5.687
-4.901
-4.142
-3.321
-2.630
-1.918
-0.985
0.885
0.909
0.953
1.201
1.222
0.790
0.751
0.907
1.006
0.843
0.911
1.479
1.038
1.131
1.561
4.956
Proposed LME
Ground below
-0.536
-2.546
-3.503
-4.260
-4.987
-5.713
-6.414
-7.002
-7.109
-7.050
-6.998
-6.946
-6.893
-6.841
-6.787
-6.735
-6.318
-5.687
-4.903
-4.148
-3.327
-2.644
-1.937
-0.992
0.872
0.896
0.946
1.190
1.184
0.787
0.723
0.886
0.970
0.807
0.918
1.490
1.015
1.138
1.588
5.185
Proposed RME
Level @ 15m
16.935 14.625
19.053 16.660
18.952 17.253
18.798 17.918
17.605 18.566
15.146 16.846
12.944 14.808
11.682 14.625
11.837 15.154
12.340 15.193
12.898 14.616
-0.846
-2.593
-3.389
-4.146
-4.858
-5.581
-6.320
-6.894
-7.032
-6.942
-6.891
-6.836
-6.782
-6.731
-6.679
-6.628
-6.277
-5.638
-4.870
-4.081
-3.260
-2.489
-1.728
-0.918
1.012
1.268
1.056
1.253
0.965
0.817
0.988
1.112
1.237
1.202
0.953
1.378
1.626
1.459
1.862
3.624
8.376
LHS
12.741
Level @ 15m
-1.146
-2.602
-3.616
-4.361
-5.086
-5.808
-6.452
-7.044
-7.189
-7.137
-7.086
-7.032
-6.981
-6.932
-6.878
-6.817
-6.304
-5.688
-4.918
-4.162
-3.403
-2.782
-2.128
-1.059
0.745
0.789
0.871
1.111
0.811
0.760
0.471
0.678
0.709
0.826
0.936
1.304
0.822
1.172
2.035
6.723
RHS
Horizontal R=-500.000m L=95.000m
Alignment R=-400.000m L=342.657m L=95.000m L=95.000m L=20.706m
L=319.064m L=120.000m L=82.338m
R=7459.356m G=2.011
Vertical L=150.000m L=50.063m
Alignment L=579.112m L=358.281m
G=-0.000 R=-13500.000m
Superelevation Q=5.000 Q=2.500
Q=2.500 Q=5.000 Q=2.500 Q=2.500
(%)
Q=5.000 Q=5.000
144000
144020
144040
144060
144080
144100
144120
144140
144160
144180
144200
144220
144240
144260
144280
144300
144320
144340
144360
144380
144400
144420
144440
144460
144480
144500
144520
144540
144560
144580
144600
144620
144640
144660
144680
144700
144720
144740
144760
144780
144800
144820
144840
144860
144880
144900
144920
144940
144960
144980
145000
145020
Chainage (KM)
Str. No: -
Ext. type of St
r. :-
Ext. span arra
ngement :-
Imp proposal:
-
Prop. type of St
r.:-
KANNUR BYPASS
Prop. span ar
rangement:-
Exi.Ch.(as pe
r Km post) -
Design.Ch.(Km
) 145+740
ST =145183.88
CS =145088.88
PC =145744.07
30.97
MATCH LINE
PT =145923.80
MATCH
145+200
145+300
145+100
145+400
145+500
SC =1450
145+600
145+700
145+800
7
145+900
4935.9
146+000
145+00
LINE
TS =14
PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW
PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW
PROW PROW PROW PROW PROW PROW
PROW PROW PROW PROW
PROW PROW PROW
PROW
PROW
PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW
PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW
PROW PROW PROW PROW
PROW PROW PROW PROW PROW
PROW PROW PROW PROW
PROW
PROW
PROW
MATCH
MATCH LINE
Str. No: - WATER LOGGING AREA
Ext. type of Str. :-
Ext. span arrangement :-
LINE
Imp proposal:-
Prop. type of Str.:-
Prop. span arrangement:-
Exi.Ch.(as per Km post) -
KANNUR BYPASS
Design.Ch.(Km) 145+160
RHS
RME
Vertical
DATE
Horizontal
Alignment
Alignment
Datum = -4.000
Level @ 15m
Level @ 15m
-2.000
10.000
12.000
14.000
16.000
18.000
18.000
0.000
2.000
4.000
6.000
8.000
Ground below
Ground below
Proposed FRL
Proposed FRL
Proposed LME
Proposed RME
Superelevation
Chainage (KM)
Q=2.500
L=95.000m
L=358.281m
145000 12.340 15.193 13.878 13.951 10.948 10.948
R=-13500.000m
145020 12.898 14.616 14.794 14.703 11.038 11.038
DESCRIPTION OF REVISION
Str. No: -
0
0
145060 14.635 13.453 13.709 13.617 11.130 11.130
Imp proposal:-
Design.Ch.(Km)
Ext. type of Str. :-
Q=3.200
Q=3.200
L=57.908m
SCALE : -
R=900.000m
2
20
145080 14.142 12.870 13.208 13.114 11.131 11.131
4
40
145100 13.675 12.286 12.734 12.639 11.103 11.103
145+160
6
60
145120 13.232 11.704 12.284 12.189 11.045 11.045
10m
100m
145160 12.501 10.546 11.435 11.340 10.841 10.841
CLIENT:-
145200 12.530 9.564 10.890 10.726 10.584 10.584
DESIGN CONSULTANT:-
145460 0.517 0.640 0.533 0.537 8.912 8.912
L=560.190m
145480 0.560 0.773 0.686 0.701 8.783 8.783
Design.Ch.(Km)
Ext. type of Str. :-
PROJECT:-
145640 1.834 1.442 0.799 0.742 7.755 7.755
G=-0.643
L=966.350m
(PACKAGE-KL/17/I)
Imp proposal:-
Design.Ch.(Km)
Ext. type of Str. :-
146+500
0
0
146+60
146+40
8.26
9.65
630
670
PROW PROW PROW PROW
PROW
700
PROW PROW
14
0
PROW
PROW
=14
+30
=
+
PROW
PROW
146
SC
PROW
146
W
PRO
CS
PRO
.26
W
PRO W
PRO
213
W
PRO W
5
PRO
146
4.6
W W
PRO
0
PROW PROW PROW
680
PROW PROW PR
ST 6+800
=
+20
OW PROW PROW OW
PR
TS
PROW PROW
=14
146
PR
OW PROW PROW OW
PR
14
W
PRO PRO
W PR
OW W OW
PR PRO Str. No PRO
W
W
: - PR
PR
OW PRO Ext. typ PRO OW
e of Str W
0
Ext. sp . :-
0
OW
+90
an PR
+10
OW PR PR
PR Imp pro arrangemen OW OW
posal:- t :-
146
OW -
146
OW PR Str. No: . :- Prop. ty PR
OW
PR
OW
PR
e of Str pe of S
MA
PR
OW Ext. typ rr a ngemen
t :- Prop. s
pan arr
tr.:-
MA
PR
OW
s p a n a Exi.Ch angem
PR
OW
PR
OW
x t.
TC
E .(as pe ent:-
OW posal:- r Km p
Imp pro
TC
OW PR
tr.:- Design ost) Str PR PR
H
PR
pe of S .Ch.(K . OW O
0
- Ext No: -
W
. ty nt:- m)
Prop angeme
+00
HL
0
OW
LIN
PR a rr . ty
t) -
+00
OW p a n 146+6 PR PR
PR Prop. s m p o s 0 00 Ext pe OW OW
146+40
146
o
as per K .
Imp span f Str.
INE
E
OW .(
147
OW PR E x i. C h :-
.80
K m ) p a PR PR
PR
.Ch.( Pro ropo rrang OW OW
OW Design p s em
923
PR
OW PR Pro . type al:- ent PR PR
p :- O OW
Exi . spa of Str
W
145
OW
OW PR .Ch na .:-
PR De . r r PR PR
sig (as pe ange OW OW
=
OW
KANNUR BYPASS
n.C me
PR h.(K r Km
PT
OW n
PR
m) pos t:- PR
OW
PR
OW
PR
OW t)
OW -
PR PR
OW
PR
OW
OW 146
OW PR
PR + 800 PR PR
OW OW
OW
PR Str
.
Ext No: -
PR
O W
OW . ty
PR
Ext pe PR
MA
. o
Imp span f Str.
OW
M
OW
PR
AT
:
Pro ropo arran -
p
TC
PR
g O
Pro p. typ sal:- emen
OW W
C
PR
H
HL
p t :-
Exi . spa of St PR
OW
LIN
W
RO . n r
P
De Ch.(a arra .:-
INE
sig
n.C s per ngem
PR
OW
E
h.(K Km en
EA m) pos t:-
G AR t)
-
IN
GG 147
LO + 000
TER
WA
Chainage=146722.868m
Chainage=146803.868m
Exi.Ch.(as per Km post)
Chainage=146460.580m
Chainage=146560.580m
Design.Ch.(Km)
Level=4.641m
8.000
Level=4.170m
Level=3.947m
Level=3.947m
Level=3.461m
Level=3.461m
6.000
4.000
2.000
0.000
Datum = -2.000
Proposed FRL
5.440
5.311
5.182
5.054
4.925
4.797
4.668
4.544
4.433
4.336
4.252
4.183
4.122
4.062
4.002
3.942
3.882
3.822
3.762
3.702
3.642
3.582
3.522
3.462
3.414
3.389
3.388
3.411
3.459
3.519
3.579
3.639
3.699
3.759
3.819
3.879
3.939
3.988
4.008
3.998
3.958
3.899
3.839
3.779
3.719
3.659
3.599
3.539
3.479
3.419
3.359
3.299
LME
Proposed FRL
5.440
5.311
5.182
5.054
4.925
4.797
4.668
4.544
4.433
4.336
4.252
4.183
4.122
4.062
4.002
3.942
3.882
3.822
3.762
3.702
3.642
3.582
3.522
3.462
3.414
3.389
3.388
3.411
3.459
3.519
3.579
3.639
3.699
3.759
3.819
3.879
3.939
3.988
4.008
3.998
3.958
3.899
3.839
3.779
3.719
3.659
3.599
3.539
3.479
3.419
3.359
3.299
RME
Ground below
-0.065
-0.147
-0.265
-0.374
-0.394
-0.252
-0.176
-0.053
-0.028
-0.058
-0.083
-0.109
-0.130
-0.153
-0.177
-0.189
-0.215
-0.231
-0.248
-0.268
0.758
0.803
0.842
0.875
0.903
0.931
0.958
0.862
0.756
0.581
0.400
0.246
0.094
0.071
0.095
0.120
0.146
0.154
0.031
0.116
0.194
0.257
0.290
0.314
0.346
0.386
0.393
0.274
0.145
0.072
0.037
0.003
Proposed LME
Ground below
-0.077
-0.164
-0.240
-0.366
-0.389
-0.255
-0.149
-0.022
-0.026
-0.052
-0.077
-0.099
-0.124
-0.142
-0.158
-0.178
-0.199
-0.217
-0.236
0.761
0.805
0.847
0.880
0.908
0.938
0.967
0.865
0.741
0.576
0.396
0.254
0.102
0.078
0.100
0.121
0.155
0.165
0.039
0.143
0.227
0.290
0.316
0.351
0.377
0.422
0.453
0.283
0.269
0.194
0.091
0.033
0.002
Proposed RME
Level @ 15m
-0.044
-0.235
-0.372
-0.371
-0.368
-0.287
-0.256
-0.169
-0.042
-0.077
-0.112
-0.143
-0.173
-0.201
-0.229
-0.251
-0.273
-0.290
-0.314
-0.335
-0.350
-0.368
-0.387
0.631
0.629
0.673
0.708
0.688
0.678
0.667
0.632
0.563
0.426
0.285
0.185
0.041
0.045
0.082
0.119
0.127
0.155
0.064
0.001
0.084
0.150
0.171
0.190
0.209
0.248
0.208
0.121
0.005
LHS
Level @ 15m
-0.056
-0.161
-0.256
-0.344
-0.325
-0.192
-0.070
-0.010
-0.027
-0.042
-0.058
-0.079
-0.104
-0.116
0.789
0.832
0.869
0.899
0.930
0.962
0.989
0.851
0.714
0.580
0.420
0.293
0.166
0.128
0.143
0.161
0.176
0.158
0.044
0.069
0.219
0.300
0.388
0.451
0.489
0.531
0.488
0.438
0.413
0.645
0.582
0.372
0.148
0.117
0.090
0.067
0.024
0.007
RHS
Horizontal R=600.000m L=95.000m
L=95.000m L=401.390m
Alignment L=289.461m L=336.655m
(%)
Q=5.000
146000
146020
146040
146060
146080
146100
146120
146140
146160
146180
146200
146220
146240
146260
146280
146300
146320
146340
146360
146380
146400
146420
146440
146460
146480
146500
146520
146540
146560
146580
146600
146620
146640
146660
146680
146700
146720
146740
146760
146780
146800
146820
146840
146860
146880
146900
146920
146940
146960
146980
147000
147020
Chainage (KM)
6+
OW
KERALA/KARNATAKA BORDER VENGALAM
0
14
+1 0
PR
OW
148
MA
MA
PR
OW
TC
T
CH
OW
0
PR
PR
H
PR
+0 0
OW
OW
LI
0
W
LIN
O
PR
00
148
NE
PR
PR
7+
OW W
OW
E
PRO
14
PR W
O W
PR PRO
OW Str
Ex . No PRO
W
:
0
Ex t. typ -
PR
PR
+90
OW
OW OW
Im t. sp e of PR
PRO
W
147
a
PR
OW PR Pr p pro n ar Str. : PR
OW
o
Pr p. ty posa rang -
OW W
PRO
0
o em W
St Ex p. s pe o l:-
10
r en PRO W
Ex . No
PR
p PRO
1
De i.Ch. an a f Str
PR
7+
OW t :-
1 .3
OW
Ex t. typ : -
W
sig (as rra .:- PRO
14
OW
0
PR
14
Im t. sp e of n.C pe ng
+80
PR
PR h.( r K em PRO
W
47
OW
Pr p pro an a Str. OW Km m e
po nt:- PR
OW
147
=1
o r
Pr p. t pos rang :- ) W
M
st) RO
MA
PR P OW
KANNUR BYPASS
o y a
TS
AT
Ex p. s pe o l:- eme PR
OW PR
OW - W
De i.Ch pan f Str nt O
TC
PR
CH
W
:- 14 PRO
sig .(as arr .:- PR 7+ W
HL
PR
1
n.C pe ng a OW
OW 30 - PR
O
LI
2.6
Str. No:
0
0 PRO
0
h.( r K em
+70
of Str. :-
20
NE
Km m e W
INE
po nt:- p e PRO
766
PR
E x t. ty ment :- OW
7+
) OW PR
arrange PR
147
st) OW
sp a n
14
Ext. OW
14
- PR
- posal: PR
OW
PR Imp pro
T=
PR .:-
pe of Str OW
14 OW O
- PR
Prop. ty gement: -
OW
7+ W
PR
S
n
1.31
00 an a rr a
Prop. sp
OW
0 PR post) PR
0
PR
K m 0 W
OW
as p e r 147+50 PRO
+60
OW
Exi.Ch.(
730
SC 7+300
W
K m) PRO
7502.61
.C h.( PRO
W
Design
147
PR PR
=14
O OW W
W PRO W
RO
14
P
7+500
PR W
OW PRO
147+400
PR
O OW
CS =14
W PR
W
PR
OW PRO W
14
PR
OW W PRO
PRO PRO
r. :- ent :-
W W -
PRO No: f St
W
PRO PRO
m
Str. type o range
PR W
OW PROW PROW W
PRO . r
PROW PROW PROW PROW
Ext span a l:-
PR . a - -
OW
PRO
W
Ext propos f Str.: ment: - 0
p e o n g e t ) +80
PR
O PRO
W I m
p. t
y p
arra pos 147
Pro . span er Km
W
PRO PRO
W
o p s p
W Pr .(a (Km)
.Ch .
Exi gn.Ch
W
PRO
W PRO
PROW s i
PROW De
PROW PROW
PROW PROW PROW PROW
14.000
Str. No: - Str. No: - Str. No: - Str. No: -
Ext. type of Str. :- Ext. type of Str. :- Ext. type of Str. :- Ext. type of Str. :-
12.000 Ext. span arrangement :- Ext. span arrangement :- Ext. span arrangement :- Ext. span arrangement :-
Imp proposal:- Imp proposal:- Imp proposal:- Imp proposal:-
Chainage=147697.640m
Prop. type of Str.:- Prop. type of Str.:- Prop. type of Str.:- Prop. type of Str.:-
Chainage=147900.140m
10.000 Prop. span arrangement:- Prop. span arrangement:- Prop. span arrangement:- Prop. span arrangement:-
Exi.Ch.(as per Km post) - Exi.Ch.(as per Km post) - Exi.Ch.(as per Km post) - Exi.Ch.(as per Km post) -
Chainage=148015.669m
Level=5.703m
Design.Ch.(Km) 147+000 Design.Ch.(Km) 147+300 Design.Ch.(Km) 147+500 Design.Ch.(Km) 147+800
Level=5.197m
8.000
Chainage=147193.031m
Chainage=147093.031m
Level=4.041m
Level=3.180m
Level=3.080m
6.000
4.000
2.000
0.000
Datum = -8.000
Proposed FRL
4.915
5.015
5.115
5.215
5.315
5.415
5.515
5.615
5.715
5.796
5.848
5.871
5.864
5.827
5.760
5.664
5.538
5.383
5.198
4.998
4.798
4.598
4.398
4.198
4.000
3.359
3.299
3.239
3.179
3.119
3.061
3.028
3.027
3.058
3.122
3.215
3.315
3.415
3.515
3.615
3.715
3.815
3.915
4.015
4.115
4.215
4.315
4.415
4.515
4.615
4.715
4.815
LME
Proposed FRL
3.359
3.299
3.239
3.179
3.119
3.061
3.028
3.027
3.058
3.122
3.215
3.315
3.415
3.515
3.615
3.715
3.815
3.915
4.015
4.115
4.215
4.315
4.415
4.515
4.615
4.715
4.815
4.915
5.015
5.115
5.215
5.315
5.415
5.515
5.615
5.715
5.796
5.848
5.871
5.864
5.827
5.760
5.664
5.538
5.383
5.198
4.998
4.798
4.598
4.398
4.198
4.000
RME
Ground below
-0.248
-0.268
-0.283
-0.297
-0.304
-0.315
-0.321
-0.332
-0.342
-0.349
-0.362
-0.370
-0.355
-0.327
-0.301
-0.276
-0.251
-0.229
-0.210
-0.189
-0.174
1.007
0.792
0.044
0.509
0.942
1.380
1.008
1.969
1.534
1.419
1.479
1.534
1.589
1.644
1.699
1.753
1.808
1.708
1.569
1.610
1.798
1.873
2.156
2.353
2.013
1.415
0.837
0.271
0.226
0.331
0.431
Proposed LME
Ground below
-0.217
-0.236
-0.252
-0.265
-0.272
-0.283
-0.289
-0.299
-0.310
-0.316
-0.330
-0.343
-0.345
-0.319
-0.293
-0.266
-0.240
-0.214
-0.195
-0.175
-0.157
0.065
0.533
0.969
1.394
0.948
1.944
1.416
1.426
1.483
1.539
1.594
1.649
1.704
1.758
1.813
1.821
1.682
1.581
1.822
1.914
2.089
2.372
2.057
1.406
0.827
0.263
0.240
0.340
0.456
0.954
0.737
Proposed RME
Level @ 15m
-0.368
-0.387
-0.403
-0.418
-0.424
-0.435
-0.441
-0.451
-0.462
-0.465
-0.459
-0.424
-0.394
-0.360
-0.333
-0.309
-0.284
-0.264
-0.248
-0.236
-0.218
0.011
0.444
0.857
1.301
1.140
1.878
1.634
1.423
1.462
1.516
1.571
1.625
1.679
1.560
1.421
1.282
1.480
1.555
1.838
1.956
2.037
2.107
1.878
1.414
0.839
0.324
0.176
0.269
0.335
0.597
0.998
LHS
Level @ 15m
-0.104
-0.116
-0.133
-0.145
-0.151
-0.162
-0.169
-0.179
-0.190
-0.198
-0.215
-0.226
-0.244
-0.261
-0.246
-0.236
-0.211
-0.178
-0.157
-0.128
-0.110
0.090
0.572
1.026
1.415
1.593
1.589
1.369
1.443
1.500
1.557
1.613
1.668
1.723
1.777
1.832
1.887
1.941
1.969
1.831
1.952
2.166
2.232
1.831
1.301
0.754
0.223
0.308
0.392
0.509
0.744
0.533
RHS
Horizontal R=-390.000m
Alignment L=160.000m
L=201.307m L=160.000m
R=12500.000m G=0.500
Vertical L=100.000m L=504.609m
L=202.500m
Alignment R=-13500.000m L=115.529m
G=-1.000
Superelevation Q=2.500 Q=4.800
(%)
Q=4.800
147000
147020
147040
147060
147080
147100
147120
147140
147160
147180
147200
147220
147240
147260
147280
147300
147320
147340
147360
147380
147400
147420
147440
147460
147480
147500
147520
147540
147560
147580
147600
147620
147640
147660
147680
147700
147720
147740
147760
147780
147800
147820
147840
147860
147880
147900
147920
147940
147960
147980
148000
148020
Chainage (KM)
ngement :-
L
Ex t. sp an ar ra L
os al: -
Imp prop
Str.:-
Prop. type of
op . span ar rangement:-
Pr
D L
-
D CC SR L
L SR L
(a s pe r Km post)
: - Exi.Ch. 148+600
Str. No
SC =148642.41
. :-
L
.(K m )
e of Str Design.Ch CAL
CA
an
CAL
Ext. sp
L
527.41
CA
posal:- CAL
Imp pro
L
148+700
L
tr.:-
CA
148+600
pe of S ent:-
CAL
0.23
Prop. ty L
angem
L
CA D L L
L D CC SR
p a n arr -
SR
TS =148
ro p . s m st)
po 0 L
P 148+00
T
HU
s per K
L
o: -
L
4881
L
0
LT
HU
a
8
.( Str. N Str. :-
S6
C h
800
148+50
i.
T
Ex
HU
pe of ngement :-
L
m ) EP
.Ch.(K
L
t. ty
Design Ex
L L
rra CAL
L
1
a
148+
pan
L 7
BS
S6 L
CA
PROW
Ext. s posal:-
CS =
L
PROW PROW
0
L L
L
PROW
L L
PROW
PROW
148+40
r o
L
PROW
Imp p pe of Str.:-
L L
PROW L
PROW
t:-
L L L L
emen
L
PROW
L
ty
Prop. rrang
L L
- L PROW
PROW
L
n a t) 00
L
0
L L
a s
L L
sp po 148+2
5A L L L
S6
BS L
PROW
Prop. as per Km
L L
PRO
148+30
L L
D CC
3
L L D
SR SR L L L
W
PROW
5.2
L L
L
.(
L
C h
0
Exi. Km) PROW
L
L L L L
PRO L
n.Ch.(
+90
L L
W
892
PROW
L L
0
Desig
L
L L L
PROW
L L
148+20
L
L
PRO L
148
L L
PROW W
L
= 14
L L L
L L L L
L L
PROW
L
6
MATCH
L S6
BS L L
L L
MA
L
L L L
PROW PROW
L
PR
PROW
L
L
PROW PROW OW
0
PROW PROW
L L L L
ST
L L
PROW
L L L D
148+10
D
CC SR L L
PROW
L L L SR
L L
PROW
TC
PROW
L
L
PROW
L
L
L
L PR
L
OW
PROW PROW
L
L
PROW
L L
0
L EP L L
PROW
H
L L
PROW
L
148+00
L 1
L S6
CAL L
PRO PR
PROW PROW
L
W OW
0
LINE
LIN
L L
L L
CA L
PROW
L
Str. No: -
+00
L L
PROW
L
5 L
S6
BS L L
Str. PRO
PROW
L
L
PROW
L
N L
W PR
Ext. type of Str. :- Ext. o: -
0 L
BS
S6
PROW OW
E
149
PROW
L L
PROW
L
L
PRO
type
L
PROW
L
PROW
L
L
Ext. span arrangement :-
L
L
Ext. o W L
span f Str. :-
L
PR
PROW
L L
L
O W
PROW PROW Imp proposal:- L
PR
Imp a OW
PROW prop rrangem
L L
L
PROW
D L
L SR L
D CC
SR
PR
Prop. type of Str.:-
L
PROW
L L
PROW
L
Prop osal: ent : PR
OW L
-
L
PROW -
L
.
PROW
Prop type of S
L L
O
PROW L Prop. span arrangement:- L W L
PROW . spa
PR
tr.:-
L
OW
PROW Exi.Ch.(as per Km post) - PR
CAL
Exi.C n arr
L
CA
OW
PROW
L
h an
Desig .(as per gement
L
Design.Ch.(Km)
L L
PR
PROW 148+678
L L
OW
-
Str. No: K :-
n.Ch PR
.(Km m post)
PROW
UC UC L
OW
of Str. :-
L
L
PROW
Ext. type
L L L
PR
PROW ment :- ) -
L
OW
arrange PR L L
L
PROW a n OW
Ext. sp
L
PROW
148+ L
L L
osal:- 8
KANNUR BYPASS
00
Imp prop
L
PROW PR L
-
e of Str.:
OW
PROW
EP L
p . ty p ent:-
L L
n a PR L
PROW sp a st) -
L
OW
Prop. o
DL L
p
D CC SR
m
L SR
as per K 148+400
UC L
MA
UC L
MATCH
Exi.Ch.(
S6 L L
L
L
PR
.(Km) OW
L
L
.C h
TC
De s ig n L
L
L PR
OW
H
S L
6B
6
GPS
LIN
LINE
Str. No: -
Str. No: -
E
Ext. type of Str. :-
Str. No: - Ext. type of Str. :-
Ext. span arrangement :-
Ext. type of Str. :- Ext. span arrangement :-
Imp proposal:-
Ext. span arrangement :- Imp proposal:-
Prop. type of Str.:-
Imp proposal:- Prop. type of Str.:-
Prop. span arrangement:-
Prop. type of Str.:- Prop. span arrangement:-
Exi.Ch.(as per Km post) -
Prop. span arrangement:- Exi.Ch.(as per Km post) -
Chainage=148975.770m
Design.Ch.(Km) 148+800
Exi.Ch.(as per Km post) - Design.Ch.(Km) 148+678
Str. No: - Design.Ch.(Km) 148+400
Chainage=148844.500m
Ext. type of Str. :-
Level=11.502m
Str. No: - Chainage=148511.500m Level=14.291m
Ext. span arrangement :- Level=13.555m
Ext. type of Str. :- Str. No: -
Imp proposal:-
Ext. span arrangement :- Ext. type of Str. :-
Prop. type of Str.:-
Imp proposal:- Ext. span arrangement :-
Prop. span arrangement:-
Prop. type of Str.:- Imp proposal:-
12.000 Exi.Ch.(as per Km post) -
Prop. span arrangement:- Prop. type of Str.:-
Design.Ch.(Km) 148+000
Exi.Ch.(as per Km post) - Prop. span arrangement:-
Design.Ch.(Km) 148+200 Exi.Ch.(as per Km post) -
10.000 Design.Ch.(Km) 148+600
Chainage=148015.669m
8.000
Level=4.041m
Chainage=148195.669m
Level=5.451m
6.000
4.000
2.000
0.000
Datum = -2.000
Proposed FRL
10.181 10.181
10.694 10.694
11.207 11.207
11.721 11.721
12.234 12.234
12.747 12.747
13.260 13.260
13.768 13.768
14.230 14.230
14.634 14.634
14.983 14.983
15.275 15.275
15.511 15.511
15.690 15.690
15.813 15.813
15.880 15.880
15.890 15.890
15.844 15.844
15.742 15.742
15.583 15.583
15.368 15.368
15.097 15.097
14.769 14.769
14.385 14.385
13.962 13.962
13.537 13.537
13.112 13.112
12.687 12.687
12.262 12.262
11.837 11.837
11.413 11.413
11.019 11.019
10.669 10.669
4.198
4.000
3.857
3.793
3.808
3.903
4.076
4.329
4.662
5.073
5.562
6.075
6.588
7.102
7.615
8.128
8.641
9.155
9.668
LME
Proposed FRL
4.198
4.000
3.857
3.793
3.808
3.903
4.076
4.329
4.662
5.073
5.562
6.075
6.588
7.102
7.615
8.128
8.641
9.155
9.668
RME
Ground below
10.030
-0.060
-0.144
-0.234
-0.315
-0.388
-0.077
1.007
0.792
0.573
0.398
0.223
0.118
0.028
0.135
0.182
8.314
7.961
7.850
7.644
7.293
7.184
7.735
8.854
7.842
8.039
7.863
7.838
7.823
7.815
7.529
7.313
7.476
7.765
8.079
7.643
7.608
7.573
7.540
7.544
7.524
7.439
7.482
7.485
8.007
7.521
7.163
6.951
7.121
7.296
7.474
7.349
Proposed LME
Ground below
10.132
-0.074
-0.160
-0.249
-0.331
-0.405
-0.397
-0.312
-0.240
0.954
0.737
0.519
0.349
0.193
0.096
0.008
8.327
7.923
7.894
7.661
7.268
7.313
7.860
8.005
7.873
7.850
7.831
7.843
7.544
7.269
7.449
7.766
8.083
7.659
7.622
7.579
7.536
7.540
7.540
7.497
7.454
7.540
8.755
7.571
7.222
7.012
7.145
7.328
7.503
7.366
Proposed RME
Level @ 15m
-0.033
-0.108
-0.183
-0.260
-0.350
-0.435
0.597
0.998
0.641
0.348
0.111
0.048
0.009
4.105
6.507
3.411
7.637
7.635
7.633
7.410
7.390
7.474
7.751
8.202
7.852
7.820
7.808
7.830
7.807
7.645
7.478
7.549
7.802
8.168
9.001
7.642
7.620
7.597
7.573
7.559
7.541
7.542
7.540
7.408
7.437
7.308
6.939
6.772
6.948
7.119
7.250
7.204
LHS
Level @ 15m
10.416
-0.012
-0.087
-0.136
-0.217
-0.301
-0.375
-0.317
-0.245
-0.202
-0.112
0.744
0.533
0.312
0.177
0.071
5.062
8.135
8.000
7.697
7.300
8.378
8.238
8.121
7.964
7.955
7.936
7.886
7.868
7.913
7.469
7.086
7.396
7.734
8.073
7.718
7.671
7.626
7.583
7.573
7.590
7.649
7.657
7.610
7.611
7.454
7.259
7.167
7.300
7.445
7.516
7.366
RHS
R=500.000m
Horizontal L=115.000m L=115.000m
Alignment L=864.795m L=167.825m
G=2.566
Vertical R=5047.525m L=315.831m
L=180.000m L=333.000m
Alignment R=-7099.432m L=131.270m
G=-2.124
Superelevation Q=2.500 Q=2.500 Q=5.000
(%)
Q=5.000
148000
148020
148040
148060
148080
148100
148120
148140
148160
148180
148200
148220
148240
148260
148280
148300
148320
148340
148360
148380
148400
148420
148440
148460
148480
148500
148520
148540
148560
148580
148600
148620
148640
148660
148680
148700
148720
148740
148760
148780
148800
148820
148840
148860
148880
148900
148920
148940
148960
148980
149000
149020
Chainage (KM)
PROW
L L L L L
L L
PROW
L
REV
(%)
LHS
LME
RHS
RME
PROW
Vertical
DATE
PROW
Horizontal
Alignment
Alignment
L
L
L
Datum = -4.000
Level @ 15m
Level @ 15m
-2.000
10.000
12.000
0.000
2.000
4.000
6.000
8.000
Ground below
Ground below
Proposed FRL
Proposed FRL
Proposed LME
Proposed RME
Superelevation
Chainage (KM)
PROW
L
PROW
149000 7.516 7.250 7.503 7.474 11.019 11.019 L
L
MATCH LINE
L
MATCH LINE
L
PROW
149+000
149020 7.366 7.204 7.366 7.349 10.669 10.669 L
PROW
L
L
L
DESCRIPTION OF REVISION
L
PROW
L
L
L
0
0
L
L L
149060 7.062 6.830 6.997 6.963 10.101 10.101 L
L L
PROW
PROW
SCALE : -
2
20
149080 6.890 6.631 6.816 6.805 9.882 9.882
PROW
L=309.086m
4
40
PROW
L
L
L
149+100
L
L
6
PROW
60
149120 6.765 6.172 6.611 6.522 9.576 9.576 L
PROW
10m
100m
149160 6.645 5.754 6.277 6.162 9.444 9.444
L
PROW
L
PROW
L
149180 6.622 5.557 6.138 6.027 9.444 9.444 L
CLIENT:-
L
L
PROW
L=400.000m
L
R=9144.087m
PROW
149+200
PROW
L
L L
L
L
L
L
L L
L
L
L
PROW
L L
L L
L L L
L
Imp proposal:-
PROW
Design.Ch.(Km)
L 149+300
L
L
L
PROW
L L
L
Ext. span arrangement :-
L
149320 6.208 5.476 5.928 5.816 L
Prop. span arrangement:-
10.669 10.669 L
PROW
L=189.222m
L
149+370
R=-3000.000m
L
PROW
Imp proposal:-
L
Design.Ch.(Km)
L
Ext. type of Str. :-
L
Prop. type of Str.:-
L
L
PROW
PROW
Chainage=149375.770m
Ext. span arrangement :-
Level=11.753m
Exi.Ch.(as per Km post) -
Q=2.500
PROW
PROW
149+370
PT =149423.54
149440 6.445 5.944 6.228 6.104 13.199 13.199
PROW
L L L
L L L
L
L
PROW
Q=2.500
L
DESIGN CONSULTANT:-
L
G=2.250
PROW
L L
L
L=169.937m
L
149480 6.396 6.477 6.443 6.455 14.099 14.099 L L
L L
L
PROW
PROW
L
L
149520 6.634 6.744 6.693 6.705 14.999 14.999 L
L
PROW
L L
L L L
L L L
Chainage=149545.707m
Level=15.577m
PROW
L
149560 6.865 6.948 6.901 6.910 15.881 15.881 L
LL
PROW
W
L
149600 6.902 6.953 6.929 6.936 L S
R
16.553 16.553 D CC
SR L L
D
149+600
L
L
L
L
PROW
L L L
L L L L
149620 6.942 6.965 6.944 6.952 16.789 16.789 L
L L
Str. No: -
PROW
PROJECT:-
Imp proposal:-
EP L
Design.Ch.(Km)
16.958 16.958
PROW
L
Ext. span arrangement :-
L L L L L
L L L
L
Prop. span arrangement:-
CC SR L W
D L
PROW
SR
D
PROW
CC
CT SR SR
D D
L=225.000m
W
L CC
L
149680 8.588 8.799 7.934 7.927 CT SR
D
17.096 17.096 SR
R=-6000.000m
D
CC
CT EP
149+750
SR
D
L=495.928m
L LW
L L
SR
D
CT
CC .A
PROW
W
L SR
L EP L D
SR W
D L
PROW
CC
O
149700 7.969 7.644 7.686 7.646 17.065 17.065 T1
W S
LL S7 L RD
1 W
Str. No: -
IL SR L
W D
L S SC
CVLA
CLV
VA O CC
EP L B
SS S T1
SR 70 RD
D SR
KANNUR BYPASS
CC
CC
EP LD
W
149+700
L
S SR
L RD CSV
IL D SC
CLV
Imp proposal:-
EP LA VA
W
L
PROW
Design.Ch.(Km)
L
149740 7.968 7.150 7.100 7.068 16.803 16.803
PROW
(PACKAGE-KL/17/I)
Exi.Ch.(as per Km post) -
PROW
L
L
L L
L L
149760 7.834 7.295 7.141 7.091 16.572 16.572 L L
L
L
149+750
L CT
.A
PROW
Chainage=149770.707m
Level=16.421m
PROW
L
L L
L L
L
PROW
L
KM 17.200 TO KM 230.000 OF NH-17 (NEW NH-66)
L
L
PROW
L
149800 8.696 8.485 8.467 8.494 15.981 15.981
EP
Package II, Section 2 ( From Exist. Km 137+900 to 170+600)
CT
/B
CT CT
/B /B 149+800
CONSULTANCY SERVICES FOR PREPARATION OF DPR FOR
CT
KERALA/KARNATAKA BORDER TO VENGALAM SECTION FROM
/B
CT
PROW
CT
/B
149820 8.716 7.517 8.027 7.712 15.681 15.681 L
PROW
L L
L
L L L
L
L
Str. No: -
CT
/B
TITLE:
CT NO
/B .7
3
PROW
Imp proposal:-
Design.Ch.(Km)
Ext. type of Str. :-
L
Prop. type of Str.:-
L L
L
149860 8.126 7.561 7.952 7.855 15.081 15.081
L CT
L .A
L
L L L
PROW
PROW
14.781 14.781
L
L
G=-1.500
PROW
EP
L
L=215.286m
PROW
149+950
L
Str. No: -
L 149+900
PLAN AND PROFILE
L
Ext. type of St
Ext. span arra
L
PROW
Prop. span ar
Imp proposal:-
L
Design.Ch.(Km
PROW
r. :-
)
r.:-
PC =149919.47
L
L
149940 8.337 7.755 8.176
0.119 8.047 13.881 13.881
ngement :-
Km post)
PROW
L
L
rangement:-
L
PROW
L
-
L L L
L L
JB
C
PROW
CAA
L
149+950
PROW
CT
CAC CT
AL L
CT L
149980 7.825 8.148 8.172 8.157 13.281 13.281 L
Chainage=149985.993m L
C T
L
Level=13.191m
TP
MAT
L
VENGALAM
PROW
LINE CH
L
PROW
DESIGN (B)
L
00
DATE:- DECEMBER, 2019
C L L
CA AL 150+0
L CACA
L P O PO
L
CT
L
PPOO
LL
L
CT
L
CT
CT CT
AG
W
MAT
CH L
L
INE
PROW
L
CT CT
L
CT
CT
PRO
PO
W
C CACA
CA AL L
PRO
L
L
W
APS
DWG NO.: - AECOM/HW/DELD15170/DPR/ PP/134
PAPER :- A2
T.A
C
T.A
C EP
150+500
T.A
C
EP
600
EP
1 EP
S8 /A
L
CT
150+
L
CAAL
CA
AL
L
L
C
C
9
S7
0
S8
PY
400
L
L
L 1
L
C
TL
H 2
PROW
C
PROW
PY
TL
PY
3
H
PROW
L
PROW
9.9
CAAL
PROW
AAL
C
PROW
CC
L
L
L L
L
150
L
W
67
PRO
L
PRO
L
BSS7
W
50
L
W
L
T/A
PRO
C L
PRO
=1
W
H
X
BK
XX 81
L
,X S
L
W
0
O L
BK
PT
L
PR PR
70
T/A
7
BS EL
S7
C
XX
X
W
OW
L
L
,X
EHL
L
BK BWK
0+
L
AL
L
A
C
C
L
AL
OW
C
A
C
PR PR
15
H
L
L
BK
BK
O
.5
W
I
L
TO
PROW
I
PROW
L
TO
8
PROW
I
TO
PROW
30 030
L
L
OW PROW
L
X
XX
PR PRO
,X
PR
- W OW
t:
W
L
L L
L
PRO
=1
en
PRO
L
45
L
- W
L
: W W
PC
tr. em 2 RO AL
PR
O BL
PR
L
L
0+
0+
C A
:- OW
C
C A CT
AL
C
P
- f S ng
L
PR
nt
X
XX
-
OW
15
BL
L
15
,X
8
o: e o arra :- .:- me t) W
L
0.4
RO
L
P PR
0
N l r s
T
r. typ n a St ge o
C
CT
W PR OW
80
O
St xt. spa pos of ran m p
82
OW
T
PR
/B
C
N
BA
0+
CT
6
OW
SBS7
r
50
L
E xt. pro pe a r K
T.A
T
PR
C
C
PR
15
60
L
E p . ty pan pe m)
T
PR OW
=1
C
L
L
/B
O
2.
N
W BA A L
Str. W
L
CCA L
L
Im rop . s (as .(K O A
A
C
C
L
3
PR
TS
Ext No: -
L
OW
02
L
P rop h. Ch PR
PR
L
. PR OW
P xi.C gn.
5
Ext type o
L
L
OW
=1
E esi .
L
W f St
Imp span
L
O
PT
L
- r. :-
tr. :-
L
PR W PR
No: t :- a
L
D O PR OW
PR Str. ype of S ngemen Pro propo rrange OW
L
0
t p. t sal: me
20
a
L
Ext. pan arr
L
RDT
.A
Pro ype - nt : PR
OW
CS C
0+
R.ADC
L
p -
L
Realignment l:- Exi . span of Str.
CST
s PR OW
0
PR W
Ext. roposa tr.:- OW
90
5
L T/B
O
L
t:-
C
PR .Ch :
.(as arran -
L
1
p fS men
CW
of Canal p o
0+
- Des
L
Im type arrange ost)
L
425
CCA
AL
AL A
CCA C
/B
g PR
ign
N
15
p 150
W
L
OW
Pro span
L
p
D
D C SR
SR C
O OW
r Km
8
PR
pos t:-
4
.(Km
BSS7
W L
.4
Prop h.(as pe )
L
RO
EP
) t)
40
CT
L
P PR
m
L
C PR
TP
Exi. n.Ch.(K - OW
L
/B
OW
09
OW
CT
L
PR ig
Des 150
5
0
CT
MATCH
OW
=1
+10
L
PR
/B
605
PC =149919.47
D L
BA
N
PR PR
D
SR
C
T
SR
C
C
L
L
L
CA L
OW OW
T
W
SC
CA
O CT
T/B
PR
150
97
C
O /B
L
N
CT T.N L BA
C DRR
DRD
L
L
AL CT
C
M
A
W
C
150+000
PR
L
EP
L W O C
T/B
PR
PR OW
A
O