# Major Step (What) Key Point (How) Reason (Why)
CLEANING
0
1 LOADING
Shift Sign.
PRD-F-01
Page 1
SE BE DRILLING sample
Press Cycle
Start Button
Page 2
SE BE DRILLING sample
Step
Symbol # Major Step (What) Key Point (How)
CLEANING
0
Clean manually by using brush and cotton
a)Ensure your work place is clean and
mops (after complete usage of cotton
tidy
waste dispose to dust bin.)
1 LOADING
Page 3
SE BE DRILLING sample
Shift Sign.
01 25.11.2010
Date 00 03.06.2009
Rev.No. Rev.Date
Page 4
SE BE DRILLING sample
PART NAME
Page 5
SE BE DRILLING sample
New
Amendments
Page 6
SE BE DRILLING sample
PAGE 1 of 2
Page 7
Amendment History
Format No.PRD/F/01
Rev No. Date Amendment Name
00 03.06.2009 New
01 25.11.2010 EMS Symbol added