JOB ELEMENT SHEET
PLANT

Element Name: Option: Basic: Symbols: Safety for


Operator
Critical
Process
C Mandatory
Sequence
Written by:
Quality
Checks

Symbol
Step
# Major Step (What) Key Point (How) Reason (Why)

CLEANING
0

1 LOADING

Team Leader Group Leader Station # history:


Shift Sign.

Date Work Time history (in sec):


Shift Sign.
Date of change:
Date Name Signature Description of change

Shift Sign.

2 27.10.18 Plant -15 added & logo changed

01 25.11.2010 EMS Symbol added

Page 1 PRD-F-01 Rev:02


Date 00 03.06.2009 New

Rev.No. Rev.Date Amendments

Page 2 PRD-F-01 Rev:02


PAGE 1 of 2

Page 3 PRD-F-01 Rev:02


SE BE DRILLING sample

PRD-F-01

Rev. No. 01 Rev.Date:25.11.2010 JOB ELEMENT SHE


Element Name: Option: Basic: Symbols:

SE drilling Boring & BE Boring

Ensure orientation side should be outside &


B press clamp button

Page 1
SE BE DRILLING sample

Press Cycle
Start Button

Page 2
SE BE DRILLING sample

PART NO. PART NAME


MENT SHEET SPLIT CONNECTING ROD ASLY
Symbols: Safety for Critical C Mandatory
Operator Process
Sequence
Written by: Hareesh CG
Quality
Checks

Step
Symbol # Major Step (What) Key Point (How)

CLEANING
0
Clean manually by using brush and cotton
a)Ensure your work place is clean and
mops (after complete usage of cotton
tidy
waste dispose to dust bin.)

b) Wear the mask, hand gloves, shoes,


dialy usage
apron as PPE' S

c)Update start up check list & End up


As per the check list
check list

d) Do the Machine reference Ensure all


By pressing reference axis button
axis in the home position

1 LOADING

a)Load the Component to the fixture as


As shown in the figure A
shown in fig A.

b)Ensure the component is properly


seated ,and Die Number side Should be By pressing clamping button
top

c) Start the operation cycle by pressing green button

Page 3
SE BE DRILLING sample

Team Leader Group Leader Station # history:


Shift Sign.

Date Work Time history (in sec):


Shift Sign.
Date of change:
Date Name

Shift Sign.

01 25.11.2010

Date 00 03.06.2009

Rev.No. Rev.Date

Page 4
SE BE DRILLING sample

PART NAME

NNECTING ROD ASLY


PLANT 7
JES No.
Written by: Hareesh CG
JES/PRD/044

y Point (How) Reason (Why)

ally by using brush and cotton


To keep the equipment healthy and protect
complete usage of cotton
from pollution
se to dust bin.)

to avoid pricking of chips to the finger.

heck list To ensure cleaning & 5s

reference axis button


To avoid machine breakdown.

the figure A To ensure correct loading

clamping button To ensure clamping.

green button To start the operation cycle

Page 5
SE BE DRILLING sample

history (in sec):

Signature Description of change

EMS Symbol added

New

Amendments

Page 6
SE BE DRILLING sample
PAGE 1 of 2

Page 7
Amendment History
Format No.PRD/F/01
Rev No. Date Amendment Name
00 03.06.2009 New
01 25.11.2010 EMS Symbol added
02 27-Oct-18 logo changed Shruthi